小区全套施工组织设计

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

目录第一章编制说明....................................................................................................5第一节编制依据······················································5第二节编制范围及内容·············································5第二章工程概况及工程特点········································5第一节工程环境······················································5第二节工程概况······················································6第三节工程重点、难点及合理化建议···························6第三章组织机构·······················································6第一节组建精干高效的项目管理机构···························6第二节施工组织机构的高效运作·································9第三节保证施工组织机构运作的措施··························10第四章工程管理目标················································11一、工程质量目标·····················································11二、工程进度目标·····················································11三、安全生产目标·····················································11四、文明施工目标·····················································11五、技术资料管理目标···············································11六、施工协调目标·····················································12七、服务目标···························································12第五章施工部署······················································12第一节施工指导方针···············································12第二节技术准备·····················································13第三节施工准备·····················································14第四节资源配备计划···············································14第五节劳动力准备··················································15第六节机械设备准备···············································15第六章质体系的建立与有效运行··································15第一节公司质量保证体系·········································15第二节项目质量保证体系·········································16第三节工程质量监督体系·········································17第四节安全管理体系···············································18第七章施工方案及技术措施······································18第一节施工测量·····················································18第二节土方工程·····················································19第三节基础施工·····················································20第四节钢筋工程·····················································21第五节模板工程·····················································22第六节砼工程·······················································24第七节砖砌体工程··················································25第八节木作工程施工···············································26第九节铁花工艺流程···············································26第十节防水工程·····················································27第十一节饰面铺装工程············································28第十二节油漆工程··················································29第十三节水电安装工程···········································30第十四节绿化工程··················································32第八章质量管理体系与保证措施44第一节建立质量管理机构·········································44第二节建立质量监督体系·········································45第三节实行全面质量管理·········································45第四节各分项工程施工质量保证措施及关键工序组织、搭接措施············································································47第五节计量及试验保证措施·······································53第六节成品保护措施···············································54第七节季节性施工技术措施······································54第八节保证成活率及工程质量、效果的措施·················55第九章工程进度计划与措施·······································60第一节施工工期安排···············································60第二节施工进度网络图············································60第三节确保工期的技术组织措施································60第十章劳动力总体安排计划·······································61第一节劳动力安排的组织措施···································61第十一章施工机械配备·············································62第一节施工机械设备的合理使用································62第二节施工机械设备的保养与维护·····························62第三节拟用于本工程的施工机械设备··························63第十二章安全管理体系与措施及环境保护管理体系与措施63第一节安全生产措施···············································63第二节文明施工措施及管理制度································65第三节“标准化文明工地”保证措施及环境保护措施及管理制度············································································65第四节消防保卫措施···············································67第十三章与其他专业工程交叉施工技术措施第一章编制说明第一节编制依据(一)、由业主提供的施工图纸。(二)、施工调查报告所涉及的施工现场及周边的施工条件、环境、人文等实际情况。(三)、根据国家现行规范、验收标准、施工定额及地方政府有关规定、本企业施工质量控制标准。(四)、本企业依据已建园林景观工程的施工经验适用本工程的施工方法、技术和项目施工管理办法等。第二节编制范围及内容1.本工程施工组织设计是严格按照工程施工图纸和业主对施工组织设计的要求进行质量策划后编制的。在人员、机械、材料供应、平衡调配、施工方案、质量要求、进度安排等方面统一部署的原则下,由土建、安装、园林绿化各专业配合组成。2.我公司高度重视本工程施工组织设计的编制工作,召集曾从事类似工程工作的技术专家、有关负责人攻克本工程的重点、难点及特殊部位的施工技术,力求本方案重点突出,具有呼应性、针对性和可操作性。3.本着对业主负责和资金的合理使用、对工程质量的高度责任感,针对本工程设计特点和使用功能要求,我们编制的原则是:“确保工程质量优、速度快、造价低、操作性强”。同时保证周边和施工现场有良好环境。第二章工程概况及工程特点第一节工程环境1、工程施工环境本工程项目为蒲阳镇上游村灾后重建安置房项目景观绿化及总平工程。工程位于都江堰蒲阳镇上游村。2、本次投标的施工目标(一)、施工图包括的总平工程(构筑物、配套设施、硬质铺地景观)、绿化喷灌系统、水电线路预留预埋、灯具安装、绿化软质景观;(二)、为甲方另行发包的工程提供施工配合。第二节工程概况建设单位成都市民用建筑统一建设办公室工程名称蒲阳镇上游村灾后重建安置房项目景观绿化及总平工程2标段工程地址工程位于都江堰蒲阳镇上游村工程总工期60日历天建设规模/总平工程土方、道路、铺地、水电安装工程强弱点、绿化灌溉工程、水体给排水园林绿化乔木、灌木、草坪第三节工程重点、难点及合理化建议1.该工程质量要求高,必须精心组织、精心施工,确保圆满完成预期目标。2.该工程工序多.各工种之间穿插作业多,做到合理安排使各工种间的协调配合工作,做到过程有监督,事后有检查,始终有记录,具备责任可追溯性,只有这样才能使工程顺利进行。3.本工程施工工期紧,定为60天,按照工期目标,应合理划分施工段组织流水作业,合理组织、调配劳动力,合理布置施工机械

1 / 73
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功