-1-目录第一章综合说明…………………………………………………………………………4第一节工程概况···························4第二节工程现场状况·························4第三节编制依据···························5第四节编制原则···························5第二章施工部署及总平面布置·······················5第一节施工临时设施布置·······················5第二节施工总平面布置·························6第三章项目经理部的组成·························7第一节施工组织管理机构·······················7第二节施工组织管理机构职责·····················8第四章劳动力安排····························10第一节劳动力部署及任务划分·····················10第五章施工进度计划及工期保证措施····················10第一节总体施工进度计划·······················10第二节施工顺序安排·························10第三节工期保证措施·························11第六章主要施工机器、设备及材料投入计划·················16第一节主要施工机械设置原则·····················16第二节主要施工机械配置·······················16第三节主要试验、测量、质检仪器···················16第四节主要材料、机械设备、构配件计划················16第七章关键施工技术、工艺及工程项目实施的重点、难点分析、解决方案和各分部分项工程施工方法·······························17第一节测量放线···························17第二节土方工程···························18第三节钢筋工程···························19第四节模板工程···························21第五节混凝土工程··························22第六节砌体工程···························24-2-第七节管道工程···························25第八节道路工程···························33第九节装饰工程···························42第十节机电设备安装···························45一、主要设备施工方法························45二、格栅间及进水泵房设备安装·····················50三、细格栅间及旋流沉砂池设备安装··················53四、厌氧池及氧化沟设备安装·····················55五、沉淀池及配集水井设备安装····················56六、污泥泵房设备安装·························59七、污泥浓缩脱水机房设备安装·····················60第八章管道施工工艺···························61第一节大口径钢管预制························61第二节管道安装····························62第三节管道系统的试验························66第四节管道系统的清洗························67第五节UPVC管道安装·························67第六节管材、管件的堆放及运输····················69第七节钢筋混凝土管安装技术措施···················69第九章电气施工方法···························70第一节主要施工方法和技术要求····················71第十章确保工程质量的技术组织措施····················75第一节质量目标···························75第二节质量保证措施·························77第三节结构防渗漏保证措施······················79第四节对预埋件、预留孔洞的保证措施·················81第五节施工期间对隐蔽工程质量保证措施················82第十一章雨季施工措施··························83第十二章新技术及科研成果的应用·····················85第十三章确保安全生产的技术组织措施···················86第十四章环境保护措施··························95-3-第十五章消防措施····························95第十六章确保文明施工的技术组织措施···················96一、文明施工领导小组·························96二、文明施工措施及设想························97三、卫生防疫措施···························97四、安全保卫措施···························97五、环境保护措施···························98第十七章