川盐连锁广安物流配送中心办公楼玻璃幕墙工程专项施工方案四川华西蜀港装饰工程有限公司二0一四年三月十二日施工方案审批表工程名称川盐连锁广安物流配送中心办公楼玻璃墓墙工程建设单位四川省盐业总公司广安分公司监理单位四川得友建设工程有限公司施工单位邻水县中信建筑工程有限公司方案名称玻璃幕墙专项施工方案编制审核建设单位意见(盖章)监理单位意见(盖章)施工单位意见(盖章)目录第一章编制依据···························································1第二章工程概况···························································1第三章工程施工说明·······················································2一、施工依据··························································2二、设计荷载··························································3三、材料简介··························································3四、幕墙防雷··························································4五、幕墙埋件··························································5六、幕墙分格··························································5七、幕墙标高及位置····················································5八、幕墙的性能等级····················································5第四章施工总体部署······················································5一、施工组织机构······················································7二、项目管理机构的组成和职能··········································8第五章施工准备·························································16一、施工准备·························································16二、作业条件·························································18第六章玻璃幕墙安装工艺流程及技术方案···································18一、安装准备工作·····················································19二、测量放线·························································19三、楼层连接件安装···················································23四、铝合金竖框安装···················································25五、铝合金横框安装···················································26六、玻璃板块安装·····················································27七、注胶密封·························································28八、安盖口条和装饰压条···············································29九、保护和清洁·······················································30十、验收、维修······················································30第七章施工安全保证措施及文明施工措施··································31第八章幕墙防雷·························································32主要施工机械设备表···················································341玻璃幕墙专项施工组织设计第一章编制依据1.川盐连锁广安物流配送中心办公楼玻璃幕墙工程图纸。2.国家及建设部颁发的现行施工、设计和技术规程。3.对图纸的会审和施工现场的实地考察。第二章工程概况1.工程名称:川盐连锁广安物流配送中心办公楼玻璃幕墙工程2.建设地点:广安市枣山物流园区3.建设单位:四川省盐业总公司广安分公司4.主体结构形式:现浇钢筋混凝土框架结构体系5.幕墙范围:2-3轴至2-6轴.2-8轴至2-12轴圆弧部分以及2-14至2-17轴玻璃幕墻。6.幕墙结构设计使用年限:25年。7.工程工期:30个工作日。8.质量要求:达到国家现行《工程施工验收规范》标准,合格标准。2第三章工程施工说明一、施工依据1.《建筑结构可靠度设计统一标准》GB50068-20012.《建筑玻璃应用技术规程》JGJ113-20093.《建筑幕墙工程技术规范》JGJ102-20034.