金马湖A1区别墅工程试验方案

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

308一期1沿海公司金马项目目录一、工程概况······································································2二、编制依据······································································3三、编制说明······································································5四、钢筋原材······································································5五、钢筋连接试件································································8六、水泥取样及送检·····························································8七、砂取样及送检································································8八、混凝土工程···································································8九、回填土········································································12十、结构实体检验用同条件养护试件强度检验计划·····················13十一、结构实体钢筋保护层厚度检验·······································14十二、砌筑砂浆··································································15十三、墙体材料··································································15十四、其他材料··································································16十五、现场试验要求····························································16308一期2沿海公司金马项目工程试验方案一、工程概况工程名称:308一期(1#、3#楼)。建设单位:成都市盈庭置业有限公司。建设地点:成都市温江区金马镇。该工程建筑规模:两栋别墅总建筑面积1#楼1111.83㎡,建筑基底面积386.78㎡;3#楼总建筑面积1044.365㎡,建筑基底面积260.82㎡。建筑层数为:地上三层。建筑高度1#楼为12.175m,3#楼建筑高度11.937m。建筑工程等级为二级,建筑防火耐火等级住宅为二级,地下室为二级。屋面防水等级二级,地下室防水等级二级,结构类型及抗震设防烈度住宅为异形柱框—剪力墙结构烈度为7度,建筑防火等级Ⅱ。建筑物使用年限为:50年。结构工程概况:根据建筑抗震设防分类标准本工程为丙类建筑,建筑结构安全等级二级,地基基础设计等级丙级,为钢筋混凝土异形柱框架—剪力墙结构共四层,抗震等级,剪力墙二级,框架三级,建筑耐火等级一级,混凝土结构的环境类别为一类,±0.000以下及露天部分为二0类,砌体施工质量控制等级B级。基础采用柱下独立基础。本工程主要材料:混凝土强度等级:基础垫层为:C15独立基础为:C25柱墙梁为:C25308一期3沿海公司金马项目板及楼梯为:C25构造柱过梁窗台卧梁及其它现浇构件C20。钢材:HPB235、HRB335级钢筋,HRB400钢筋CRB550冷扎带肋钢筋。焊条:E43形用于Q235钢及HPB235级钢筋级钢筋间焊接;E50形用于HEB335级或HPB235级钢与HPB335级钢间的焊接。E55形用于HRB400级钢间或HPB400级钢秘HPB235、HPB335钢间焊接。钢板、型钢Q235。钢材的屈服强度实测值与抗拉强度实测值的比值不应大于0。85,钢材应有明显的屈服强台阶,且伸长率不应小于20%,钢材具有良药苦口好的可焊性和合格的冲击韧性,填充墙:200墙均采用页岩空心砖(容重≥1000kg/m3)。120墙为页岩实心砖,地坪以下墙体采用页岩实心砖,均为M5.0混合砂浆砌筑。空心砖强度等级≥5.0。二、编制依据1.施工图建设单位提供的结施图、建施图、电施图、水施图各一套。2.文件名称:308一期4沿海公司金马项目四川省建设工程施工试验实行有见证取样和送检制度的暂行规定四川省建设工程施工试验实行有见证取样和送检制度的暂行规定的补充通知关于转发建设部《房屋建筑工程和市政基础设施工程实行见证取样和送检的规定》3.规范、规程:类别名称编号国家普通混凝土拌合物性能试验方法标准GB/T50080-2002普通混凝土力学性能试验方法标准GB/T50081-2002建筑地基基础施工质量验收规范GB50202-2002砌体工程施工质量验收规范GB50203-2002混凝土结构工程施工质量验收规范GB50204-2002屋面工程质量验收规范GB50207-2002建筑地面工程施工质量验收规范GB50209-2002建筑装饰装修工程质量验收规范GB50210-2001民用建筑工程室内环境污染控制规范GB50325-2001钢筋混凝土用热轧带肋钢筋(HRB335、HRB400)GB1499.1-1998钢筋混凝土用热轧光圆钢筋(HPB235)GB13013-91低碳钢热轧圆盘条(Q235)GB/T701-1997冷轧带肋钢筋混凝土结构技术规程(CRB550)JGJ95-2003钢筋焊接及验收规范JGJ18-2003308一期5沿海公司金马项目钢筋机械连接通用技术规程JGJ107-2003/J257-2003砌筑砂浆配合比设计规程JGJ98-2000类别名称编号行业烧结页岩砖、烧结粉煤灰砖GB5101-2003建筑工程饰面砖粘结强度检验标准GJ110-97地方预拌混凝土质量管理规程GB/T14092-2003三、编制说明1.