水利工程施工管理报告fanli样本

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

…………………….护坡、挡土墙和土石方回填单位工程验收工程施工管理工作报告………………………..工程有限公司年月1批准:审查:校核:编写:2目录1.工程概况···································································································32.工程投标···································································································53.施工总布置、总进度和完成的主要工程量··········································84.主要施工方法·························································································125.施工质量管理·························································································186.文明施工与安全生产············································································277.价款结算与财务管理·············································································298.经验与建议·····························································································3039.附件·········································································································3141工程概况1.1地理位置及工程简介1.1.1地理位置万州区苎溪河库案综合治理工程4#地段,位于万州区北滨路长江制药厂外侧,库岸线长约800多米,东起318国道关塘口段,西至老万一桥场地中部靠苎溪河万州新大桥与天子路万开路相通。万州区苎溪河库案综合治理工程4#地段工程分为一、二两个治理阶段,高程160.3米以下工程是一期治理工程,现已基本完成。高程160.3米至177.3米段工程属二期治理项目。1.1.2主要工程项目及工程量根据施工合同的规定,*****河库案综合治理工程**地段工程内容包括:护坡、挡土墙、土石方回填施工。1.1.3完成工程量对比情况见表。完成工程量一览表序号项目单位概算工程量合同工程量实际完成工程量备注1夹石土回填万m372.8896约2堆石回填万m311约3碎石垫层m33805约4干砌条石护坡m34120约5干砌砼六棱块护坡m31586约6C20钢筋砼底板m31100约74-1排水沟的砌筑m186约84-1砖砌体保护高架桥结构m3125.9约9棱柱体的补砌m3250约1013-15段原始地貌夹石土回填万m34.5954约51.1.4工程投资及工期本单位工程计划投资总额为元,合同投资金额为按实结算,实际完成投资金额为万元。本单位计划开工日期:年月日,竣工日期:年月日,实际竣工日期:年月日。1.2气象及水文本工程所在地属亚热带季风气候,具有四季分明、雨热同季的特点。多年平均气温20℃,最高气温40℃,最低气温零下5℃;无霜期多年平均在300天左右;多年平均降雨量1169mm,最大年降雨量1408mm;多年平均日照时数达1800~2100h;最大风速达4m/s,汛期多年平均最大风速15m/s;洪水汛期为5~10月份,主汛期为7~9月份。由于本工程施工期间雨水偏多,年初汛期提前进入,给施工带来了一定的难度。引水总干渠加固工程施工期雨天统计情况见表1.2.1。表1.2.1施工期雨天统计表1.3工程地形地质1.3.1地质条件经勘察,本工程区域内属多层结构土体类型。在低山丘岗、堆积岗月份雨天年份123456789101112200920106波状平原区和冲洪积三级阶地区发育中更新的老粘性土,具有低压缩、隔水性好、强度较高的特点,地质条件较好。1.3.2天然建筑材料本工程所用砂、石料源于长江砂石料场,是优质的砼浇筑用料及垫层用料,用自卸车运至施工现场,运距为15km;水泥为万州科华水泥厂普通硅酸盐32.5水泥,用汽车运至施工现场运距为25km;块石为申明坝料场,岩石质地坚硬,是优质的护砌石料,用自卸车运至施工现场,运距为20km。1.4工程等别及特点1.4.1工程等级工程设计边坡安全等级为一级,堤防等级为4级。1.4.2工程标准建筑物房屋层数2-7层,以30KN/M2-15KN/M2计算,场地及公路荷载按《建筑结构荷载规范GB500》4.1条规定。1.4.3、工程规模。。。。。。。。。。。。。。。。。。。。。。。单位工程主要建设内容包括:(1)护岸夹石土的回填:面积约80000多m2,,填筑深度为10-15米。(2)护岸堆石回填碾压:护岸堆石回填碾压库岸线全长约800多米,填筑深度10-15米,填筑宽度14-16米。2工程投标2.1标前准备2009年6月10日,本公司接到地产开发有限公司委托司总裁发出的投标邀请书后,立即组建专门的投标机构,抽调有标书编制7经验的技术骨干组成了编标小组。2009年6月15日,本公司组织有关技术人员对施工现场进行踏勘并召开标前会,对施工现场进行全面的考察,收集所有可收集到有关本工程的资料,为编制投标文件及今后进场施工做好了充分的准备。