目录一、施工方案、施工组织及管理程序安排········································1二、分部分项工程的施工方法及技术措施········································11三、进度计划及保证措施········································································56四、质量管理体系及保证措施·······························································61五、安全管理体系及保证措施·······························································71六、环境管理体系及保证措施·······························································80七、文明施工、文物保护体系及保障措施········································83八、冬雨季施工保证措施········································································87九、项目风险预测与防范、事故应急预案········································89十、施工总平面图及其他应说明的事项·············································91附表一拟投入本标段的主要施工设备表········································97附表二拟配备本标段的试验和检测仪器设备表··························98附表三劳动力计划表············································································99附表四计划开、竣工日期和施工进度网络图···························100附表五施工总平面图········································································101附表六临时用地表·············································································1021一、施工方案、施工组织及管理程序安排我公司有幸参加肥城市人民检察院办案用房和专业技术用房工程项目的投标,在认真阅读招标文件和对本工程现场实地勘查的基础上,组织了本次工程的投标工作。如能中标,我单位将严格按照施工组织设计进行施工,按期完成任务,确保工程施工质量达到优良等级。肥城市人民检察院办案用房和专业技术用房工程位于肥城市人民检察院院内。该工程为框架结构,由伸缩缝分割成3栋楼房,包括1层1栋、4层(地下1层)1栋、2层1栋,总建筑面积为4722平方米,其中一层部分面积238平方米,二层部分面积894平方米,四层部分面积3590平方米。本施工组织设计包括土建、装饰、水、电、暖及消防等内容。1.1编制依据、原则、指导思想和目标1.1.1编制依据(1)肥城市人民检察院办案用房和专业技术用房工程施工《招标文件》;(2)肥城市人民检察院办案用房和专业技术用房工程设计施工图纸;(3)山东省建筑安装工程消耗量定额、山东省价目表以及费用定额;(4)现行建筑系统的相关标准、规范、规程及国家和地方的法律、法规;(5)目前,我公司的设备配备,技术、施工人员配置及经济势力等情况;(6)我公司以往对同类建筑工程的施工经验。肥城市人民检察院办案用房和专业技术用房工程施工,应满足但不限于下列规范要求:1)《混凝土外加剂应用技术规范》(GBJ119-88)2)《岩土工程勘察规范》(GB50021-2001)23)《建筑地基基础施工验收规范》(GB50202-2002)4)《混凝土工程施工质量验收规范》(GB50204-2002)5)《屋面工程质量验收规范》(GB50207-2002)6)《建筑地面施工质量验收规范》(GB50209-2002)7)《建筑装饰装修工程质量验收规范》(GB50210-2001)8)《建筑电气安装工程施工质量验收规范》(GB50303-2002)9)《钢筋焊接及验收规程》(JGJ18-96)10)《建筑工程施工质量验收统一标准》(GB50300-2001)11)《建设工程项目管理规范》(GB/T50326-2001)12)《建设工程文件归档管理规范》(GB/T50328-2001)13)《机械设备安装工程施工及验收适用规范》GB50231-9814)《现场设施、工业管道焊接施工及验收规范》GB50236-9815)《建筑给水排水及采暖工程施工质量验收规范》GB50242-200216)公司编制《质量保证手册》、《程序文件》、《作业指导书》等有关文件资料。1)依照招标文件各条款,统一标准、规范进行编制;1.1.2编制原则(1)充分遵守合同条款的原则规定;(2)坚持实事求是、精心组织、科学施工的原则;(3)本着少占地,少扰民,保护环境,文明施工,建设让人民放心工程的原则。(4)充分考虑各种不利施工因素,在工期安排、人员、设备配置、施工方法的确定等方面留有施工余地。1.1.3编制指导思想(1)以满足业主对工程质量、工期、安全生产、文明施工的要求,以及环境保护等为前提。(2)施工管理规划(施工组织设计),是指导施工管理的纲领性文件,它对项目顺利实施、质量与效益至关重要,通过对技术措3施、组织措施、经济措施、合同措施的分析,把保证工期、创优质工程和文明施工建立在科学可行的技术管理上。