确保工期的技术组织措施·····················98第十八章现场维护措施·························100第十九章工程交工后服务措施······················101一、质量回访····························101二、保修期限····························101第二十章附表………………………………………………………………………………1021、附表一:拟投入本工程的主要施工设备表………………………………………….1022、附表二:拟投入本工程的实验和检测仪器设备表…………………………………1033、附表三:劳动力计划表………………………………………………………………1044、附表四:总施工进度计划表…………………………………………………………1055附表五:施工总平面图…………………………………………………………………1066、附表六:临时用地表…………………………………………………………………107-4-第一章综合说明第一节工程概况本工程座落于榆林市佳县王家砭镇,该污水处理厂用地面积为18810平方米,其主要建设范围为:综合办公楼、锅炉房、食堂、污泥池、综合处理间、综合设备间、粗细格栅间、调节池、污泥脱水间与除臭间、消毒池、清水池与泵房、门卫室与及后期安装工程。第二节工程现场状况1、工程重点:1)位置环境属沙漠风积砂丘半干旱地区,冬长夏短,四季分明,雨量不足,冬季寒冷风沙大,极端最低气温-30℃,是这一地区的特点。因此,为确保施工工期,须合理安排生产计划,如工期进入冬季施工必须制定恰当的冬季施工措施,是本工程重点之一;2)本工程工期较为紧张,合理安排施工机械及人员,灵活调配施工材料是本工程的重点;3)由于工程处于工业园区,协调工作是本工程重点之一;2.厂内建(构)筑物一览表:序号名称建筑面积(㎡)1综合办公楼5742食堂125.53锅炉房1604门卫室22.85消毒池、清水池与泵房1766综合处理间与生化反应池17017调节池与事故池5508污泥池369污泥脱水间与除臭间36310粗细格栅间与集水池1895、工期本工程工期为120日历天,开工日期以甲方确定开工日期为准。-5-第三节编制依据本工程根据工程招标文件、设计施工图纸、市政建筑安装工程施工及验收规范等有关文件,结合现场踏勘情况和我公司具体情况而编制的。主要解决和阐述涉及本工程的施工组织管理,主要分部分项工程的施工方法与技术措施,确保工程质量与工程进度措施,创安全生产、文明施工标化管理措施,以及相应的人、财、物力配套计划与投入,对关键部位的施工作了详尽的编写与介绍,目的是确保本工程在科学的管理下,通过有的预控,有组织、有计划地完成既定的各项指标。第四节编制原则1、根据设计图纸、国家和地方的有关技术规范、规程的规定,认真分析研究,制定切实可行的施工技术措施;2、总体考虑、全面协作,选择适宜本工程条件的施工机械设备和人员,发挥设备人才优势,认真分析,充分比较、论证,合理地规划整个工程的施工程序、技术措施,减小施工干扰,加强各施工工序之间的衔接,提高施工效率,确保施工质量和进度;3、本方案中沉井施工工艺,如遇地质情况与勘查资料不符的情况,方案中部分内容将结合实际进行调整;4、遵循《安全生产法》、《环境保护法》与《地方施工工程文明施工管理验收标准》和其他的法律、法规,做到安全生产无事故、现场清洁无污染;5、认真贯彻执行“百年大计,质量第一”的质量方针,在业主和监理工程师的指导下,优质、高效地完成本工程施工,交给业主一份满意的答卷。第二章施工部署及总平面布置第一节施工临时设施布置1、施工现场总平面布置原则①既要满足施工,方便施工管理,又要能确保施工质量、安全、进度和环保的要求,不能顾此失彼;②在允许的施工用地范围内布置,避免扩大用地范围,合理安排施工顺序,分期进行-6-施工场地规划,将施工对周边环境影响程度降至最小,将现有场地的作用发挥到最大化;③施工布置需要整洁、有序,同时做好施工废水合理排放,做好防尘、防噪措施,把创建文明施工工地作为宣传的窗口;④场地布置要遵循“三防”原则,消除不安定因素,防火、防水、防盗设施齐全,布置合理;2、场区临时路为节约工期,厂内临时道路结合其规划路进行布置,路宽4~8米。该临时路沿规划路分层碾压1米左右厚的结构层并与厂外路接通。3、场区用水用水方案的选择根据业主提供的临时施工水源的位置而定。计划用水量主要从混凝土施工用水(混凝土的搅拌、养护),辅助生产施工用水(机械设备用水、施工工艺用水)以及生活和消防用水三项用水量之和来考虑。4、场区排水雨季及汛期应作好排水工作,生产及生活区周围沿施工辅道须设1.0×1.0m明排水渠,过路处设置Φ500mm过路管;在现场设临时泵站和沉淀池,将集水井的水及时排走。5、临时用电根据厂外供电条件及厂内施工用电量的需要,在厂内设置1台320kva的变压器,变压器的设置以尽量兼顾多方向的用电为原则,由厂外接入10kv的线路,厂内供电线路的布设沿施工辅道进行。厂内另配120KW的发电机1台,以防停电而影响施工正常进行。6、通讯厂内的通讯设施需要安装座机1部,宽带网络一套,配备移动电话数部,用以联络业主、监理、设计以及施工各部门,加强信息化管理。7、生产、生活区的布置根据施工现场的条件,计划在场区征地线以外设置职工生活区及施工队生活区,临时办公区。在场区内设置砂石料场和搅拌站一座以及加工区两处、存土区1处。8、施工现场的围蔽厂区实行围蔽围墙砌筑。场内主要在场区设置两处进出口,在进出口处设置门卫做好施工现场的记录及保卫工作。第二节施工总平面布置施工总平面布置本着因地制宜,便于施工的原则布置,详见平面布置图(附表五)。-7-第三章项目经理部的组成第一节施工组织管理机构为安全、优质、按期地完成本标段的施工任务,本着精干、高效的原则,同时根据本工程的施工特点及初步拟定的施工程序,将由我公司中理论和实践经验丰富、业