平坝区十字乡大屯河现代烟水示范园一期工程一标段(合同编号:XXQ-YWXDTH-XDYSSFYYQYB)竣工资料(第九卷)施工管理工作报告海南三亚实业有限公司2016年12月目录第一章·工程概况···························011.1工程概况································011.2工程特性及主要经济技术指标························021.2主要建设内容····························021.3设计变更情况··························04第二章·工程招投标··························062.1工程招标·································062.2工程投标······························06第三章·施工进度管理························063.1施工布置原则···························073.2施工布置情况························073.3施工进度···························08第四章·主要工程施工方法······················154.1土石方明挖工程施工······························154.2浆砌石工程施工·························164.3混凝土工程施工·································184.4砂、碎石垫层施工·····························264.5回填土工程施工········································26第五章·施工质量管理···································275.1质量目标····································275.2质量保证体系·····························275.3施工质量控制······························365.4创优规划··································365.5工程施工质量自检情况·························375.6质量事故处理·································375.7工程施工质量情况································37第六章·安全生产与文明施工·····························406.1施工安全管理及措施··························406.2文明施工管理及措施····························426.3施工期环境保护·································43第七章·合同管理·······························457.1价款结算·······························457.2财务管理································45附件··································46附件1:施工管理机构设置情况······························46附件2:项目部主要工作人员情况统计·························47附件3:投入施工的主要工程设备·······················48附件4:工程项目施工管理工程大事记····················49附件5:技术标准目录、施工中使用的技术标准··················50附件6:施工图片····························51会签栏审定:审核:编写:参加人员:1第一章·工程概况1.1工程概况安顺市平坝区十字乡大屯河现代烟水示范园一期工程由贵州水利科技开发有限责任公司严格按照有关要求进行设计,并经贵州省水利厅以黔水烟【2015】6文批准建设。该工程位于安顺市平坝区十字乡境内;该项目的招标人是:安顺市西秀区水务局,现场管理机构是:安顺市西秀区水务局。该项目工程本标段的招标范围为:新建提水泵站一座(装机3*110kw,两用一备)及相应配套设施;铺设安装提水钢管0.926km;新建一座灌区高位水池600m3,新建排洪渠409.1m等,(具体内容详见工程量清单)。该工程本标段主要建设内容为:将军岩泵站水源工程、将军岩提水泵站工程(包括集水池工程、泵房工程、1.5m宽水泥路、提水管工程高位水池工程)、管理房工程,景观台至管理房引水管工程、排洪渠工程(包括渠道工程、交通工程)、金属结构设备及安装工程、机电设备及安装工程等。1.1.1对外交通本工程所在地位于安顺市平坝区十字乡境内,主要对外交通为县道及乡村公路,公路状况较好,基本能满足本工程所需工程物资材料的运输道路条件要求。1.1.2场内交通场内交通主要以县道及乡村公路为主,根据现场实际情况及业主指定位置进行新建或整修。场内交通主要以公路运输为主,并以方便施工,2减少二次运输为原则,使现场施工道路能满足工程安全、进度及质量等方面的要求。