冲孔桩施工方案

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

1目录1.工程概况························31.1工程概况·······················31.2编制依据·······················31.3冲孔桩的施工说明····················41.4本工程要点······················72.施工平面布置及施工用电、用水计划············82.1施工总平面布置····················82.2临时设施的布置····················82.3施工用水、用电计划···················83.项目管理机构及劳动力组织················83.1项目管理机构·····················83.2劳动力配置计划····················93.3拟投入本工程主要施工设备················104.施工进度计划及工期保证措施··············104.1施工进度计划·····················104.2工期保证措施·····················115.施工方案及施工方法···················125.1施工准备·······················125.2施工方法·······················145.3常见事故及处理措施··················215.4泥浆处理及渣土外运··················2625.5冲孔灌注桩质量控制···················265.6工程质量检查验收····················286.质量保证体系及保证措施·················296.1质量保证体系·····················296.2质量保证措施·····················317.安全生产、文明施工保证措施···············327.1安全生产保证体系及保证措施··············327.2文明施工与环境保护措施················3531.工程概况1.1工程概况占地119658m2,建筑面积约2.82万m2,包括1层连体地下室,1栋5层商业综合楼。总高度为28.8米。首层布置商场、西式快餐、派出所和街道办等;二层布置超市、派出所和街道办等;三层主要布置超市;四层主要布置康体活动项目以及配套服务;地下室为汽车库及附属设备用房等。基础桩均为冲孔灌注桩,桩身混凝土等级为C35,其中800mm桩37根,1000mm桩径49根,1400mm桩径38根。1.2编制依据国家、省市相关标准、规范、规程1、本工程设计图纸2、《工程测量规范》(GB50026-93)3、《工程测量基本术语标准》(GB/T50228—96)4、《土工试验方法标准》(GB/50123—1999)5、《建筑地基基础设计规范》(GB50007—2002)6、《建筑抗震设计规范》(GB50011—2001)7、《混凝土结构工程施工及验收规范》(GB50204-92)8、《建筑桩基技术规范》(JGJ94-94)9、《广东省建筑地基基础施工及验收规程》(DBJ15-201-91)10、《建筑地基处理技术规范》(JGJ79-91)11、《建筑工程质量检验评定标准》(GBJ301-88)12、《建筑地基基础工程施工质量验收规范》(GB50202-2002)13、《建设工程监理规范》(GB50319-2000)414、与本工程施工与验收有关的规程、规范和标准。1.3冲孔桩的施工说明根据中国有色金属工业长沙勘察设计研究院提供的钻探报告结果,拟建场地分布有人工填土层、第四系海陆交互相沉积层、第四系冲积层和残积层,下伏基岩为白垩系上统泥质粉砂岩,局部为粗砂岩及薄层砾岩。