五施工组织设计目录五施工组织设计..........................................................1目录....................................................................1第一章工程概况..........................................................31.1项目概况.........................................................31.2标段内容.........................................................31.3质量要求.........................................................3第二章施工组织机构及人员配备............................................41.2.1施工组织机构...................................................41.2.2人员配备.......................................................5第三章总体施工组织布置及规划............................................63.1施工总体程序.....................................................63.2施工总平面布置...................................................73.3施工进度计划....................................................103.4施工资源配备计划................................................113.5施工信息化管理..................................................16第四章主要工程项目施工方案、方法及技术措施.............................174.1施工方案综述....................................................174.2路基工程施工....................................................184.3桥涵工程施工....................................................244.4隧道工程施工....................................................254.5路面工程施工....................................................294.6重点(难点)工程施工............................................33第五章工期保证体系及保证措施...........................................415.1工期保证组织机构................................................415.2工期保证措施....................................................41第六章工程质量管理体系及保证措施.......................................436.1质量规划........................................................436.2质量管理体系....................................................436.3质量保证措施....................................................49第七章安全生产管理体系及保证措施.......................................517.1安全保证体系....................................................517.2安全保障检查程序................................................517.3安全保障措施...................................................52第八章环境保护、水土保持保证体系及保证措施.............................538.1环保领导小组....................................................538.2环境保护及水土保持控制措施......................................53第九章文明施工、文物保护保证体系及保证措施.............................559.1文明施工、文物保护目标..........................................559.2保证体系........................................................559.3保证措施........................................................56第十章项目风险预测与防范、事故应急预案.................................5810.1项目风险预测与防范.............................................5810.2事故应急预案...................................................59第十一章其他应说明的事项...............................................62附表....................................................................63附表1:项目组织机构................................................63附表2:施工总体计划表..............................................64附表3:分项工程进度率计划(斜率图).................................65附表4:工程管理曲线................................................66附表5:分项工程生产率和施工周期表..................................67附表6:施工总平面图................................................68附表7:劳动力计划表................................................69附表八:临时占地计划表.............................................70附表九:外供电力需求计划表.........................................71附表十:施工网络图.............................................72第一章工程概况1.1项目概况宜都至来凤高速公路是省政府批准发布的“七纵五横三环”高速公路规划网中“横五”的组成路段,是湖北省高速公路网规划中重要的东西向通道。湖北宜都至来凤高速公路鹤峰(容美)至宣恩(当阳坪)段工程起于鹤峰县太平镇龙潭坪村,与湖北宜都至来凤高速公路鹤峰东段对接,止于恩施宣恩县当阳坪长湾,设当阳坪枢纽互通与恩施至来凤高速公路相接。项目路线全长55.628km,桥梁总长14004.75m/45座(其中大桥13305.5m/37座,中桥622.25m/7座、分离式立交桥77m/1座),隧道总长18813m/18座(其中特长隧道8914m/2座,长隧道4518.5m/4座,中隧道4115.3m/6座,短隧道1265.2m/6座)。项目主线采用四车道高速公路标准建设,设计速度80km/h,路基宽度24.5m。另建沙道沟连接线1.052公里。1.2标段内容标段划分、工程内容、工期XHTJ-4K52+740~K72+67019.93桥梁4705m/16座,隧道1511.5m/3座,互通1处,鹤峰西互通,服务区1处,太平服务区计划工期:36个月其中:路基工程18个月内完成,隧道工程30个月完成,其他桥梁24个月内完成,路面工程12个月完成(路面具体开工日期以监理人通知为准)。1.3质量要求交工验收的质量评定:合格;竣工验收的质量评定:优良。第二章施工组织机构及人员配备2.1施工组织机构2.1.1施工组织机构框图组织机构框图2.1.2业务部门及施工队伍的构成业务部门及施工队伍的构成序号名称承担的主要施工任务施工人数1管理人员包括项目班子、各个管理部门的负责人、经营管理人员、技术、质检、试验、测量等人员。56项目经理项目副经理项目总工财务部工程技术部工程管理部质量安全部物资设备部计划合同部路基施工队路面施工队边坡防护施工队隧道工程施工队基础处理施工队桥梁施工队综合施工队预制构件加工厂沥青混凝土拌和站砼、稳定土拌和站机械修配厂综合办公室测量队工地实验室2路基施工队承担本工程临时道路修建、永久开挖、填筑、桥涵台背填筑等施工任务。1003路面施工队承担本工程路面基层、路肩培土等施工任务。1004边坡防护施工队承担本工程开挖、填筑边坡的支护、绿化等施工任务。1005隧道工程施工队承担本工程隧道工程开挖支护及混凝土衬砌等施工任务。1506基础处理施工队承担本工程桥涵的桩基、地基处理等施工任务。1007桥梁施工队承担本项目桥梁墩柱、边墩及盖梁、预制梁架设、桥梁连续施工、铺装层及桥面系和现浇桥梁上部结构等施工任务。2008沥青混凝土拌和站承担本工程沥青混凝土拌制任务。309综合施工队承担本工程用水、用电、用风的供应及设备管理、维护以及施工道路的保养、施工环境保护等施工任务。4010预制构件加工厂主要承担本工程T梁及其他小型构件的预制加工、以及钢筋、模板的加工等任务。4011砼、稳定土拌和站主要承担本工程预制构件、现浇结构的砼拌和,基层稳定土的拌制等施工任务。5012机械修配厂承担本工程主要施工机械设备的检查、维修等任务。152.2人员配备一旦业主通知我公司中标,组织道路、桥梁等专业队伍,用专车送至工地现场,以便尽快进入大干状态,确保工期节点目标的实现。人员配备详见附表七“劳动力计划表”。第三章总体施工组织布置及规划3.1施工总体程序3.1.1总体施工顺序安排基本原则根据本标段段工程的特点,为了保证重点、确保工期,实现连续和均衡施工,拟优先安排施工工程量大、结构复杂、工期长的路基、桥梁和隧道施工。总体施工顺序安排遵循先重点,后一般;先主体,后附属的基本原则。3.1.2各分项工程的施工顺序(1)路基工程:进场后首先进行施工便道施工,路基开工前先安排改线、改沟等前期施工。路基施工时优先安排填挖平衡段施工,减少因隧道开挖弃碴量供应的矛盾。挖方采取纵向分段,横向分层,自上而下开挖;填方采取先进行基底处理,后分段从下而上逐层平铺填筑,最后刷坡修整成型