超前钻探勘察方案 - 副本

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

超前钻探方案深圳地质建设工程公司二○一五年五月超前钻探方案编制:审核:总工程师:刘都义总经理:刘洪文深圳地质建设工程公司地址:深圳市罗湖区宝岗路电话:(0755)82666300目录一、工程概况········································································································1二、针对本项目的难点解决如下···········································································2三、勘察工作执行规范·························································································3四、勘察工作方法和内容······················································································3五、施工组织与设备配置······················································································5六、工期与进度计划·····························································································6七、安全及文明施工措施······················································································7八、技术服务措施·································································································7九、其他···············································································································8某某大厦超前钻探方案深圳地质建设工程公司1一、工程概况拟建建筑物由1栋19层;1栋20层办公楼和局部3层商业区组成,项目总用地面积约4458.8m2,总建筑面积34922.21m2。整体设3层地下室,基坑周线面积3519.8m2,开挖深度约9米。室外设计地坪标高约4.5m(暂定),场地平面总体呈“三角形”展布,结构类型为框剪结构。拟建场地位于深圳市南山区,月亮湾大道以南,前海路以西,周边交通条件便利,详见“场地位置示意图”。场地位置示意图(勘察场地)勘察场地某某大厦超前钻探方案深圳地质建设工程公司2场地现状根据建筑物基础图,本次设计为人工挖孔嵌岩桩(墩)基础,超前钻探孔共95个。单桩承台钻孔52个(zk1~zk52);多桩承台钻孔29个(zk53~zk81);独立基础钻孔14个(zk82~zk95)。详见“超前钻探孔布置平面图”。预估钻孔深度约6~15m,预估钻探总进尺约900m。二、针对本项目的难点解决如下根据本工程特点基坑内作业难度大,钻机搬迁难点大,我工程司计划将采用台XY-100形履带钻机和普通XY-100地质钻,对其进场野外勘察。场地高差较大地段需要甲方组织“三通一平”提供作业面。某某大厦超前钻探方案深圳地质建设工程公司3XY-100形履带钻机普通XY-100地质钻三、勘察工作执行规范序号技术标准名称属性1《岩土工程勘察规范》(GB50021-2001)(2009年版)国家标准2《建筑地基基础设计规范》(GB50007-2011)3《建筑抗震设计规范》(GB50011-2010)4《高层建筑岩土工程勘察规程》(JGJ72-2004)行业标准5《建筑桩基技术规范》(JGJ94-2008)6《土工试验方法标准》(GB/T50123-1999)(2008年版)7《建筑基坑支护技术规程》(JGJ120-2012)8《建筑地基基础设计规范》(DBJ15-31-2003)广东省标准9《地基基础勘察设计规范》(SJG01-2010)深圳市标准10《深圳市基坑支护技术规范》(SJG05-2011)四、勘察工作方法和内容在钻施工程中采用收集资料、钻探、野外判别、数码照相等综合方法,并对各方取得的信息进行综合分析,编制超前钻探报告。