其野外特征按自上而下的顺序描述如下:1、人工填土层(Qml)人工填土①(①为地层编号,下同):主要为第四系全新统人工填筑的杂填土及素填土组成。素填土①1:呈灰褐、褐黄色,主要由粘性土混少量砼块、砖块组成,含少量植物根系,结构松散。该层共有20个钻孔见到,层厚0.70~3.00m,平均厚度2.17m。杂填土①2:呈灰褐色,多呈松散状,部分稍压实,主要由粘性土夹碎石、砼块、碎砖等建筑垃圾混合而成。该层共有136个钻孔见到,层厚1.20~4.50m,平均厚度2.29m。2、第四系海陆交互相沉积层(Qmc)淤泥②:灰黑,深灰色,呈饱和,流塑状态,局部呈软塑状态,底部一般含细砂10-20%,略具臭味。该层广泛分布于场地,层厚0.60~7.50m,平均厚度1.73m,顶面高程2.26~6.07m,平均4.73m。3、第四系冲积层(Qal)粉质粘土③:灰黄,浅灰色,呈硬塑状态,局部呈可塑状态,质纯或局部含少量中粗砂,摇振无反应,光泽反应稍有光滑,干强度及韧性中等。该层主要分布于场地东侧,该层广泛分布于场地,层厚0.600~6.30m,平均厚度3.59m,顶5面高程-0.08~5.53m,平均3.51m。粗砂④:灰黄色,呈饱和,松散状态为主,局部呈稍密状态,主要成分为石英质,不均匀含10~20%粘性土。该层仅见于钻孔Ⅲ-192,层厚2.20m,平均厚度2.20m,顶面高程1.88m。4、残积土层(Qel)粉质粘土⑤:由泥质粉砂岩风化残积形成,紫红、褐红色,呈硬塑状态,局部可塑。摇振无反应,光泽反应稍有光滑,干强度及韧性中等。该层共仅有34个钻孔遇见。层厚0.60~9.10m,平均厚度2.37m,顶面高程-2.63~3.06m,平均0.37m。5、白垩系上统(K)岩性主要为泥质粉砂岩,少量粗砂岩、砾岩,呈褐红、紫红色,泥质、钙质胶结为主。陆源碎屑结构,厚层状构造。按其风化程度由强到弱的顺序可依次划分为:全风化泥质粉砂岩⑥:呈褐红色,原岩组织结构基本风化破坏,但仍可辨认,岩芯呈土柱状。该层共仅有7个钻孔遇见。层厚1.40~4.10m,平均厚度2.17m,顶面高程-1.28~2.09m,平均0.10m。强风化泥质粉砂岩⑦:呈褐红色,泥质胶结,已风化成半岩半土状,岩石组织结构已大部分破坏,但原岩结构清晰,岩芯呈土柱状、土夹碎块状,局部夹有中风化块,岩块用手可折断,岩石风化节理裂隙极发育,遇水易软化。属极软岩,岩体破碎,基本质量等级为Ⅴ级。该层共有147个钻孔遇见,层厚0.60~13.10m,平均厚度3.27m,顶面高程-18.84~3.95m,平均-2.74m。中风化泥质粉砂岩⑧1:褐红色,泥质胶结为主,少量钙质胶结,岩石组织结构部分破坏,节理裂隙发育,岩芯较破碎,多呈块状、短柱状,锤击声稍脆。室内天然抗压强度<8MPa,属极软岩~软岩,岩体较破碎,岩体基本质量等级为6Ⅴ级。该层共有104个钻孔遇见,揭露层厚0.80~9.70m,平均厚度3.32m,顶面高程-10.17~0.45m,平均-3.66m。中风化泥质粉砂岩⑧2:褐红色,泥质、钙质胶结,岩石组织结构部分破坏,节理裂隙较发育,岩芯较完整,多呈短柱状,锤击声较脆。室内天然抗压强度≥8MPa,属软岩,岩体较完整,岩体基本质量等级为Ⅳ级。该层共有140个钻孔遇见,揭露层厚0.80~11.30m,平均厚度5.28m,顶面高程-20.64~-0.93m,平均-6.88m。微风化泥质粉砂岩⑨(局部夹粗砂岩、细砂岩):褐红色,厚层状构造,钙质、泥质胶结,胶结紧密,陆源碎屑结构,原岩结构基本未风化破坏,局部裂隙稍发育,岩芯较完整,呈长柱状、短柱状,岩石坚硬,锤击声脆。属较软岩,岩体较完整,岩体基本质量等级为Ⅳ级。该层广泛分布于拟建场地,揭露层厚1.80~11.30m,平均厚度5.55m。。根据本次超前钻探结果,该岩中分布不均匀风化现象,各风化层往往呈互层状出现,即强风化泥质粉砂岩⑦、中风化泥质粉砂岩⑧1中往往分布有中风化泥质粉砂岩⑧2及微风化泥质粉砂岩⑨等不均匀风化层,或中风化泥质粉砂岩⑧2及微风化泥质粉砂岩⑨中分布有强风化泥质粉砂岩⑦、中风化泥质粉砂岩⑧1等软弱夹层。