混凝土施工方案-

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

东方夏威夷C区-------混凝土工程施工方案1目录一、编制依据·····································3二、工程概况····································32.1建筑设计概况·································42.2结构设计概况··································4三、施工部署3.1施工组织······································53.2任务划分······································63.3组织协调······································6四、施工准备4.1技术准备······································64.2劳动力准备····································74.3材料及机械准备································8五、主要分项施工方法5.1混凝土工程工艺流程·····························95.2砼配合比的设计·································95.3砼的输送······································105.4混凝土的浇筑··································105.5砼的振捣······································125.6防水混凝土施工································135.7混凝土的养护··································145.8施工缝的留置和处理····························15东方夏威夷C区-------混凝土工程施工方案25.9混凝土冬期施工·······························16六、质量计划6.1混凝土工程质量要求···························176.2混凝土工程质量允许偏差·······················186.3混凝土工程质量控制点设置·····················196.4制度措施·····································236.5混凝土工程质量记录···························27七、成品保护····································28八、安全文明施工8.1安全施工····································288.2消防保卫····································308.3文明施工····································318.4防止扰民措施································31东方夏威夷C区-------混凝土工程施工方案3一、编制依据结构施工图纸2010-1038预拌混凝土规程GB14902-2003混凝土强度检验标准GB/T50107-2010《普通混凝土配合比设计规程》JGJ55-2000;J64-2000;《混凝土外加剂应用技术规范》GB50119-2003《回弹法检测混凝土强度技术规程》JGJ/T23-2001《混凝土结构工程施工质量验收规范》GB50204-2002《混凝土结构设计规范》GB50009-2001《高层建筑混凝土结构技术规程》JGJ3-2002;J186-2002《建筑工程施工质量验收统一标准》GB50300-2001《建筑机械使用安全技术规程》JGJ33-2001《混凝土泵送技术规程》JGJ/T10-95山东省建筑工程资料管理规定《施工组织设计》二、工程概况东方夏威夷C区37#、38#、41#、42#、51#工程位于胶州市李哥庄204国道南侧,工程由青岛恒沣永基置业有限公司开发,山东意林建筑规划设计研究院有限公司设计,青岛公信建设监理有限公司监理,青岛龙泰建设集团有限公司总承包施工。东方夏威夷C区-------混凝土工程施工方案41、建筑设计概况本工程规划与设计:本工程为多层住宅小区。建筑面积约:m2该工程37#、51#楼为五层加附房。38#、41#、42#楼为六层加附房。2、结构概况2.1基础形式:预制管桩基础2.2结构形式:结构形式:砖混结构。2.3抗震等级:框架四级,2.4各部位混凝土设计强度(以正式图纸为准)基础垫层C20;基础:C35;砖混结构主体柱、梁板梯为c252.5混凝土保护层(1)基础:底部50mm,上部20mm。(2)其它各层梁为:25mm且不小于钢筋直径。(3)柱子:30mm且不小于钢筋直径。(4)各层楼板、楼梯间及其他混凝土墙为:15mm,暗柱20mm。三、施工部署3.1施工组织本工程混凝土施工组织机构详见《施工组织设计》,混凝土工程的东方夏威夷C区-------混凝土工程施工方案5管理体系为:砼工工长下设四个施工作业班组。3.2任务划分混凝土工程包括混凝土的运输、浇筑、振捣、养护及相应的文明施工。3.3组织协调混凝土工程在砼工长的指挥下,服从项目部的各项指令,砼工工长负责协调混凝土工程的与其他工种及工种内的各项事务。混凝土工进场后在基础钢筋施工阶段全力以赴混凝土浇筑前的准备工作。四、施工准备4.1技术准备4.1.1认真熟悉图纸,随时掌握设计变更内容,并及时修改到相应图纸上。熟悉构件各部位混凝土的截面尺寸、设计强度及不同部位混凝土保护层厚度变化。4.1.2根据图纸内容及施工规范规定要求进行施工组织编制,同时根据施工的需要确定施工流水段的划分。根据流水段的划分进行施工机械的配置。