《金属与石材建幕墙工程技术规范》JGJ133-20015.《公共建筑节能设计标准》GB50819-20056.《建筑幕墙》GB/T21086-20077.《建筑结构荷载规范》GB50009-20128.《建筑抗震设计规范》GB50011-20109.《建筑设计防火规范》GB50016-200610.《建筑物防雷设计规范》GB50057-201011.《钢结构设计规范》GB50017-200312.《建筑钢结构焊接技术规范》JGJ81-200213.《建筑用硅酮结构密封胶》GB16776-200514.《石材用建筑密封胶》JC/T883-200115.《施工现场临时用电安全技术规范》JGJ46-200516.《建筑施工安全检查标准》JGJ59-9917.《建筑施工高处作业安全技术规范》JGJ80-9118.《铝合金建筑型材》GBT5237-2004319.《中空玻璃》GB/T11944-2002二、设计荷载1、风压作用风荷载标准值:wk=βz×μs×μz×ω0ω0——基本风压,取0.30KN/㎡(按重现期50年考虑)βz——瞬时风压阵风系数,按GB5009-2012选用μs——局部风压体型系数;μz——风压高度系数,地面粗糙度类别按“B”类;2、地震作用本地区抗震设防烈度取为6度,设计基本地震加速度值为0.05g,设计地震分组为第一组,水平地震影响系数最大值取为0.08。本工程抗震设防类别:重点设防类(乙类)。三、材料简介1、钢材幕墙所用钢材采用国产Q235B碳素结构钢,其中非装饰面的钢竖框、钢横框、埋件及连接件钢材表面采用热浸镀锌防腐处理,镀锌层应满足《金属覆盖层—钢铁制件热浸镀锌层技术要求及试验方法》GB/T13912-2002.2、玻璃:玻璃幕墙采用钢化中空玻璃6mm+12A+6mm;玻璃的相关参数应符合国家相关规范,标准的规定。43、铝塑板:本工程收口铝塑板采用4mm外墙用铝塑板,铝塑板表处理根据甲方要求进行处理;本工程内衬板采用3mm内装用铝塑板,铝塑板表面处理为粉末喷涂,颜色按建筑设计要求;铝塑板的相关参数应符合国家相关规范,标准的规定。4.不锈钢件:不锈钢材质除注明以外均采用AISI-304奥氏体不锈钢材;暴露室外的不锈钢螺栓为A4-70,室内不锈钢螺栓为A2-70。5、胶:本工程幕墙选用国产优质硅酮结构胶,硅酮耐厚密封胶,选用的胶产品必须符合国家相关产品标准规定,且必须在有效期内使用,使用前应经国家认可检测机构检测后方可用于工程施工。6、其他:幕墙材料的质量要求应符合《玻璃幕墙工程技术规范》第3章的有关规定,其它材料也必须符合国家现行规范规定及设计要求,且必须符合具有质量保证书。四、幕墙防雷本工程防雷施工详见施工图纸。5五、幕墙埋件本工程幕墙要求采用后补埋件的形式实现幕墙与主体结构的连接,根据本工程的幕墙分格和图纸中的节点,保证后补埋件埋设位置的准确性,埋件的位置偏差不应大于20mm。六、幕墙分格幕墙分格线为耐候胶密封中心线或幕墙边界线,为消化土建施工误差,应根据主体实际测量结果,进行微调分格尺寸。七、幕墙标高及位置本工程设计标高控制均以建筑或结构完成面标高为基准,施工中可根据建筑结构差换算以及平面尺寸确定幕墙位置。八、幕墙的性能等级空气渗透为4级,雨水渗漏2级,抗风压性能达到2级。第四章施工总体部署由于工期、气候及其它不利因素对施工工期的影响,因此施工企业的实力、加工厂的位置、施工企业的管理、项目管理机构人员的配置将是本工程顺利完成的重要保证。指导方针:安全第一,质量至上,优化总体配置,确保工期,保质量、6保信誉的完成施工任务。根据本工程交叉施工多、技术含量高、质量要求高的特点,幕墙施工安排的总体思路是“加大管理力度,提前准备,层层把关,保证材料供应,加强质量管理,确保一次到位”。当施工中出现交叉作业时,服从业主、监理和总承包单位的统一协调、安排及时调整施工计划。并配合好与其他工种交叉施工,使整个工程施工能同步进行,不影响整个工程的总工期。7一、施工组织机构项目施工组织机构设备管理材料供应及管理玻璃板块加工保安办公后勤石材面板加工加工门窗加工钢龙骨制作行政组质量检测安全生产文明生产质安组施工技术及资料石材面板安装玻璃面板安装工程技术组钢架及龙骨安装深化设计工艺制定试验检测设计组项目副经理项目副经理项目经理项目技术负责人工厂生产部项目总调度材料设备组财务管理工程预结算测量放线施工组综合组运输辅助工作门窗安装8二、项目管理机构的组成和职能1、项目经理职能项目经理负责主持制定项目管理方案,确定项目管理的目标与方针,制定工程质量计划,保证本项目按ISO9001质量保证体系运作。负责项目合同协商、合同签订、合同履行及相关事宜。代表公司及时、适当做出决策,主要包括投标报价决策、人事任免决策、重大技术方案决策、财务工作决策、资源调配决策、工期进度决策、合同变更决策等。与业主、监理公司、设计院、总包单位保持联系,随时协调解决出现的各种问题,确保业主利益。负责协调组合体内部事务,定期召开协调会,及时解决项目经理部内部问题。由公司工程部直接领导,全面管理工程施工过程,对工程项目质量、安全、文明施工、工期和工程成本等全面负责。贯彻执行国家、省、市有关法律、法规和政策,执行企业的各项管理制度;负责主持项目部日常工作;根据施工进度情况,调整资金流动、材料设备供应、人力机械使用等计划;组织制定项目施工管理机构各类管理人员的职责、权限和项目管理的规章制度并监督执行;9执行经济责任书中由项目副经理负责履行的各项条款;对工程项目施工进行有效控制,执行有关技术规范和标准,积极推广应用新技术,确保工程质量和工期,实现安全、文明生产,努力提高经济效益;运用现代化管理办法和应用新技术进行计划、组织、指挥、协调、控制,实现项目管理目标;主持项目施工、质量例会、签署开、竣工报告;组织指挥本工程项目的生产经营活动,调配并管理进入工程项目的人力、资金、物资、机械设备等生产要素;安

1 / 37
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功