水文地质条件:拟建场地地下水静止水位埋深为3.70~4.00米,该场地的地下水无腐蚀性。历年最高水位及近3~5年最高地下水位均接近标高40.00m。冲孔桩的施工说明:7表中括号外的入岩深度为进入中风化泥质粉砂岩○82(室内天然抗压强度≥8MPa)的深度,括号内的入岩深度为进入微风化岩的深度,微风化岩持力层岩样天然湿度单轴抗压强度不低于12MPa。具体以施工图纸及相关规范要求为准。1.4本工程要点东面施工红线范围内场地由于市政道路占用暂时无法使用,而且广州市迎亚运的影响,临建场地比较狭窄,工期比较紧迫,本工程的重点要放在工期保证上,工期目标的实现带来巨大的压力,协调要求高。为保证工期,应对可能影响施工进度的各种因素进行估计,制定相应的预防和处理措施;加强施工管理,确保因管理水平而影响施工进展的事情不发生;制定切实可行的工期保证措施,保质保量,实现工期目标,是本工程的重点。在施工中应根据勘探资料提供的地质情况,采取相应的措施。在浅层填土层中,采用低锤密击且不停抛洒回填粘性土,以击碎填石并填充桩周土层空隙。在冲击过程中,应保持孔内泥浆面的稳定,及时清渣。对填石层厚的桩,在浅部成孔时,可考虑高冲程干冲击成孔,并不停回填黄土,以夯实下部填石,冲至2米时,再用优质泥浆清理孔内石粉并使孔壁形成保护泥皮。待孔内基本不消耗泥浆时,采用低锤密击继续冲击成孔。对地质条件特别差的桩,上部填石层将考虑下钢护筒等进行护壁。由于淤泥质土还未完成其固结作用,在上部填石的冲击成孔过程中,给淤泥质土带来很大的上覆压力,在此层的施工中,应采用低锤疏击的方法成孔,以便使上覆压力均匀载荷,避免淤泥质土层中产生大的塌方和挤压流动,影响周围桩8基施工。在本场地施工中,为避免桩机间相互影响,在施工中相邻桩距小于6米的桩不应同时施工。2.施工平面布置及施工用电、水2.1施工总平面布置施工场地总平面布置涉及到施工时该地区交通、环保、供电、供水及排污等设施的影响,施工前必须与有关部门协调落实,方能确保在本工程施工时,本地区交通和水电等设施正常运转。根据招标文件的有关条款,结合本场区地形、场地条件等实际情况,按以下原则进行施工总体布置:(1)临时设施的布置尽量与工程施工顺序、施工进度相适应,使其不致于因为施工的进展而形成相互矛盾,妨碍永久建筑物的施工。(2)保证交通运输方便,尽量减少各种材料在工地内部的运输距离和转运次数,避免运输线路互相干扰。(3)确保防火安全,满足文明施工要求。(4)有利于生产,便于管理。进场施工前遵照以上原则,按业主指示进行施工总平面布置。2.2临时设施的布置现场临时设施主要有加工场、现场办公室、设备库及仓储、供电、供水、卫生、生活等。见图施工总平面布置:2.3施工用水、用电计划由于本工程桩基础冲孔灌注桩,混凝土采用商品砼,所以生产用水主要为制9备泥浆和钻进过程中的泥浆循环用水。施工用水、用电线路按业主批示从现场接驳,具体见临时用水用电方案。3.项目管理机构及劳动力组织3.1项目管理机构我公司将全力投入本工程的施工,实行项目法施工管理,施工全过程由我公司施工队伍独立承担,并派出最优秀的管理人员负责本工程的施工管理工作。3.2劳动力配置计划为了确保工程质量、安全及施工工期,我公司将组成一支技术过硬、经验丰富的项目班子,投入的人员及分工,见劳动力组织计划表(表2)表2劳动力配置计划表序号人员数量项目副经理:(刘灵宇)技术负责人:(陈冠欣)芳村花园二期施工总承包及总承包管理配合服务第四标段项目部项目经理:(黎兆庆)各施工班组施工质安组蔡迪辉材料设备组何伟东技术资料组李柯联络后勤组黄国崽计划预算组刘智强101电工42焊工43桩机工人804钢筋工人205混凝土工106杂工10合计1283.3拟投入本工程主要施工设备设备配置上要充分考虑本工程工期紧特点,结合本公司以往类似施工经验,计划投入钻(冲)孔桩机20台。另外,配备足够的辅助设备,详见设备配置表(表3)。表3主要设备配置表序号设备名

1 / 38
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功