(3)以深化细化施工程序、施工方法、施工进度计划、设备配备以及保证措施的先进性、合理性、可靠性为关键,力求经济合理。(4)以“精”和“严”为准则,对施工全过程的各种活动进行高标准控制,即方案上“精益求精”、工艺上“精雕细刻”、配合上“精诚合作”、管理上“严格要求”、“严格监督”、“严格惩罚”。1.1.4项目工期、质量及安全文明施工目标如果我单位中标,将响应招标文件的全部条款,安排我单位曾参加过类似工程的技术人员参加管理,采取切实可行的措施,确保实现以下管理目标:(1)工期目标确保210天,争取提前。(2)质量目标确保施工质量达到合格标准,争创优良,并对工程质量终身负责。(3)安全目标杜绝死亡、重伤事故;轻伤事故频率控制在3‰以下。(4)文明施工创建市级建筑安全生产文明工地。(5)环境保护遵守国家法律、法规,做到水土不流失,不污染周围环境。(6)管理目标全面推行项目法施工,实行优化组合,动态管理,合理交叉、均衡生产。实现施工质量优良、安全生产无事故、创建文明施工工地、实现经济效益最大化,保证合同工期内完成施工任务。1.2施工部署4为加快施工速度,缩短工期,确保优良,保证安全和文明施工,遵照“先地下,后地上”,“先土建,后安装”“先结构,后装饰”,“外装饰由上而下”的总原则。根据该工程建筑工程平面布置及施工周期较长等特点,拟采用即平行作业又穿插流水的施工方法。即施工准备(临建、三通),场区整平、土方回填工作完成后,整个工程形成该楼施工主线,其它工程项目在以其为施工主线的基础上进行穿插流水施工。各单项工程项目又实施平面分段,立体分层,同步流水的施工方法。具体部署如下:1.2.1施工方法选择工程施工依据现场条件和工程特点,结合我公司技术装备情况等合理组织施工力量。基槽开挖一、二层部分采用条形开挖,四层主楼采用机械大开挖。为防止扰动原土机械开挖至距槽底0.3m时采用人工开挖、清理,多余土方用铲车配合卡车外运。钢筋连接主要为闪光队焊和机械连接,模板选用竹胶板及钢模板配合Φ48×3.5钢管及木方加固,钢顶柱支撑。外脚手架全部采用钢管双排架。施工期间配备两台JZC350型搅拌机进行混凝土、砂浆配制。主体工程施工时,垂直提升先期选用一台QTZ40型塔式起重机,进入墙体砌筑及装饰工程后,再增设1台井架与塔式起重机共同工作,以满足垂直运输的需要。由于本工程占用面积较大,且现场狭小,为加快施工进度投入1部汽车吊进行局部垂直倒运。具体布置见施工平图布置图。1.2.2施工任务划分整个工程无外包项目,均由我公司承担。按照总工期安排,结合本工程特点,整个工程在项目经理的统一领导下共组建三个施工专业队,即土建施工队、安装工程专业队和装饰装修工施工队。土建工程队包括瓦工(包括混凝土)、钢筋、木工等工种。主体工程砌筑、混凝土、钢筋、木工四个作业班组穿插流水施工。整个工程以基础、主体和内外装饰为重点,其它工程穿插进行。在项目经理领导下,各工程队各负其责,协同作战,具体分工如下:5(1)土建工程队负责全部土建工程的施工。签定合同后,主体队伍即进入施工现场,除做好地基处理工作外,同时搞好现场的临时设施。地基经有关部门检验合格后,开始进行基础工程和主体工程的施工。(2)装饰装修队伍提前作好准备。主体进入五层后即开始内墙抹灰等工作。(3)安装工程队负责全部的水、电、消防、空调等的安装工程,除随主体施工做好预留、预埋的工作外,视工程进度不断扩充力量,穿插施工安装工程。1.2.3施工顺序总的施工顺序是按基础、主体和装饰装修三个施工阶段进行。基础施工按单栋楼先施工四层部分,然后再施工一层、二层楼体的施工顺序组织流水作业。主体工程采用自下而上的分层、分段流水施工法。在整个施工过程中,安装工程的预留、预埋、安装、调试工作应始终贯穿于主体、装饰、装修和收尾过程中,在时间和空间上要充分紧凑搭接,循环推进,严格交接班制度,相互爱护成品,避免交叉污染。1.2.4流水段划分本工程为现浇钢筋混凝土框架结构,结构工程主要由钢筋、模板、混凝土浇筑三大工序组成。根据工程结构特点,结合钢筋加工、绑扎能力,模板配备数量、周转次数、塔吊日吊运次数等,主体工程按单体划分成三个流水段进行施工。柱、梁、板模板按3层配制。1.2.5施工准备为确保工程施工的正常进行,应按平面布置图要求,合理布置施工现场,做好现场施工的准备工作。1.2.5.1施工现场准备(1)施工现场控制网测量根据综合永久坐标和高程,按照建筑总平面图要求,进行施工场地控制网测量,设置场区永久性控制测量标注桩。6(2)做好施工场地“三通一平”根据平面图要求和工程场地地形,结合基础工程做好施工现场水通、电通、道路通和场地平整。1)、场地平整:动工前,根据设计图纸及施工平面布置图要求进行清平场地,取高填洼,并拆除相关障碍物。2)、临时道路:根据施工平面布置图要求修筑临时道路,并作好明水排水沟。3)、施工用水:施工用水计算:本工程现场施工用水主要有施工用水、生活用水和消防用水三大部分。A、施工用水P1:以8h混凝土连续浇筑量计算最大用水量,计算公式:计算公式:P1=3600818001105.115.1360081121QNKK=11.86L/S试中:K1—未预料的施工用水系数,取1.15;K2—用水不均衡系数,取1.5;Q1—以混凝土搅拌机8h的搅拌量(110m3)计;N1—用水定额。每m3现浇混凝土耗水量,取1800L;B、生活用水P2:现场施工高峰人数以80人计算,每人每天用水以N2=25L计算。P2=360085.1258036008222KNQ=0.1L/SC、消防用水P3:现场面积小于25hm2,消防用水定额按P3=10L/S考虑,7现场总用水量:因P1+P2=11.96P3故,现场总用水量取Q=P1+P2=11.96L/S供水管径按下面公式计算D=10005.114.3.96.11410004Q=0.1m经上述计算,结合防火要求,干管选用DN100mm的镀锌管。管路敷设:水源由现有供水干管接入,在场内组成枝