料号小时产能良率库存FG0000110099%FG0000250090%FG0000310090%FG000045080%FG0000512090%FG000062590%FG000075095%FG0000815090%FG0000910090%FG000105080%FG000117590%FG0001210090%生产计划排程表3/13/23/33/43/53/63/73/83/93/103/113/12周六周日周一周二周三周四周五周六周日周一周二周三A20140276FG00001120003/8300099%90911000100100090.913/13/13/1010001000100010001000100010001000100091AWO00002FG0000290%50005005000AWO00003FG0000390%10001001000AWO00004FG0000480%50050500AWO00005FG0000590%12001201200AWO00006FG0000690%25025250Line-1#总荷(1为满负荷)1111111110.0911WO00007FG0000795%1100502WO00008FG0000890%33001503WO00009FG0000990%22001004WO00010FG0001080%1100505WO00011FG0001190%1650756WO00012FG0001290%2200100Line-2#总负荷(1为满负荷)…排程说明:(可根据日排单量排产,不必等前一个任务全部完成才能开始下一个任务)1.自动排程规则:第一个任务按计划排产量自动排完订单,后续任务先依剩余产能(或排单量)、再依排单量(或剩余订单量)自动排完订单2.可根据需要手工改动日计划排产量、实际开始日期,排程及开工/完工时间自动调整(排程红色为DELAY交期数量)3.比一般自动排程柔性更强:依排产量同一天可排产多个产品,并自动显示开工、完工时间订单号优先顺序料号订单数量交期库存数量良率需生产数量日产能小时产能日计划排产量开始日期结束日期生产工时实际开始日期3/133/143/153/163/173/183/193/203/213/223/233/243/253/263/273/283/293/303/314/1周四周五周六周日周一周二周三周四周五周六周日周一周二周三周四周五周六周日周一周二