南兰江西路南侧开丰路西侧地块项目(二期)桩基工程现场临时用电施工方案编制人:审核人:审批人:宁波建工工程集团有限公司二0一七年六月目录目录··························································1一、编制依据···················································2二、工程概况···················································2三、现场供配电情况·············································31、变配电所得位置··············································32、供电线路的连接方式··········································33、线路敷设方式················································3四、施工现场施工用电机械配备表·································4五、配电线路计算···············································4DX1、DX2总配电用电量计算·······································4配电箱用电量计算·············································5施工现场照明用电量计算·········································6六、避雷装置及接零与接地保护措施·······························6七、现场施工用电安全···········································7(一)、配电箱、开光箱··········································7(二)、现场照明················································8(三)、用电电线及支设··········································9(四)、雨季及夜间施工用电安全·································9八、施工现场防火··············································10九、用电防火措施··············································11十、检查与维修················································11一、编制依据1、《建筑工程施工现场供用电安全规范》GB50194-932、《施工现场临时用电安全技术规范》JGJ46-20053、公司《施工现场安全标准化管理导则》4、施工组织设计5、现场施工条件6、其他设计计算与施工有关规范及规程;7、以往多个类似工程设计计算、监测、施工经验积累。二、工程概况1)、工程名称:南兰江西路南侧开丰路西侧地块项目2)、建设单位:余姚盛建置业有限公司3)、设计单位:浙江华展工程研究设计院有限公司4)、勘察单位:浙江中材工程勘测设计有限公司5)、监理单位:浙江科诚建设监理有限公司6)、施工单位:宁波建工工程集团有限公司余姚盛建置业有限公司经东发改投【2016】52号文件批准,拟进行南兰江西路南侧开丰路西侧地块项目建设。该工程拟建场地位于宁波余姚市,南兰江西路南侧,开封路西侧,世南西路北侧。项目,总建筑面积10.7万m2,其中地上建筑面积7.2万m2,地下建筑面积3.5万m2,拟建工程由1幢23F、1幢20F、1幢14F高层住宅;6幢10F小高层住宅;1~2F商业楼组成,具一层全场地地下室。主楼结构体系由钢筋混凝土核心筒组成;地下室采用框架结构体系。工程桩为Φ600、Φ700钻孔灌注桩。三、现场供配电情况1、变配电所的位置现场变压器两个(分别为400KW和350KW),另我公司进场康明斯型号为VTA28-G6发电机2台,每台发电机额定功率为700KW,现场2台发电机有专业人负责设计安装。在发电机外设接地装置4组。施工现场临时用电直接由MX接出至施工现场总配箱(DX)。2、供电线路接线方式根据施工现场临时用电安全可靠性要求和经济技术要求,现场采用TN-S接零保护系统,实行三级配电,三级漏电保护,对现场个别主要施工机具采用放射式配电,对于综合配电箱及分配电箱采用树干式配电,中小型施工机具可由综合配电箱及开关箱中直接插用。3、线路敷设方式现场干线利用钢管埋地敷设或者沿围墙架立挂设。电缆严禁用金属裸线绑扎在绝缘子上,并严禁架设在树木上或沿地面明设。施工现场动力电缆采用三相五线敷设。现场照明采用三芯橡皮护套电缆,导线不得随地拖拉四、施工现场施工用电机械配备表主要施工机械设备配备表序号机械或设备名称单位功率(KW)数量功率小计Pe(KW)KxPjs=Pe*Kx(KW)1钻孔桩机GPS-10型台552513750.658252钻孔桩机XY-2B型台4062400.751683交流电焊机台108800.6404双轴水泥搅拌桩机台901900.5455旋喷桩基台901900.54566合计18751123我公司的2台发电机和变压器的有效功率为2150KW×0.9=1935KW,总电1935KW﹥1875KW满足现场施工要求。五、配电线路计算(一)1#发电机700KW配电线路计算DX1总配用电量施工机械名称机械数量定额功率(KW)功率小计Pe(KW)KxTagφPjs=Pe*Kd(KW)Qjs=Tagφ*Pjs(KVA)钻孔桩机GPS-108554400.501.2220264交流电焊机410400.501.22024双轴水泥搅拌桩机190900.801.27286.4钻孔桩机XY-2B型3401200.501.26072合计690372446.41)、总电力负荷计算Ijs=Sjs/√3Un=(√Pjs2+Qjs2)0.2/√3Un=235.8KWA2)、总开关及漏电保护器的选择①.