其目的为查明基础持力层深度及岩性,对主建筑物基础设计施工提供依据。1、收集资料收集与本工程相关资料等。2、地形图测量及地质测绘要求按照设计基础图为基准进行施工,不做其它要求。4、钻孔要求某某大厦超前钻探方案深圳地质建设工程公司41、基岩以上覆盖层采用合金普通三叶钻头进行钻探,钻至基岩时更换金刚石钻头进行入岩钻探,钻径79~110不等2、桩基入岩深度按3陪桩径且不小于5m考虑,独立(墩)基础入岩深度均按5m考虑,当基岩破碎时孔深应适当加深,有软弱夹层时应穿过软弱夹层下3倍D,当中风化岩厚度小于3陪桩径时,入岩深度应按5m考虑。3、桩入岩不小于0.5m,考虑到岩面倾斜本次按0.7m计,0.7+3倍D=实际入岩深度,入岩且不小于5m考虑。6、报告编制在完成室外勘探后,结合收集的相关资料,对以上资料进行综合分析,并与设计人员进行沟通,做到目的明确、建议合理,结论准确。报告分正文和附件,正文的编写按相关技术规范规程进行编写。附件主要为相关图表,包括地质状图、基岩等高线图等、编辑排版的场地及岩芯照片。8、预计主要勘察实物工作量钻探:95孔,总深度约1500.00m;编制勘察报告:4份,包括文字编写、图件编绘、场地及岩芯照片编辑等。某某大厦超前钻探方案深圳地质建设工程公司5五、施工组织与设备配置1、人员组织该项目我公司将派出经验丰富的项目负责人和钻探机长进场管理和施工,现场人员组织机构如下所示:项目负责∣项目技术负责∣现场工程师质量控制安全管理机械材料钻机组长现场人员必须接受公司现场负责人员的统一管理,并自觉执行公司质量手册中的技术要求和岗位责任制,严格执行公司质量管理体系及规范规程。某某大厦超前钻探方案深圳地质建设工程公司62、本项目拟投入的人员及设备配备情况项目负责1人注册岩土工程师现场负责1人工程师钻机机长4~5人钻探工人:各台钻机3人报告审核1人注册岩土工程师报告审定1人注册岩土工程师设备配备清单表设备名称数量规格备注钻机4~5台套XY-100型全站仪1台套数码相机1台套工作车1辆注:表中设备配置可根据场地条件结合施工进度增、减数量六、工期与进度计划1、工期计划施工时拟配置XY-100型履带钻机2台,普通钻机2~3台钻,现场工程师1名。预计野外工作时间为20天,野外完成后3日内提供电子版资料,5日内提交正式的超前钻探报告。此配置可根据实际情况及工期的具体要求进行调整,以保证勘察工作按业主要求保质保量完成。2、工期保证措施(1)充分发挥我公司的技术处、设备部及检测试验中心、图形部等配套齐全的优势,各职能部门积极配合,确保各工序工程质量和工期。(2)根据业主的工期要求增加钻探设备和相应的钻探机长和钻探技工,现场项目负责人现场统一协调管理技术指导。某某大厦超前钻探方案深圳地质建设工程公司7(3)做好施工材料(如各种型号的钻头、岩芯管、粘土粉等)采购计划,保证场内施工材料充足,满足施工需要。(4)现场工程技术人员及时整理编录资料和野外测试资料。(5)确保在接到业主的开工指令后,在规定的期限内开工,并按规定的期限交付成果资料。七、安全及文明施工措施(1)高压电缆距离施工钻机应大于6m。(2)钻探前,应确认地下无管线后方可开钻。(3)做好安全防火教育,工地禁烧明火,禁止使用电炉。(4)遇雷雨天气,应立即停止钻探作业,钻探人员及时躲避雷雨;(5)制定好作息时间表,禁止聚众赌博等现象的发生;(6)钻探施工人员严禁喝酒,严禁乱扔垃圾;(7)作业人员施工时必须正确穿戴和使用防护用品。八、技术服务措施我公司将自始至终为业主提供热情周到的服务。(1)钻探过程中,现场技术人员在现场钻探过程中遇到地质情况较大变化和特殊情况时,将随时与业主、设计院取得联系,会同研究。(2)现场工程技术人员及时整理编录资料和野外测试资料,保证整个工期满足业主要求。(3)在施工过程中,随时为业主、设计单位及施工单位做好技术咨询及资料解释工作,密切配合有关部门。某某大厦超前钻探方案深圳地质建设工程公司8九、其他附件部分1、超前钻探孔平面布置图2、某某大厦超前钻探孔深入岩要求3、工程钻探工作量签证单(格式)某某大厦超前钻探方案深圳地质建设工程公司9工程钻探工作量签证单(格式)附件3第页共页工程名称:某某大厦超前钻探建设单位:深圳南油华星实业有限公司序号孔号深度(m)签证人日期土层岩层总深度1\\2\\3\\4\\5\\6\\7\\8\\9\\10\\11\\12\\13\\14\\15\\16\\17\\18\\19\\20\\21\\22\\23\\24\\25\\合计\\

1 / 12
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功