南京工业大学本科生毕业设计(论文)I苏州开发区新建仓库工程施工组织设计摘要本施工组织设计是指针对本工程项目,在开工前针对工程本身特点和工地具体情况,按照工程的要求,对所需的施工劳动力、施工材料、施工机具和施工临时设施,经过科学计算、精心对比及合理的安排后编制出的一套在时间和空间上进行合理施工的战略部署文件。主要内容包括编制依据与编制原则、工程概况、施工部署、施工准备工作、主要项目施工方法及措施、各种保证措施、施工工艺框图等主要内容,编制出针对性的施工组织设计,每个分部分项工程的特点、结构特征、施工难易程度工期和质量要求,编制出切实可行的施工方案,以指导施工并顺利地完成本工程项目的建设,控制工程成本,创建优质工程。关键词:施工组织设计;工程特点;施工方案目录IITheorganizationdesignofTheNewWarehouseAbstractConstructionorganizationdesignisforthisprojectinthepre-constructionfortheprojectitself,andsite-specificcircumstances,inaccordancewiththerequirementsoftheproject,constructionlabor,constructionmaterials,constructionequipmentandconstructionoftemporaryfacilities,scientificcomputing,carefullycontrastreasonablearrangementsforthepreparationofasetofreasonableconstructiontimeandspacestrategicplanfile.Themaincontentsincludethebasisforpreparingthepreparationofprinciples,projectoverview,constructionanddeployment,constructionpreparationwork,constructionmethodsandmeasuresofthemajorprojects,avarietyofmeasures,constructiontechniques,blockcontent,thepreparationofthetargetedconstructiondesign,eachsub-partoftheprojectcharacteristics,structuralcharacteristics,theconstructiondurationofthedegreeofdifficultyandqualityrequirements,thepreparationofarealisticconstructionprogram,toguidetheconstructionandsuccessfullycompletedtheconstructionoftheProject,tocontrolthecostoftheprojecttocreatehigh-qualityproject.Keywords:constructionoforganizationaldesign;engineeringcharacteristics;constructionprogram南京工业大学本科生毕业设计(论文)III目录摘要.....................................................IAbstract................................................II第一章编制说明..........................................11.1编制范围.....................................................11.2编制原则.....................................................2第二章工程概况..........................................32.1工程项目总体概况.............................................32.2建筑设计概况.................................................32.3结构设计概况...............................................32.3.1概况...................................................32.3.2构造措施...............................................4第三章工程目标及施工部署................................53.1施工总体安排.................................................53.1.1工期目标...............................................53.1.2质量目标...............................................53.1.3安全目标...............................................53.1.4项目经理部组成.........................................53.1.5项目经理的职责.........................................63.1.6项目经理的权限.........................................63.2施工布局....................................................73.2.1质量...................................................73.2.2安全...................................................83.2.3材料...................................................93.2.4设备...................................................93.2.5综合管理科............................................103.2.6办公室................................................10目录IV3.2.7劳动力组织............................................113.2.8劳动力配备............................................113.2.9劳动力安排及进退场计划................................123.2.10施工机械的配备.......................................123.2.11施工机械的进退场计划.................................143.2.12土建工程主要检测计量设备配备.........................153.2.13施工组织过程.........................................16第四章施工准备工作及平面布置...........................174.1工程准备....................................................174.1.1规范执行基本建设程序..................................174.1.2技术准备..............................................174.1.3物资准备..............................................184.1.4现场准备..............................................194.2施工现场总平面布置..........................................194.3施工道路及施工生产用地铺筑..................................194.4现场供水....................................................214.5现场供电....................................................214.6清洗台、沉淀池设置..........................................224.7卫生设施....................................................224.8施工总平面管理..............................................22第五章施工进度计划.....................................235.1工期控制....................................................235.1.1施工程序..............................................235.1.2工期保证措施..........................................235.1.3其它保证工期的措施....................................245.2施工总进度计划见附图........................................24第六章各分部分项施工方法和技术保证措施.................256.1测量控制及流程..............................................25南京工业大学本科生毕业设计(论文)V6.1.1建筑物定位放线........................................256.1.2轴线垂直传递..........................................266.1.3高程控制..............................................266.1.4工程测量复核方案......................................266.1.5建筑物的沉降观测......................................276.2基础工程....................................................286.2.1基础结构施工测量......................................286.2.2±0.000以上轴线传递基准点施工测设....................286.2.3±0.000以上轴线垂直传递的控制及复核..................286.2.4竖向标高基准点布置及层高测