2.2标书的编制依据(1)万州区苎溪河综合治理工程4#地段单位工程施工招标文件,施工图纸及补充函;(2)国家部委和地方有关政策法规;(3)《水利水电工程施工设计概估算定额》;(4)《水利水电建筑工程概算定额》,缺项部分套用其它行业相关定额;(5)《水利水电工程施工机械台班费定额》。2.3施工组织设计编制的原则(1)遵照招标文件中合同条款的各项要求,实质性的响应建设单位及监理单位的指令和要求的原则;(2)施工严格遵照招标文件明确的设计规范、施工规范与验收标准的原则;(3)坚持在实事求是的基础上力求先进、科学、合理、经济、实用的原则;(4)坚持自始自终的施工现场全过程严密监控,以科学的方法实行动态管理的原则;(5)采用先进的施工工艺、施工技术、制定科学施工方案的原则;(6)以标书中的各项说明为预期和行动纲领,坚持言必行、行必成的原则。2.4施工组织设计编制的依据8(1)万州区苎溪河库岸综合治理工程4#地段单位工程施工招标文件,施工图纸及补充函;(2)《水利基本建设工程验收规程试行》SD184-86;(3)《堤防工程施工质量评定与验收规程》SL239-2008;(4)《堤防工程施工规范》SL260-98;(5)《水利水电建设工程验收规程》SL223-1999;(6)《堤防工程设计规范》GB50286-98;(7)《水利水电工程测量规范》DLJ202-81、SLJ3-81;(8)《水利水电工程施工测量规范》SJ52-93;(9)《水利水电工程天然建筑材料勘察规程试行》SDJ17-78;(10)《水利水电工程施工地质规范试行》SDJ18-78;(11)《碾压式土石坝施工技术规范》SDJ213-83;(12)《水利水电工程施工组织设计规范》SDJ338-89;(13)《建筑地基处理技术规范》JGJ79-91;(14)《砌体工程施工及验收规范》GBJ501D4-66;(15)《砖石工程施工及验收规范》JBJ203-83;(16)《硅酸盐水泥、普通硅酸盐水泥》GB175-1999;(17)《混凝土拌合楼站用搅拌机》DLJT456-91;(18)《水工混凝土施工规范》SDJ207-82;(19)《预制混凝土构件质量评定标准》GBJ321-90;(20)《施工现场临时用电安全技术规范》GBJ232-82;(21)现场踏勘收集到的资料、工程特点、现场客观条件。2.5开标、中标与签订施工承包合同2009年7月4日上午9时,由万州区水利厅组织有关单位在重庆9渝强招标代理有限公司对本工程进行了公开开标。经评标委员会委员们的评审,最终推荐我公司为万州区苎溪河库岸综合治理工程4#地段单位工程中标单位,并以传真形式发出中标通知书。我公司在接到中标通知后由总经理邓小军、项目主管吕传富、项目经理罗大华强在2009年7月5日,对施工合同进行最后商定,随后签署了万州区苎溪河综合治理工程4#地段单位工程施工合同协议书与其它相关合同。3施工总布置,总进度和完成的主要工程量3.1施工总体布置3.1.1布置原则(1)科学合理地安排施工现场和各种设施,满足各项目、各工序的衔接及施工方便。(2)在业主提供的用地范围内进行合理规划,本着合理、必须的原则,尽可能减少占地。(3)油料库、危险材料仓库的布置与结构遵守国家安全防爆、防火等规范要求。(4)临时卫生设施要认真规划,污水、污物的处理要符合相关规定的要求。3.1.2水、油、电系统的布置本工程施工用水用水泵直接从苎溪河抽至施工现场的蓄水池中澄清后使用,水质优良。施工现场有排水沟,利用自流自然排水。生活用水搭接建设单位机关自来水。施工机械用油料:机油、汽油、柴油均由施工单位从万州采购运至工地。施工及生活用电均搭接建设单位机关所在地电网,共搭接1处。103.1.3混凝土搅拌系统的布置本工程混凝土主要以护坡、钢筋砼底板、4-1排水沟共1100m3。因此,混凝土搅拌系统必须布置在适合施工的部位。根据施工进度,我们安排了3个拌和站,共3台350L的拌合机,砼运输采用4台0.5m3的小翻斗车和3台农用车。3个混凝土拌合站的砂、卵石料及水泥场仓库共占地面积约500m2。施工所用材料由临时道路运至施工现场备用。3.1.4钢筋车间、木工厂、机修车间、实验室布置钢筋车间布置在项目部前面的坝顶公路下便于钢材运输和管理。木工厂布置在项目部材料仓库前的空旷地带。机修车间在项目部前空旷地带。实验室布置在项目部驻地内。3.1.5生活设施、物资机电仓库、停车场的布置项目经理部租用建设单位原职工宿舍,面积约280m2,生活区用水用电均就近接当地原有自来水管网与电网。物资机电仓库布置在项目部驻地最东面的一间。3.1.6施工道路和通讯的布置(1)对外交通万州区苎溪河综合治理工程4#地段单位工程于万州主城区南滨大道小天鹅处。本工程对外交通主要接万州南滨大道小天鹅公路,路况良好,完全能满足施工期对外交通运输的要求。(2)场内道路场内施工道路利用原渠道顶道路。为便于改善道路条件,在便道顶铺设15cm厚石渣,以确保场内材料运输等。场内交通与场外交通相互连接,形成了一个良好的内外交通网络。11(3)通讯项目经理部办公室和生活区各安装国内程控电话各一部,时刻与外界保持联系。施工现场联系采用对讲机。项目部主要人员均配备对讲机,以方便联系。3.2施工总进度3.2.1施工总进度本单位工程合同工期为:2009年7月6日至2009年12月30日。因资金不到位的影响和设计方案变更,竣工日期调整为2010年11月23日。3.2.2工程提前或推迟完成的原因本单位工程计划开工日期:2009年7月6日,合同竣工日期:2009年11月23日,实际竣工日期:2010年11月23日。各分部工程合同工期与实际工期见表3.2.1。单位或分部工程合同工期调整工期实际工期备注编号名称开工日期完工日期开工日期完工日期开工日期完工日期1堤身下部工程2009.7.62009.8.72010.7.62009.8.72堤身中部工程2009.8.72010.2.72009.8.72010.2.73堤身上部工程2010.2..72010..11..232010.2..72010..11.

1 / 36
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功