梁板首件制施工方案(修改版)

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

安徽省徐州至明光高速公路路基工程首件预制梁板施工方案重庆市涪陵路桥工程有限公司徐明高速公路XMLJ-02标项目部二○一一年八月十二日1目录一、编制依据······················································································1二、工程概述······················································································1三、施工准备······················································································2四、施工计划······················································································4五、施工方案······················································································5六、施工技术交底···············································································11七、质量保证措施···············································································24八、安全保证措施···············································································29九、环境保护保证措施·········································································32十、夜间施工的保证措施······································································321首件预制梁板施工方案一、编制依据1、《徐州至明光高速公路安徽段两阶段施工图设计文件》;2、公路桥涵施工技术规范(JTJ041-2000);3、《公路工程质量检验评定标准》(JTGF80/1-2004);4、俆明高速公路XMLJ-02标实施性总体施工组织设计;5、我单位在类似工程中的施工经验和相关工程的技术总结、工法成果等。二、工程概述1、工程概况本标段内,预制梁板共有四种,其中13m空心板220片、16m空心板120片、20m矮T梁108片、25m小箱梁48片,共计预制梁板496片,个各桥梁具体分布详见下表。序号桩号桥梁类别上部结构形式预制梁板(片)备注⑴K17+948分离立交2×13m空心板40交角-10°⑵K22+953分离立交3×13m空心板60交角0°⑶K28+900无名沟中桥3×13m空心板60交角40°⑷K24+231分离立交3×13m空心板60交角0°⑸K17+180项土沟中桥3×16m空心板60交角0°⑹K18+833分离立交3×16m空心板60交角40°⑺K24+825闸河中桥3×20m矮T梁54交角40°⑻K26+906分离立交3×20m矮T梁54交角0°⑼K29+590老濉河大桥6×25m小箱梁48交角-40°2、首件范围根据我合同段桥梁下部施工实际进度情况,分别以K26+906分离立交20m矮T梁(左1-2)和K28+900无名沟中桥13m空心板(左3-2)施工作为首件。一片梁板的材料用量如下:梁板类型C50砼(m3)钢筋(kg)钢绞线锚具(套)波纹管(m)Φ25Φ22Φ16Φ12φ10φ8ΦS15.215-315-9φ56φ8020mT梁中梁9.59629.5237.51749.1836.7279.6415.7m439.3513m空心板中梁6.366505.6522284183m849.43、首件工程目的(1)首件工程的实施,便于我部总结经验,加强管理,为规范化施工创造条件;(2)可预见施工中遇到的各种问题,特别是解决可能影响工程质量的各种因素,对出现的问题及时处理,避免施工后期造成返工;2(3)检验和熟练各工序、各种作业人员、机械等斜街与配合;(4)可以评价材料、人员、设备、工艺、环保对工程质量的影响程度。三、施工准备1、技术准备(1)本工程需要满足的强制性条文详见下表,施工之前由项目技术负责人组织全体施工人员学习掌握有关强制性条文和施工方案。序号标准编号条款编号内容简介1GB50204-20026.2.1预应力钢束进场时,应按GB/T5224等的规定抽取试件作力学性能检验,其质量必须符合有关标准的规定。2GB50204-20026.3.1预应力筋安装时,其品种、级别、规格、数量必须符合设计要求。3GB50204-20026.4.4后张法预应力结构件,预应力筋断裂或滑脱的数量严禁超过同一截面预应力筋总根数的3%,且每束钢丝不得超过一根。4GB50204-20027.2.2预应力混凝土结构中,严禁使用含氯化物的外加剂5JGJ85-20023.0.2预应力筋-锚具组装件的静载锚固性能试验结果,应同时满足锚具效率系数等于或大于0.95和预应力筋总应变等于或大于2.0%两项要求。6JGJ85-20023.0.3锚具的静载锚固性能,应由预应力钢束-锚具组装件静载试验测定的锚具效率系数和达到实测极限拉力时组装件受力长度的总应变确定。(2)预制梁板施工前完成C50砼施工配合比的试验及上报验证工作。(3)张拉设备标定:对千斤顶、高压油泵、油表配套校验、标定,确定张拉力与油压(油表读数)的关系,作为张拉依据。