1目录第一章工程概况··············································································21.1编制依据·············································································21.2工程概况·············································································21.3场平土方工程概况·································································41.4自然条件···········································································4第二章施工部署············································································6第三章施工进度计划······································································8第四章施工准备及资源配置措施······················································8第五章施工方案············································································10第六章工程质量保证措施································································15第七章安全生产保证措施·······························································20第八章雨季施工保证措施·······························································23第九章地下地上管线及其他设备加固措施·········································24第十章工程进度保证措施·······························································25第十一章确保文明施工、文物保护措施············································26第十二章环境保护及水土保持措施··················································27附表一:拟投入本工程的主要施工设备表···········································31附表二:拟投入本工程的主要材料试验、测量及质检仪器设备表·············31附表三:劳动力计划表···································································31附图四:场平土方回填路径图··························································322第一章工程概况1.1编制依据1.1.1、《丹江口港陈家港港区物流园码头工程施工图设计》。1.1.2、采用的标准、规范、图集:1)、《港口工程荷载规范》2)、《港口工程质量验收检测评定标准》3)、GBJ301-88《建筑工程质量检验统一标准》4)、《港口工程地基规范》5)、GB50202-2002《建筑地基基础施工质量验收规范》6)、GBJ201-83《土方与爆破工程施工及验收规范》7)、《城镇道路工程施工与质量验收规范》1.1.3、《丹江口港陈家港港区物流园码头工程地质勘查报告》。1.1.4、本单位拥有的科技成果、管理水平、技术设备力量,多年积累的港口码头、民用建筑施工经验及对施工现场及周围环境的调查所掌握有关资料。1.1.5、丹江口港陈家港港区物流园码头工程招投标文件及答疑。1.1.6、丹江口港陈家港港区物流园码头工程施工合同及附件。1.1.7、国家基本建设方针、政策、法令。1.1.8、国家现行其它相关规范、强制性标准、四新技术、防火、防爆、环境保护及职业健康标准。1.2工程概况丹江口港陈家港港区物流园码头工程位于汉江中游左岸、丹江口市内付家寨河段,紧邻丹江口城区南部,朔江而上7km可达丹江口大坝,顺江而下642km可抵达武汉市汇入长江。新建500T级杂货泊位和散货泊位各一个(水工结构兼靠1000t级),年设计吞吐量55万t,其中杂货15万t,散货40万t。陆域纵深198.3~236.8m,陆域宽度175.0m。港区占地总面积3.9万㎡。陆域按照生产作业区、办公区和辅助生产区分区布置。码头前沿线距离后方江堤约60m,2个泊位总长175m。码头前沿线根据水流方向和水下地形条件顺岸式布置,杂货3泊位布置在上游侧,散货泊位布置在下游侧。杂货库场作业区布置在上游侧,对应杂货泊位后方,共布置了一个杂货堆场和一个杂货仓库。散货堆场布置在下游侧,对应散货泊位后方,布置了一个散货进口堆场。港区西北侧场地上布置了综合办公楼(待规划)、食堂、职工活动中心,港区东南侧场地上布置了候工房、工具库、机修间、蓄水池等生产辅助建筑物。港区道路呈网状布置,主干道宽度均为12m,次干道宽度为9m。港区大门设置在港区后方西北角,通过疏港公路与302省道连通。杂货堆场采用轮胎起重机完成货物堆取作业,仓库配备叉车。散货水平运输采用带式输送机系统,堆料作业采用高架双臂堆料机,取料作业采用单斗装载机。