公明污水处理厂安装部分施工组织设计

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

深圳市公明污水处理厂目录第一章编制说明及工程概况.......................................................................1第一节工程基本情况.................................................................................................1第二节工程设计概况.................................................................................................1第三节施工技术标准、规范.....................................................................................21.企业标准、规定22.施工安全技术标准33.质量检验评定标准34.施工技术规范、标准4第二章施工组织部署...................................................................................5第一节项目施工说明.................................................................................................51.文明施工目标52.安全目标53.质量目标54.工期目标5第二节项目施工组织部署.........................................................................................6第三节施工管理体系.................................................................................................61.政工保卫组62.后勤供应组63.预算成本组74.质安监督组75.工艺施工组7第三章工期主总进度安排...........................................................................8第一节安装进度计划.................................................................................................8第二节开工竣工日期及施工总工期.........................................................................8第三节进度保证措施.................................................................................................8第四章施工程序及主要施工方法.............................................................10第一节设备安装工程...............................................................................................10深圳市公明污水处理厂1.泥处理工段102.生物反应池错误!未定义书签。3.预处理工段14第二节强电安装工程...............................................................................................221.施工要点及措施222.施工程序及主要方法253.工程设计概况25第三节弱电安装工程...............................................................................................261.污水处理厂自控系统调试方案262.水处理厂自控系统设计概况错误!未定义书签。第四节管道安装工程...............................................................................................301.主要施工技术方案30第五节施工配合.......................................................................................................351.施工配合中的半成品保护352.安装单位各专业的相互协调与配合363.安装单位与监理公司的配合364.安装单位与土建单位的配合365.安装单位与建设单位的配合37第五章主要资源投入计划.........................................................................38第一节劳动力供应计划...........................................................................................381.劳动力的组织及现场管理382.用工计划38第二节材料及施工机具供应计划...........................................................................38第六章技术保证措施.................................................................................40第七章质量保证措施.................................................................................41第一节质量目标.......................................................................................................41深圳市公明污水处理厂第二节质量保证体系...............................................................................................41第三节质量措施.......................................................................................................41第四节安装工程质量通病及预防措施...................................................................421.管道安装质量通病及预防措施422.电气安装质量通病及预防措施453.设备安装质量通病及预防措施47第八章成品保护措施.................................................................................54第九章安全文明施工.................................................................................55第一节安全文明施工目标.......................................................................................55第二节安全文明施工措施.......................................................................................551.安全文明施工工作要点552.安全文明施工管理措施553.安全文明施工的组织领导56第十章降低成本措施.................................................................................57深圳市公明污水处理厂第一章编制说明及工程概况本施工组织设计是根据首创爱华(天津)市政环境工程有限公司编制《公明污水处理厂工程施工邀标文书》及上海市政工程设计研究总院设计的工程施工图纸,在对工程现场初步察勘基础上,结合有关技术规范、标准和我公司在以往同类工程施工中的经验和作法编制而成,作为投标技术文件提供给建设单位。本施工组织设计的编制包括深圳公明污水处理厂的施工组织部署,工期进度安排,主要资源投入计划,技术、质量、安全保证措施,工艺管道安装、设备安装、电气安装、弱电安装及调试工程的施工程序、主要方法。第一节工程基本情况深圳公明污水处理厂厂址位于光明新区公明办事处玉律社区,南光快速路交叉口西南侧、长流陂水库东侧山坳。该地块处于两山环抱的区域,地势比较平坦。现状为农田和鱼塘,动拆迁量小,地面标高为25~30m。深圳市公明污水处理厂工程近期设计规模为10万3/d,远期为20万m3/d,工艺流程采用多模式AAO工艺,出水质量执行一级A标准。设计单位:上海市政工程设计研究总院施工单位:中铁四局工程地址:深圳市宝安区第二节工程设计概况工艺流程工程规模较大,所采用的工艺必须是成熟、可靠的、同时也要考虑工艺的先进性、运行的稳定性。调整的多样性和出水的安全性,为了满足进水水质的变化和雨季合流污水量的冲击。采用多模式A2/O污水处理工艺该工艺具有水质水量变化及负荷冲击适应性强处理效果稳定可靠,运行模式灵活等优点。通过污水和混合液进深圳市公明污水处理厂水的合理布点,可以合理选择污水进水点和混合液回流点,实现不同运行工况。通过调整实现不同运行工况,充分发挥各种处理工艺的特点,对污水进行有针对性的处理。该污水处理工艺流程第三节施工技术标准、规范针对工程施工内容,该工程安装施工主应遵守施工图设计所选用的和以下技术标准、规范:1.企业标准、规定《工程施工档案资料收集整理规定》《施工现场准备管理标准》《文明施工现场管理标准》《施工现场材料管理标准》《施工现场机械设备管理标准》《施工现场安全管理标准》《施工现场进度管理标准》《施工现场质量管理标准》《施工现场经济核算管理标准》《施工现场思想政治工作及民主管理标准》深圳市公明污水处理厂《安装工程质量控制上点》《安装工程施工程序标准》《建筑安装工程施工工艺及操作规程》《工程质量管理点管理标准》《焊接工程工艺标准》《防雷接地工程工艺标准》2.施工安全技术标准JGJ46-88《施工现场临时用电安全技术规程》JGJ33-86《建筑机械使用安全技术规程》JGJ80-91《建筑施工高处作业安全技术规范》GB50194-93《建筑工程施工现场安全用电规范》JGJ59-88《建筑施工安全检查评分标准》原国家建筑工程总局《建筑安装工人安全技术操作规程》3.质量检验评定标准GBJ300-88《建筑安装工程质量检验评定统一标准》GBJ301-88《建筑工程质量检验评定标准》GBJ50184-93《工业金属管理工程质量检验评定标准》GBJ303-88《建筑电气安装工程质量检验评定标准》GBJ131-90《自动化仪表安装工程质量评定标准》GB50150-91《电气装置安装工程电气设备交按试验标准》GB50221-95《钢结构工程质量检验评定标准》GB50252-94《工业安装工程质量评定标准》深圳市公明污水处

1 / 60
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功