当工程施工流水段划分及材料供应情况有变化时,本试验计划需相应进行调整。2.未编入试验计划,但是相关文件或标准规范要求试验的项目,需要按相关检验试验要求调整本试验计划。四、钢筋原材1.执行标准:《钢筋混凝土用热轧带肋钢筋》GB1499.2-1998《钢筋混凝土用热轧光圆钢筋》GB13013-91《低碳钢热轧圆盘条》GB/T701-1997《冷轧带肋钢筋混凝土结构技术规程》JGJ95-2003308一期6沿海公司金马项目2.取样:2.1热轧带肋钢筋、热轧光圆钢筋、冷轧带肋钢筋2.1.1原材料试验(带肋、光圆)每批按同一厂别、同一炉缸号、同一规格、同一级别和同一交货状态、每批60t为一验收批、不足60t也按一批计,每一验收批取一组试件(抗拉2个、弯曲2个)。任选两根钢筋切除端头500mm,然后按规定切取试件。2.1.2盘条钢筋必试内容:抗拉试验、弯曲试验。同一厂别、同一炉罐号、同一规格、同一交货状态、每批60t为一验收批、不足60t也按一批计。在每一验收批取一组试件,其中抗拉1个弯曲2个(取自不同盘)。试验项目:抗拉试验(屈服点、抗拉强度、伸长率)、弯曲试验。2.1.3冷轧带肋钢筋钢筋应成批验收,每批由同一钢号、同一规格和同一级别的钢筋组成,每批不大于50T。钢筋力学性能和工艺性能应逐盘进行检验,从每盘中任一端截取500后取切试样,一个作抗拉强度和伸长率试验,另一根个试冷弯试验。3.评定标准3.1外观检查合格;3.2力学试验项目合格;3.3符合要求为合格品,如有某一项试验结果不符合标准要求,应从同一批中再任取双倍数量进行复检,若再有一个指标不合格则判定整批项目308一期7沿海公司金马项目不合格。4.钢筋原材试验计划表。308一期工程序号材料名称钢筋规格数量(t)使用部位取样组数见证数量1热轧光圆钢筋Ⅰ级62.04基础主体箍筋及墙筋112热轧光圆钢筋Ⅰ级88.14基础主体箍筋及墙筋113热轧光圆钢筋Ⅰ级1011.595基础主体箍筋及墙筋114热轧带肋钢筋Ⅰ级123.075基础主体箍筋及墙筋115热轧带肋钢筋Ⅱ级121.92柱筋116热轧带肋钢筋Ⅱ级142.285柱筋117热轧带肋钢筋Ⅱ级1614.84柱筋118热轧带肋钢筋Ⅱ级184.74柱筋119热轧带肋钢筋Ⅱ级200.55柱筋1110热轧带肋钢筋Ⅱ级220.6柱筋1111热轧带肋钢筋Ⅲ级142.1梁筋1112热轧带肋钢筋Ⅲ级167.64梁筋1113热轧带肋钢筋Ⅲ级1810.8梁筋1114热轧带肋钢筋Ⅲ级203.1梁筋1115热轧带肋钢筋Ⅲ级222.87梁筋1116热轧带肋钢筋Ⅲ级252.8梁筋1117冷轧带肋钢筋715.8板筋11308一期8沿海公司金马项目18冷轧带肋钢筋87.2板筋1119冷轧带肋钢筋102.9板筋11注:钢筋原材取样根据现场进料数量确定,如施工情况变化较大时,按实际取样,严格按照规范规定执行。五、钢筋连接试件1.梁筋为闪光对焊:在同一台班内,由同一焊工完成300个同牌号、同直径钢筋焊接接头为一批,当同一台班内焊接头数量较少,可在同一周之内累计计算,累计仍不足300个接头时,应按一批计算。力学性能试验取6个试接头,其中3个拉伸,3个弯曲试验。2.电渣压力焊:以300个接头同牌号钢筋作为一批,在房屋结构中,不超过二层中300个接头同牌号钢筋接头为一批,不足300个接头也按一批计。力学性能试验从每批中随机切取3个接头做拉伸试验。六、水泥取样及送检按同一生产厂家、同一等级、同一品种、同一批号且连续进场的水泥,袋装不超过200t为一批,散装不超过500t为一批,每批抽样不少于一次。七、砂取样及送检以为400m3或600t一个取样单位。八、混凝土工程本工程全部采用预拌混凝土,本工程试验项目中不涉及原材试验项目。308一期9沿海公司金马项目1.执行标准《混凝土结构工程施工质量验收规范》(GB50204-2002)《预拌混凝土质量管理规程》(GB/T14902-2003)《民用建筑工程室内环境污染控制规范》(GB50325-2001)2.取样3.坍落度测试:要求每进场一车混凝土都进行坍落度测试。4.普通砼取样1)混凝土试块的留置应按检验批进行,每一验收批不超过100m3的同配合比的混凝土,其中标养试件不得少于一组,试件尺寸100mm×100mm×100mm。2)当一次连续浇注超过1000m3时、同配合比的混凝土每200m3混凝土取样不得少于一次。3)每一楼层,同一配合比的混凝土,取样不得少于一次,4)建筑地面的混凝土,以同一配合比,同一强度等级,每一层或每1000m3为一验收批,不足1000m3也按一批计,每批应至少留置一组试块。5)用于结构实体检验的混凝土,其取样部位和数量在工程开工前与监理单位协调确定。6)每次取样应至少留置一组标准养护试件,同条件养护试件的留置组数应根据实际需要确定,下列部位需要留置同条件试块:顶板拆模用试块,墙体外挂架子试块,结构实体检验试块,其留置组数根据工程需要确定。7)防水混凝土抗渗性能取样:a.混凝土强度等级、抗渗等级、同一配合比、生产工艺基本相同、每308一期10沿海公司金马项目单位工程不得少于两组抗渗试块(每组6个试块);应采用标准条件下养护混凝土抗渗试件作为试件实验结果评定。b.连续浇筑混凝土每500m3应留置一组抗渗试块(每组6个试块)试件尺寸为Φ175mm×185mm×150mm,且每项单位工程不得少于两组。每增加250~500m3时应增加两组。c.留置抗渗试块的同时需留置抗压强度试块应取自同一盘混凝土拌合物中。d.试块应在浇筑地点制作。5.取样计划1#楼混凝土试块取样表序号层号部位强度等级砼数量(m3)

1 / 19
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功