道路、堆场概况道路铺砌总面积11960.28㎡,道路宽9m、12m,采用现浇沥青砼结构。路面上面层采用40㎜厚AC-13C细粒式沥青混凝土,采用A级70号道路石油沥青;下面层采用80㎜厚AC-16C细粒式沥青混凝土,采用A级70号道路石油沥青;路面基层为200㎜厚的6%水泥稳定碎石层,下基层为200㎜厚的3%水泥稳定碎石层。杂散货堆场铺砌面积为7184㎡,结构从上向下为C50高强砼连锁块10㎝,粗砂垫层5㎝,6%水泥稳定碎石垫层20㎝,碎石垫层25㎝。其它铺砌面积4164㎡,结构同上。散货堆场双臂堆料机栈桥宽度4m,排架间距12m,基础采用2根ф800㎜钻孔灌注桩,现浇C30钢筋砼承台,600㎜×600㎜现浇C30钢筋砼方型立柱,400㎜×400㎜现浇C30钢筋砼方型系梁,上部结构采用钢引桥。主要技术指标如下表:系号项目名称单位工程数量表备注1泊位长度m1752占用陆域岸线长度m1753陆域纵深m198.3~236.84陆域占地面积㎡390025拆迁面积㎡10106散货堆场面积㎡42487杂货堆场面积㎡23758杂货仓库面积㎡20169辅助生产建筑面积㎡234810港内道路面积㎡1256011其他铺砌面积㎡1243512绿化面积㎡302041.3场平土方工程概况本码头工程陆域纵深198.3~236.8m,占用陆域岸线长度175m,占地面积38071.25㎡,场地现地面标高90.5m。场地南半部较平整,有稀疏的杂草分布;北面场地坑洼不平,建筑垃圾较多,零星分散堆放,杂草全场分布,且较茂盛。北面场地小块菜地较多,有大小二十块,分散分布。北面场地另有四个大坑,一个位于北面围墙边上,体积约为621.6m³(长×宽×高=21m×18.5m×1.6m),一个位于北面场地西面围墙边,体积约为900m³(长×宽×高=30m×15m×2m),另两个分别位于北面场地中部,体积约为900m³(长×宽×高=20m×15m×3m)和75m³(长×宽×高=10m×5m×1.5m)。另外,北面场地分布大小不等菜地约45块,面积约1850㎡,占北面场地约10%;电线杆7根;待拆房子一间,占地面积约54㎡(长×宽=8.3m×6.4m)。现场地以前存在三个大鱼塘,鱼塘占整个场地2/3,在2014年5月份进行了回填作业,将三个大鱼塘全部填平,并且全场地整体回填1.5m厚。但目前场地标高约90.5m,完成面91.5m,相差约1m,扣除路面、堆场结构层,需要回填厚度为50㎝,需要回填土方量约25130.6m³(加上四个大坑共2496.6m³)。场平土方回填范围为整个红线内范围,临建办公区场平后回填土方完成面标高91.5m,砂石堆场、钢结构堆场场平后回填土方完成面标高90.9m,其余部位回填后土方完成面标高为91m。整个场地表层基土较酥松,特别是北面场地基土很酥松,经过场地平整后,需要压路机进行辗压密实,然后才能进行回填土作业。1.4自然条件1.4.1地形、地貌、地质条件拟建码头工程场地陆域地形较平坦,地貌单元属河流地貌,港区位于汉江高漫摊上,场地岩土主要由第四系冲积物组成,场地平坦,场地西侧为预制块堆场,东侧有池塘分布,北侧为丹奥医药化工,西南侧领汉江,港区陆域天然地面高程在89.1m~90.83m之间。该工程为一般工程,由岩土工程问题造成破坏的后果不严重,判定工程重要5性等级为二级;建设场地经山地、冲沟地段改造平整而成,地形地貌复杂,地址环境受到一定程度破坏,为中等复杂场地;场区内岩土种类单一,性质变化不大,为简单地基。场地层位相对稳定,力学强度由上而下逐渐增大,承载力逐渐提高,横向上各层层位变化小。场地无液化沙土,无滑坡、崩塌、震陷等不良地质现象和作用,场地无埋藏的河道、沟滨、坟墓、防空洞及孤石,场地无不良地质作用,场地内无全新活动断裂带建筑抗震地段为一般地段,场地稳定性为基本稳定,工程建设适宜性为较适宜。1.4.2地下水拟建场区紧临汉江,场地地下水主要为储存于素填土层、细砂层级卵石层中的孔隙潜水。地下水与汉江水联系密切,相互补给,富水性较好。场地附近无污染源,场地水、土对混凝土结构具微腐蚀性,对钢筋混凝土结构中的钢筋具微腐蚀性。本场地无承压水分布。1.4.3水文、气象丹江口市属亚热带半湿润季风气候区,由于秦岭山脉的屏障作用,加之丹江口水库的水全效益及垂直地貌的影响,构成了丹江口市优越的山区区域性小气候,基本是“四季分明、光照充足、热量丰富、雨热同季、无霜期长、相对湿度大”。多年平均气温15.8℃,多年平均最高与最低气温分别29.2℃、-0.9℃,极端最高与最低气温分别为41.5℃、-12.4℃。多年平均降水量817.3㎜,历年日最大降水量179.6㎜,历年最大降水日113d,丹江口市降水主要集中在7-9月份,三个月的降水量约占全年觉得63%。多年平均风速2.3m/s,冬季主风向东北风,夏季主风向东南风。港口汉江水域无冰冻史,常年通航。拟建码头上游约1200m设有黄家港水文站,根据该水文站的水位资料进行特征值统计为:历年最高水位94.43m,历年最低水位84.81m,多年平均水位86.59m。然后进过一系列计算得到码头区域的设计高水位90.44m,设计低水位85.58m。由图纸知,施工水位为86.38m,设计河底高程为83.30m。根据现场踏勘情况,初步6估计平均水深为4m。1.4.4交通项目所在场地西北角目前有一条宽4m、长300m便道与樊丹线相通。项目场地东南角处沿汉江下游河堤上也有一条宽4m、长度大约700m土便道与樊丹线相通。1.4.5水、电、通讯施工期间办公区用水及施工用水采用自来水,养护用水与冲洗用水采用汉江抽取水。施工临时用水由业主提供接驳点。根据负荷等级、用电负荷容量及当地电网条件,本工程采用一台10KV专线供电,供电电源由附近的110KV的区域变电站接引。通讯采用手机与座机联系,很方便。1.4.6土方料码头紧邻丹江口城区,所需土源地距离场地10km以内,价格适中,可以满足工程建设需要。第二章施工部署2.1施工组织机构我公司组建项目经理部,按项目法组