本工程地下部分分为南北两个流水段,共计四个区。4.1.3组织工人进行施工前技术交底和操作培训学习;了解施工过程中的质量控制点,施工作业中做到重点突出、心中有数。4.1.4制定出详细的施工进度计划,从质量、成本、进度三方面进行控制,确保工程顺利进行;4.1.5编制详细的施工组织设计及各分部分项工程的施工方案,以方案指导施工;确保施工质量符合质量计划要求。东方夏威夷C区-------混凝土工程施工方案64.1.6编制施工预算,提出设备、材料计划。4.1.7、依据现场原始水准控制点,在现场测设控制点。施工时各楼层的浇筑标高控制依据楼层标高+0.500控制点进行测设。控制点的位置、数量满足混凝土浇筑的使用要求。本工程±0.000点相当于绝对标高7.800米。4.1.8、混凝土浇筑前,由技术员、质检员协同施工工长对操作班组进行施工操作过程的质量及技术交底,掌握施工质量控制要点,明确分工,责任到人,保证混凝土的浇筑顺利进行。4.1.9、混凝土浇筑前,由施工工长填报混凝土浇筑申请单,项目技术负责人审核,报经监理部门审批后方可施工。4.2劳动力准备4.2.1混凝土成型后的质量取决于混凝土工程施工过程中的搅拌、浇筑和振捣。因此,在劳动力投入时,优选有振捣经验的熟练工,保证浇筑及振捣过程符合规范及施工要求,确保砼成型后质量符合《混凝土结构工程施工质量验收标准》(GB50204-2002)及《建筑施工质量统一验收标准》GB50300-2001的规定。4.2.2劳动力布置因考虑基础与主体部分单位面积工程量的不同,故在劳动力布置时将主体和基础分开考虑,总体混凝土工分为4个施工班组。施工价段砼工抹灰工泵工基础价段204东方夏威夷C区-------混凝土工程施工方案7主体价段301544.3材料及机械准备4.3.1本工程在基础及主体混凝土施工过程中将投入下列机械:序号名称数量型号备注1混凝土泵4台HBT802平板振捣器3台1.1KW3插入式振捣棒10支30cm4插入式振捣棒30支50cm5泵管300mф1256试模30套150*150*1507抗渗试模6套8恒温器、空调各1台9塌落度桶2套10砼布料机2台臂长15米4.3.2混凝土材料4.3.2.1本工程基础及主体部分混凝土均采用商品砼。五、主要分项施工方法东方夏威夷C区-------混凝土工程施工方案85.1混凝土工程工艺流程5.2砼配合比的设计5.2.1砼配合比必须由具有一定资质的实验室进行配合比设计,配合比按设计的砼强度等级提前做好试配,设计的配合比必须达到现场泵送及操作要求,具有良好的和易性,塌落度应在160-180mm为宜。为不使砼出现冷缝,必须使砼的初凝时间达到6-8h。在春夏季应掺加缓凝剂,冬季掺加早强剂,同时为了达到更好的泵送性能需掺加一定的泵送剂。5.2.2混凝土配合比设计,除满足设计强度等级和抗渗标号外,还商砼厂家各种原材料进场做出不同强度混凝土试配依据图纸设计要求提前提出浇筑计划现场通过检查发出浇筑令混凝土搅拌抽检混凝土塌落度混凝土浇筑混凝土拆模留置现场混凝土试块试压拆模用混凝土试块混凝土养护、修补及时养护修补现场试块抗压实验混凝土质量评定分析东方夏威夷C区-------混凝土工程施工方案9应达到≤混凝土外加剂应用技术规范≥中对补偿收缩砼限制膨胀率的要求。5.3砼的输送砼浇筑时,商品混凝土的运输车辆配备专人联系并对过往的现场车辆进行调度。砼的输送使用砼输送泵输送至浇筑工作面,按浇筑路线依次浇筑。砼泵管管径采用125mm,并用φ48钢管搭设支架架空,浇筑时专门安排人接拆泵管,泵管线要直,转弯要缓,接头必须严密,防止混入空气产生阻塞。泵送要连续进行,如输送泵发生故障,立即改用备用输送泵泵输,保证浇筑不停止。输送泵间歇超过45分钟要立刻拆管,用水冲洗管内残留砼。输送过程中泵的受料斗内要有足够的砼,保证砼能淹盖输送孔,防止吸入空气产生阻塞。5.4混凝土的浇筑5.4.1浇筑条件:钢筋工程的隐蔽验收合格,模板工程的预检完毕、予埋件(钢板止水带等)安装完毕,安装工程施工验收合格。混凝土浇灌令、开盘鉴定等相关资料准备签认完毕。施工缝处表面混凝土必须满足下列条件:以清除浮浆剔凿出石子并用清水冲洗干净。对浇筑施工部位钢筋采用塑料布封裹,防止砂浆污染。5.4.2泵送前应用适量的与混凝土成分相同的水泥砂浆润滑输送泵管。5.4.3地下室外墙后浇带、楼板施工缝应按图纸要求方法进行留东方夏威夷C区-------混凝土工程施工方案10置,地下室部位外墙部位墙和楼板、楼板和墙处留置水平施工缝。在进行下一次混凝土浇筑前,在墙厚度中部放置止水钢板。5.4.4浇筑竖向结构混凝土前在底部应先填以50±25㎜厚混凝土配合比相同的无石子砂浆;5.4.5不同强度等级的混凝土浇筑时,先浇筑强度等级高的混凝土,后浇筑强度等级低的混凝土,必须在强度等级高的混凝土初凝前浇筑,中间或周围用钢丝网相隔。5.4.6浇筑混凝土的过程中应派专人看护模板,发现模板有变形,位移时立即停止浇筑,并在已浇筑的混凝土凝结前修整完好。5.4.7混凝土浇筑完毕后凝固前及时用湿抹布将局部漏浆、掉浆擦去(备一装水工具桶,用抹布在桶里沾水擦洗);用同样方法及时将污染在钢筋上的混凝土浆清除。浇筑完毕后的浮浆应在混凝土没有凝固前刮去(采用小块铁皮)。5.4.8每层板混凝土浇筑完毕凝固前必须顺同一方向用扫帚(帚茬硬度、布置均匀)扫毛,扫毛纹路要清晰均匀、方向一致。5.4.9混凝土自高处倾落的自由高度不得超过2m,浇筑的竖向结构高度超过3m时,采用振动溜管(φ125)使混凝土下落,以免混凝土发生离析。5.4.10在混凝土终凝前必须进行压光,把非结构性表面裂缝(由于混凝土的沉降及干缩产生)修整压平(然后再覆盖养护)。5.4.11浇筑剪力墙中门窗洞口位置混凝土时,应从门窗洞口两侧同时下料,且高差不宜太大。先浇筑窗台下部,后浇筑窗与窗、窗与门、东方夏威夷C区-------混凝土工程施工方案11门与门间墙。5.4.12两泵管间橡皮垫、卡具必须套上;拆泵管

1 / 31
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功