1.2工程特性及主要经济技术指标1.2.1工程特性项目工程特性表序号项目单位数量备注1水文利用水文的系列年限年53安顺气象站1957-2013年项目区多年平均降雨量mm13302园区规划规划面积亩142325片区I#片区亩3830II#片区亩32102015年试点区III#片区亩1796IV#片区亩1876V#片区亩3420精品区亩1002015年试点区3主要供水水源将军岩泵站以上集水面积K㎡1218.1取水水源:大屯河付家摊泵站以上集水面积K㎡227.1取水水源:大屯河4灌溉定额花卉类M³/亩100金刺梨M³/亩50中草药M³/亩305年用水量山区现代水利规划区万M³126.732015年实施试点区万M³29.646主要建筑物及设备6.1山区现代水利规划区拦河堰整治座2提水泵站座2总功率550KW灌面亩14232排涝渠M/条380/1水利自动化与信息化亩14232山塘整治座46.2其中:2015年实施试点区提水泵站座1总功率330KW输水干管Km2.063精品区高效节水喷灌亩100官网13.2km,喷头2280套排涝渠M/条380/1水利自动化与信息化亩3310含1个泵站1.2.2主要经济技术指标项目总体规划投资估算2151.40万元,2015年实施方案投资700.31万元,建筑工程投资253.42万元,机电设备及安装工程149.74万元,金属结构设备及安装工程170.09万元,施工临时工程1352万元,独立费用80.19万元,基本预备费33.35万元。1.3主要建设内容:1.3.1将军岩泵站水源工程该分部工程根据设计图纸,用全站仪进行管轴线测设及现场放线。(1)提水管沟槽开挖、过公路段的砼拆除(2)提水管焊接安装、埋设段支墩浇筑、沟槽土方回填;(3)集水池、闸阀井基础开挖、底板混凝土浇筑、侧墙及顶板混凝土浇筑;(4)高位水池基础开挖、主体混凝土浇筑;(5)高位水池周边附属工程施工;(6)泵房基础开挖、主体砌筑、(7)屋面混凝土浇筑,(8)机电设备安装及集水池围墙砌筑、周边零星工程施工。1.3.2管理房及附属工程施工过程:该分部工程先根据设计图纸,用水准仪及全站仪进行管理房独立基础轴线测量及现场放线。(1)管理独立基础开挖、混凝土浇筑;(2)管理房一层主体结构混凝土浇筑;(3)管理房二层主体结构混凝土浇筑;(4)管理房屋面主体结构混凝土浇筑;(5)管理主体模板及外架拆除;(6)管理房主体填充墙砌筑、二次结构施工(7)管理4室内、外装修及门窗安装(8)管理室外附属零星工程施工。1.3.3小濛弄排洪渠工程施工过程:该分部工程先根据设计图纸,用水准仪及全站仪进行小濛弄排洪渠中轴线测量及现场放线。(1)排洪渠原渠道杂草灌木清除、土石方开挖(2)排洪渠侧墙砌筑;(3)排洪渠勾缝及抹面;(4)排洪渠侧墙C15砼压顶浇筑。1.4设计变更情况1.4.1高位水池底板原设计为10cm厚C15砼找平垫层,但在基础石方开挖施工过程中,设计标高以下最深处有约2.35米深的天然溶槽,因基础为岩基,开挖难度大,为保证基础的平整性及安全性,经参加单位现场研究决定,先将高位水池基础溶槽采用C15埋石砼回填,然后再用C15砼将基础垫层找平0.3m,根据各参建单位现场收方测量数据,C15埋石砼回填平均深度为0.83米。1.4.2高位水池闸阀室基础位于坑洼之地的松动岩石之上且四周为高边坡,山体水流较多、较急。为防止溢流管管、排污管以及四周山体水流长期对闸阀室的基础的冲刷,保证基础的稳定性以及水池周边排水通畅,经参建单位现场研究决定:先在闸阀室前砌筑一条顶宽(0.6m,底宽为1.2m高度约1.4m,长9m)的M7.5浆砌石堡坎,堡坎内用石渣回填至地坪基础面,上铺10cm厚碎石垫层,再在水池四周浇筑10cm厚C15砼地坪。1.4.3将军岩上水管水击泄放阀安装过程中,为保证在上游管道压力5升高时能及时将上游的压力水泄放。经参建单位现场研究决定:需在水击泄放阀处配套一根长约8米的Φ325螺旋钢管泄水。1.4.4管理房二楼框架柱表面原设计为仿石材外墙漆,为管理房外墙装饰整体配套性及美观性。经参建单位现场研究决定:将二楼框架柱用防腐木板进行外包装饰,总长度约为56.4米。1.4.5将军岩集水池安装较多的机电及金属设备,为防止路人进入破坏以及考虑到安全性,经参建单位现场研究决定:在集水池周围增设高4.2m、厚0.3m的M7.5浆砌石围墙,外墙铺设青石板,门窗采用不锈钢护栏,围墙上增设玻璃钢瓦拱形屋顶,围墙外增设C20砼地坪及排水沟。1.4.6将军岩拦河堰工程因拦河堰坝顶两侧均为岩石坡体,原坝体无损坏渗漏情况,经参建各方现场研究决定将拦河堰作为示范园区二期工程施工。1.4.7将军岩通村公路至泵房1.5m宽水泥路(240米)占地位置属于猛帮村民养殖场用地,经安顺市西秀区水务局及我单位多次沟通协调无结果,经参建各方现场研究决定取消此段水泥路施工。1.4.8管理房进场3.5m宽道路工程原设计为路面为10cm厚C15砼硬化,考虑到示范园区二期工程大型重车会破坏路面,经参建各方研究决定取消路面C15砼硬化,作为二期工程施工。6第二章·工程招投标2.1工程招标工程的发包人为安顺市西水务局,招投标管理机构为贵州聚泰工程建设咨询有限公司。2.2工程投标我单位通过资格预审,与安顺市西水务局,业主组织投标单位到现场踏勘;并在安顺市公共资源交易中心开标,经评标委员会评审推荐确定海南三亚实业有限公司为中标单位,中标价:贰佰陆拾伍万贰仟伍佰肆拾叁元贰角捌分(¥2652543.28元),招投标管理机构于2016年1月6日核准签发中标通知书。根据业主要求,我单位于2016年1月8日与业主签订了施工合同。2.2.1工程投标程序根据工程建设招投标制要求,工程投标程序详见图2-1。图2-1工程投标程序图第三章·施工进度管理3.1施工布置原则根据合同签订工程项目内容,考虑工期短时间紧,场面窄,工程实工程招标资格预审现场踏勘标书编制投标开标评标定标7行整体布置,全面交叉铺开作业,全方位同时进行,并充分利用其后及空间条件,整体布置原则为:(1)科学合理布置,统筹安排,保证重点;(2)优化节约资源配置,实行动态管理,平行、交叉、流水作业力求均衡生产;(3)安全生产,文明施工,保护环境。3.2施工布置情况3.2.1施工交通布置(1)场外交通布置本工程位于安顺市平坝区十字乡境内,距杨武乡约2.5km。(2)场内交通布置本工程交椅水库施工所需建筑材料及弃碴均采用汽车或手推车运输