(4)钢绞线下料长度,设计图纸明细标明:预应力钢束明细表梁板名称钢束编号单根下料长度(mm)根数延伸量(mm)锚具(套)波纹管长度(m)13m空心板中板N1138062×339.74×(M15-3)4×12.35(D56)N2138342×339.24×(M15-3)4×12.35(D56)20m矮T梁中梁N1209931×9702×(M15-9)1×19.69(D80)N2209631×9692×(M15-9)1×19.66(D80)(5)张拉控制应力计算①计算公式P=δcon×Ag×N×1/1000×B式中:P—预应力的张拉力,KN;δcon—预应力钢束的张拉控制应力,取1395MPa;Ag—每根预应力筋的截面积,取140mm2;N—同时张拉预应力筋的根数;取3和9B—超张拉系数,不超张拉的为1.0。②计算张拉力13m空心板中梁:N1束张拉力P=1395MPa×140mm2×3×1/1000=585.9KN;N2束张拉力P=1395MPa×140mm2×3×1/1000=585.9KN;320m矮T梁中梁:N1束张拉力P=1395MPa×140mm2×9×1/1000=1757.7KN;N2束张拉力P=1395MPa×140mm2×9×1/1000=1757.7KN;弹性模量E=1.95×105Mpa;公称面积Ag=140mm2的钢绞线,锚具为夹片式自锚式锚具,所以不需要超张拉。③张拉过程为:P0→P0.15→P0.3→P→持荷5min→锚固(6)张拉油表读数计算张拉油表读数按性线回归方程计算,线性回归方程由合肥工大共达工程检测试验有限公司开出的《千斤顶与油压表配套校验报告》No:QJD2011-0496号提供。预制梁板各束预应力特性表项目束号15%P(KN)30%P(KN)100%P(KN)左端伸长量(mm)右端伸长量(mm)总伸长量(mm)13m空心板中梁N187.89175.77585.939.739.779.4N287.89175.77585.939.239.278.420m矮T梁中梁N1263.66527.311757.77070140N2263.66527.311757.76969138张拉应力与油压(油表读数)关系表项目束号顶号初张15%30%100%应力(KN)读数(MPa)应力(KN)读数(MPa)应力(KN)读数(MPa)13m空心板中梁N1070413#顶87.893.41175.776.41585.920.44070414#顶2.315.3119.34N2070413#顶3.416.4120.44070414#顶2.315.3119.3420m矮T梁中梁N1809252#顶263.666.21527.3110.791757.732.14805203#顶4.178.7129.90N2809252#顶6.2110.7932.14805203#顶4.178.7129.90809252#顶(300T),配压力表0063#,线性回归方程:Y=1.64+0.01735X、r=0.999999331;805203#顶(300T),配压力表816467#,线性回归方程:Y=-0.37+0.017223X、r=0.99999767;070413#顶(150T),配压力表8106781#,线性回归方程:Y=0.4+0.0342X、r=0.999996092;070414#顶(150T),配压力表5106471#,线性回归方程:Y=-0.7+0.0342X、r=0.999996092;式中:Y—油压表读书MPa、X—千斤顶荷载KN、r—相关系数2、场地准备:预制场建设已按专项方案实施完毕。3、材料准备(1)预制梁板所需水泥、碎石、具黄砂、钢筋、钢绞线、锚夹片、波纹管等所有材料进场,且各种材料规格型号和质量必须按设计及规范要求,检验合格后上报。(2)所需模板进场符合尺寸和检验质量,并打磨试拼。44、劳动力组织及进度安排为了能使首件制的顺利、准确的实施,成立梁板首件制工作领导小组,另外计划安排施工人员34人,其中技术人员2名,试验2名,生产及辅助工人30名,分工及其职责如下:序号姓名职务工作职责1徐龙学项目总工总体负责2杨启兵现场技术负责人负责现场施工技术工作、管理施工现场的人员、机械调配及施工安排,施工现场技术交底、施工工艺、数据收集等工作。3庾炳嶂试验负责人负责现场泥浆比重、原材料、混凝土配合比及坍落度的试验及资料整理等工作。4杨厚谊质检负责人负责现场施工质量、安全、环保等专项工作。5陈雷安全负责人负责现场安全,安全教育、安全交底等工作。6罗光明测量负责人负责现场的各项施工测量工作、并提交完整的资料。5、主要机械设备配置根据梁板的结构材料及施工特点,采用以下主要机具设备,见下表。序号名称规格型号数量序号名称规格型号数量1拌和楼120式1台10装载机50L1台2强制式搅拌机JS7501台11钢筋调直机1台3发电机120KW1台12钢筋切断机1台4龙门吊75吨2台13钢筋弯曲机1台5砼运输罐车10方2台14电焊机2台6振动棒30、505台15吊车1台7液压千斤顶YCT150B4套16T梁模板2套半8油压表1.5级60MPa4个17空心板模板外模3套9压浆泵UB-3型1台18空心板模板芯模3套6、其他准备(1)场地布置:在K27+100预制场进行,具体场地布置图详见预制场建设方案。(2)进场道路:各种材料运输及管理通道可由县道X059在K26+900分离立交右转即可进入预制场,入口处与既有公路接口处按规定设置明显标志,并派专人指挥交通,确保交通安全及畅通。(3)施工用电:采用预制场专用电500KV变压器,并备用120KW发电机。(4)施工用水:打水井作为梁板的施工用水。(5)临时通讯:施工通讯利用当地通讯系统,主要人员配备移动电话以便联系。四、施工计划1、准备阶段:2011年8月10日~2011年8月23日,做好施工前的技术交底和安全交底;组织本次工程相应人员、机械、材料等。2、实施阶段:2011年8月23日~2011年8月28日,主要进行梁板的钢筋笼制作、模板安装、浇筑混凝土、养护等。53、

1 / 34
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功