京港澳高速公路漯河至驻马店段改扩建工程“96区”路床6%灰土填筑试验段施工方案中铁七局集团有限公司漯驻高速改扩建工程TJ-4合同段项目经理部二〇一四年三月十五日中铁七局集团有限公司漯驻高速改扩建工程TJ-4标“96”区路床6%灰土填筑试验段施工方案目录一、编制依据及原则.................................................................11、编制依据..........................................................................................12、编制原则..........................................................................................1二、编制范围............................................................................1三、试验段目的......................................................................21、试验段目的.....................................................................................22、试验段概况.....................................................................................2四、施工准备..........................................................................31.技术准备..........................................................................................32.人员、机械准备............................................................................32、测量及试验检测仪器...................................................................53.填筑材料试验情况.......................................................................5五、试验段施工工艺及主要控制要点.....................................51.施工流程..........................................................................................52.施工准备..........................................................................................63.填筑前检测.....................................................................................64.测量放样..........................................................................................75.布设卸料方格网............................................................................76.土料的取土、运输、摊铺.........................................................87.白灰布料、拌合办法...................................................................98.整形、碾压.....................................................................................99.稳压、收面...................................................................................1010.数据采集、整理.......................................................................1011.施工注意事项............................................................................11六、工期安排..........................................................................111.工期计划............................................................................................112、确保工期的措施..........................................................................11中铁七局集团有限公司漯驻高速改扩建工程TJ-4标“96”区路床6%灰土填筑试验段施工方案七、雨季施工安排及准备措施................................................14八、质量保证体系..................................................................161、部门职责........................................................................................162、工程质量保证措施.....................................................................18九、自检体系..........................................................................201、人员分工职责...............................................................................202、自检流程及方法..........................................................................21十、安全保通措施..................................................................21十一、环境保护措施...............................................................22十二、文明施工保证措施........................................................22十三、附图.............................................................................23中铁七局集团有限公司漯驻高速改扩建工程TJ-4标“96”区路床6%灰土填筑试验段施工方案1一、编制依据及原则1、编制依据漯驻高速公路TJ-4标两阶段施工图设计“关于明确路基工程有关施工方案的通知”;《公路路基施工技术规范》JTGF10—2006《公路工程质量检验评定标准》JTGF80/1—2004《公路工程施工安全技术规范》JTJ076—95《公路土工试验规程》JTGE40-20072、编制原则(1).严格遵照业主对漯驻高速TJ-4标项目施工的质量、工期控制的原则要求,结合工程实际进行编制。(2).严格遵守各有关设计图纸、设计规范、施工规范、安全规程和质量评定与验收标准。(3).严格遵守招标文件各项条款要求,认真贯彻业主和监理工程师及其授权人或代表的指示、指令和要求。(4).遵循“安全第一”的原则,严格遵照、遵守国家、河南省和当地政府关于施工安全、工地治安人员安全、劳动保护、土地使用与管理及环境保护等方面的具体规定和技术标准。二、编制范围根据本标段实际情况,“96”区路床6%灰土填筑施工选定具有代表性路段K36+565.33~K36+896.84段右幅作为试验段路段,依据施中铁七局集团有限公司漯驻高速改扩建工程TJ-4标“96”区路床6%灰土填筑试验段施工方案2工技术方案正确指导施工,及时总结出各项最佳合理路基填筑数据。通过本试验段施工选出最佳方案指导本标段96区路床6%灰土填筑施工。三、试验段目的1、试验段目的根据本地区填料资源情况采用不同的施工工艺做试验,从中选出路基施工的最佳工艺来指导全线施工。试验时记录好压实设备的类型、最佳机械组合方式、碾压遍数及碾压速度、工序、填筑材料的松铺厚度、材料含水量等。试验段完成后及时整理形成书面材料,试验段成果报监理工程师审批,作为本标段96区路床6%灰土填筑施工的依据。2、试验段概况该段路基属于平原地区,以淮河泛流所形成冲、湖积土为主,地下水位偏高,已对路基基层进行山渣石填筑、碎石垫层(93区素土填筑、94区3%灰土填筑)等处理,地表情况基本代表本地区路基填方施工的特点。该段路基处于右线,设计基本情况为:路基每侧加宽7m,横坡为2.00%。根据设计图纸,0≤路面底面下路基填高(m)≤1.5m的填方路段路床处理厚度80cm,上下路床均采用6%石灰土处治;上路堤70cm采用3%石灰土处治,93区采用素土、山渣石、碎石填筑。待96区试验段施工完成及得出试验成果后方可进行其他段落96区6%灰土施工,工艺与试验段工艺相同。中铁七局集团有限公司漯驻高速改扩建工程TJ-4标“96”区路床6%灰土填筑试验段施工方案3四、施工准备1.技术准备(1)编制科学合理的施工方案通过深入施工现场调查,结合实际情况,编制施工技术、工艺方案,并对施工机械和工程技术及施工人员进行了合理的组织和安排,给施工和技术人员都作了施工技术交底。(2)组织学习了漯驻高速TJ-4标段施工图设计文件、“关于明确路基工程有关施工方案的通知”以及《公路路基施工技术规范》等,确保详细完全领会设计意图及规范要求,熟记规范要求的质量标准。2.人员、机械准备根据试验段工程量大小及其重要性,项目部选取有经验的人员成立路基填筑试验段施工小组,工地试验室与工程部相互配合进行试验中铁七局集团有限公司漯驻高速改扩建工程TJ-4标“96”区路床6%灰土填筑试验段施工方案4段的施工,以保证试验段最终成果真实有效,主要小组成员如下:组长:刘鹏涛(项目经理)副组长:王占峰(总工程师)、随灿(生产副经理)、魏景利(试验室主任)、邢培琦(技术负责人)组员:柳强、李永胜(试验人员)、谢红杰、孔祥千(技术人员)、高鹏(测量人员)、田明强(质量负责人)、周强军(专职安全员)项目部选取施工经验丰富的机械操作人员组成施工小组,人员配备数量如下:挖掘机司机:2名装载机司机:2名推土机司机:2名平地机司机:2名压路机司机: