海口市地下综合管廊试点工程1目录1、编制依据及原则............................................31.1编制依据................................................31.1.1法律、法规、规章......................................31.1.2规范、规程............................................31.1.3其他资料..............................................31.2编制原则................................................32、工程概况..................................................43、设计概况..................................................73.1技术标准................................................73.2材料标准................................................83.3防水材料使用部位........................................84、施工工艺技术..............................................94.1变形缝防水施工..........................................94.1.7浇筑另半幅区块混凝土................................134.1.8变形缝注意事项.......................................134.2施工缝防水............................................144.3.1混凝土结构自防水.....................................144.3.2结构防水层施工.......................................154.3.3高弹橡胶沥青防水涂料施工.............................164.3.4自粘性SBS改性沥青防水卷材施工.......................194.3.5外墙防水保护层施工..................................214.3.6通风口、分配电所、投料口顶板附加防水措施.............234.4季节性应对措施.........................................235、资源配置.................................................246、施工安全保证措施.........................................246.1组织保证措施...........................................246.1.1安全目标...........................................246.1.2安全生产管理体系...................................256.1.3安全生产制度.......................................256.2技术保证措施...........................................256.2.1施工现场安全技术措施................................256.2.2施工现场临时用电安全措施...........................266.3应急预案...............................................26海口市地下综合管廊试点工程26.3.1应急救援机构及其职责................................266.3.2突发事件应急处理流程................................286.3.3应急救援物资、设备..................................296.3.4日常检查和演习......................................316.3.5应急响应与预案管理..................................317.其他技术保证措施..........................................327.1质量保证措施...........................................327.1.1质量目标............................................327.1.3质量保证组织措施....................................347.2工期保证措施...........................................367.2.1工期保证组织措施....................................367.2.2工期保证措施........................................377.3季节性施工保障措施.....................................387.3.1雨期施工措施........................................387.4文明施工及环水保、职业健康措施.........................397.4.1文明施工及环保目标...................................397.4.2环保、水保措施.......................................397.4.3职业健康.............................................407.4.3.1职业健康目标.......................................407.4.3.2职业健康安全管理体系...............................407.4.3.3劳动保护措施.......................................407.5节能减排措施...........................................417.5.1节能减排的要求.......................................417.5.2现场节能减排措施.....................................418.首件结构防水施工总结.....................................428.1背贴式止水带整改措施...................................428.2中埋式钢边止水带整改措施...............................428.3施工缝防水整改措施.....................................428.4自粘性SBS改性沥青防水卷材整改措施......................429.雨期施工保护措施..........................................42海口市地下综合管廊试点工程3地下综合管廊防水工程施工总结1、编制依据及原则1.1编制依据1.1.1法律、法规、规章⑴《中华人民共和国建筑法》法律(2011)20号;⑵《中华人民共和国安全生产法》(2014年修订);⑶《建设工程安全生产管理条例》国务院令第393号;1.1.2规范、规程《地下工程防水技术规范》(GB50108-2008);《地下防水工程质量验收规范》(GB50208-2011);《城市综合管廊工程技术规范》(GB50838-2015);《混凝土结构工程施工规范》(GB50666-2011);《建筑机械使用安全技术规程》(JGJ/T33-2001);《施工现场临时用电安全技术规范》(JGJ46-2005);《建筑施工安全检查标准》(JGJ59-2011);《建设工程文明施工标准》(DBJ07-2006)。1.1.3其他资料⑴本工程施工合同文件;⑵海口市地下综合管廊施工组织设计;⑶海口市地下综合管廊施工图;⑷长滨路等六条综合管廊施工图—结构工程,上海市政工程设计研究总院(集团)有限公司,2015年11月;⑸本企业同类工程施工经验和技术资料。1.2编制原则⑴严格遵守合同文件所规定的工程施工工期,合同条款以及合同文件的各项要求,根据工程的特点和轻重缓急,分期分批组织施工,在工期安排上尽可能提前完成;⑵坚持在实事求是的基础上,力求技术先进、科学合理、经济适用的原则。在确保工程质量标准的前提下,积极采用新技术、新工艺、新机具、新材料、新测试方法;⑶合理安排施工的程序和顺序,做到布局合理,突出重点,全面展开,平行流水作业、正确选用施工方法,科学组织,均衡生产。各工序紧密衔接,避免不必要的重复工海口市地下综合管廊试点工程4作,以保证施工连续均衡有序进行;⑷施工进度安排注意各分项工程间的协调和配合,并充分考虑气候、季节对施工的影响;⑸结合现场实际情况,因时因地制宜,尽量利用原有设施或就近已有的设施,减少各种临时工程,尽量利用当地合格资源,合理安排运输装卸与储存作业,减少物资运输周转工作量;⑹坚持自始至终对施工现场全过程严密监控,以科学的方法实行动态管理,并按动静结合的原则,精心进行施工场地规划布置,节约施工临时用地,少占农田,不破坏植被。做好水土保持工作,防止大气污染、水污染。严格组织、精心管理,文明施工,创标准化施工现场;⑺严格执行国家颁发现行的和合同文件明确的设计规范、施工规范及验收标准。2、工程概况本工程为海口市地下综合管廊试点工程,包含长滨路、海涛西路、长秀大道、长滨十七街、海秀路及天翔路6条地下综合管廊,总长11.1Km。管廊为钢筋混凝土结构,采用明挖法施工。管廊标准断面顶板覆土2.5m,标准断面埋深约6~7m。海口市地下综合管廊试点工程5长滨路综合管廊本次设计范围为长滨十七街~长流三号路,长约2.28Km,布置在道路中央绿化带内,管廊局部布置在道路机动车道下部。管廊为三舱断面,容纳给水管、110KV电力、10KV电力、通信管和燃气管、军用管。海涛西路综合管廊本次设计范围为长滨十七街~长滨西八街,长约1.77Km,布置在海涛西路东侧绿化带内。管廊为单舱断面,容纳给水管、10KV电力、通信管和军用管、中水管。海口市地下综合管廊试点工程6秀大道综合管廊本次设计范围为海涛西路~长滨路,长约2.38Km,布置在长秀大道北侧绿化带内。管廊为单舱断面,容纳给水管、10KV电力、通信管和军用管、中水管。长滨十七街综合管廊本次设计范围为海涛西路~长滨路,长约2.10Km,布置在长滨十七街北侧绿化带内。管廊为双舱断面,容纳给水管、10KV电力、通信管和燃气管、军用管、中水管。海秀路综合管廊本次设计范围为长滨路~长彤路,长约1.73Km,布置在海秀路北侧绿化带内。管廊为双舱断面,容纳给水管、10KV电力、110KV电力、220KV电力、通信管和军用管、中水管。海口市地下综合管廊试点工程7天翔路综合管廊本次设计范围为新海中路~滨海大道,长约845.7m,布置在天翔路北侧绿化带内。管廊为双舱断面,容纳给水管、10KV电力、通信