总开关选择IH≥1.3Is=1.3×235.8=306.5(A)选用XWC2-04-C4004作为施工现场1#总电源配电箱②.总漏电保护器选择IH≥1.3Is=1.3×235.8=306.5(A)选用四相RMM10LE-200/4300型漏电断路器,额定电流400(A)额定漏电动作电流I△n=150mA额定漏电不动作电流I△n=75mA额定工作电流时间为<0.2S3)、总熔体选择P1max=30KWIH≥IeR=Ijs+2.4P1max=235.8+2.4×30=307.8A选用熔体,IeR=400(A)4)、导线载面积选择IL≥Ijs=235.8(A)选用120mm2铜线为相线,查表IL=260(A)IL=235.8<260故DX1、DX2总箱线路选用VV2—3×240mm2+2×120mm2铝芯电缆线。五)、导线与熔体短路保护校验DX1、DX2总箱线路VV2—3×240mm2+2×120mm2的校验,0.67LeR=0.67×307.8=206(A)IL=235.8(A)(二)、2#发电机700KVA配电线路计算DX2总配用电量施工机械名称机械数量定额功率(KW)功率小计Pe(KW)KXTgφPJS=Pe*Kx(KW)QJS=Tgφ*PJS(KVA)钻孔桩机GPS-108554400.501.2220264钻孔桩机XY-2B型3401200.31.23643.2双轴水泥搅拌桩机190900.801.27286.4合计650328393.61)、总电力负荷计算Ijs=Sjs/√3Un=(√Pjs2+Qjs2)0.2/√3Un=235.82)、总开关及漏电保护器的选择①.总开关选择IH≥1.3Ijs=1.3×235.8=306.5(A)选用XWC2-04-C4004作为施工现场2#总电源配电箱②.总漏电保护器选择IH≥1.3Ijs=1.3×235.8=306.5(A)选用四相RMM10LE-400/4300型漏电断路器,额定电流400(A)额定漏电动作电流I△n=150mA额定漏电不动作电流I△n=75mA额定工作电流时间为<0.2S3)、总熔体选择P1max=30KWIH≥IeR=Ijs+2.4P1max=235.8+2.4×30=307.8A选用熔体,IeR=400(A)4)、导线载面积选择IL≥Ijs=235.8(A)选用120mm2铜线为相线,查表IL=260(A)IL=235.8<260A故DX3、DX4总箱线路选用VV2—3×240mm2+2×120mm2铝芯电缆线。5)、导线与熔体短路保护校验DX3、DX4总箱线路VV2—3×240mm2+2×120mm2的校验,0.67LeR=0.67×307.8=206(A)IL=260(A)(三)、3#/4#变压器400KVA配电线路计算DX3总配用电量施工机械名称机械数量定额功率(KW)功率小计Pe(KW)KXTgφPJS=Pe*Kx(KW)QJS=Tgφ*PJS(KVA)钻孔桩机GPS-106553300.701.2231277.2交流电焊机410400.601.22428.8合计370255306DX3所配备的开关、漏保与前面同样。DX4总配用电量施工机械名称机械数量定额功率(KW)功率小计Pe(KW)KXTgφPJS=Pe*Kx(KW)QJS=Tgφ*PJS(KVA)钻孔桩机GPS-103551650.501.282.599钻孔桩机XY-2B型3401200.31.23643.2交流电焊机410400.601.22448合计325142.5190.2DX4所配备的开关、漏保与前面同样。施工现场照明用电量序号灯具名称规格(KW)数量(盏)容量(KW)等效功率(KW0)1镝灯3.5276.52节能灯50w60.50.5合计7.0六、避雷装置及接零与接地保护措施1、保护零线与电气设备(包括配电箱)连接应采用铜鼻子,不得采用铰接,电气设备(包括配电箱)接线柱应镀锌或涂防腐油脂,工作零线和保护零线在配电箱内应通过端子板连接,其中保护零线在其他地方不得有接头。2、同一施工现场的电气设备不得一部分作保护接零、一部分作保护接地。3、每一接地装置的接地线应采用2根及以上导体,在不同点与接地体做电气连接。4、不得采用铝导体做接地体或地下接地线。垂直接地体宜采用角钢、钢管或者光面圆钢,不得采用螺纹钢。5、接地可利用自然接地体,应该保证其电气连接和热稳定。6、PE线上严禁装设开关或熔断器,严禁通过工作电流,且严禁断线。7、采用TN系统做保护接零时,工作零线(N线)必须通过总漏电保护器,保护零线(PE线)必须由电源进线零线重复接地处和总漏电保护器电源侧零线处引出,形成局部TN-S接零保护系统。七、现场施工用电安全施工用电线路敷设前,做好技术交底工作。由项目技术负责人和安全对电工进行安全技术交底,掌握施工组织设计和临时用电方案要求的电路敷设要求。电路敷设完成后,经验收合格才能投入使用。由项目部对临时电使用班组所有操作人员进行安全技术交底,确保用电安全,并形成书面安全技术交底资料,操作人员全部签字后项目部留档备查。(一)、配电箱、开关箱1、用50mm×50mm角钢做接地极,采用10㎡接地线引入总配电屏(MX),安装端正牢固。2、开关箱内接线,如用绝缘铜线,导线截面不小于2.5㎡,接点都必须牢固紧密。3、单相电源的设备,必须设置单相三眼插座,并在上面布置触电保安开关。4、要明显分开“动力”、“照明”、“单相电器”、电焊机使用的插座和熔断器,不得混合。动力照明分箱设置。5、每路插座应配单独熔断器一组,漏电保安器一只。6、分配电箱与开关箱的距离不得超过30M。配电箱、开关箱周围应有足够二人同时工作的空间和通道