I目录绪论································································································1第1章工程概况··················································································21.1土建工程概况··············································································21.2安装工程概况··············································································21.3水文气象····················································································31.4交通运输····················································································3第2章管理总目标···············································································42.1工期目标····················································································42.2质量目标····················································································42.3安全及文明施工目标····································································4第3章施工总体部署···········································································53.1施工前的准备··············································································53.2施工部署····················································································8第4章施工技术方案··········································································104.1土建工程施工技术方案································································104.2安装部分施工技术方案································································20第5章质量保证措施··········································································255.1质量保证体系·············································································255.2质量管理···················································································255.3施工过程中的质量控制································································275.4质量通病及预防措施···································································28第6章工期保证措施··········································································316.1人员、装备保证措施···································································316.2关键工序的保证措施···································································31II6.3进度保证措施·············································································33第7章安全保证措施··········································································337.1安全保证措施·············································································337.2安全管理···················································································337.3施工过程安全技术措施································································357.4安全生产责任制··········································································36第8章雨季施工措施··········································································37第9章冬季施工措施··········································································39第10章现场文明施工措施·································································40第11章工程成品保护措施·································································41第12章竣工文件编制及工程移交·······················································45结束语·····························································································47致谢·····························································································48参考文献·····························································································49附录1施工现场平面布置图·······························································50附录2施工进度计划网络图·······························································51绪论随着我国建筑业和建筑管理体制的改革和发展,工期质量管理以及现场施工管理的要求在不断地提高,对建设项目的施工组织和各项管理都提出了新的要求。本论文根据该工程的具体情况以及施工合同、施工设计文件、国家现行的方针、政策、法规、《标准》、《规范》、《规程》、《规则》、《建设工程标准强制性条文》房屋建筑部份等;理论联系实际,一切从实际出发,本着体现施工组织的技术经济要素,对该工程的钢筋混凝土承台及上部土建工程、安装工程、室外道路、排水、排污及电缆管埋设、检查井、手井等的工期质量控制、施工方案、方法的制定以及技术管理、现场管理作出了阐述。该工程的总体部署确立了组织机构及主要管理人员,根据工程具体情况选定所需的机具设备及检验、试验器具。拟定施工平面布置,规划施工用用水、用电、临时设施。划定流水段,确定施工顺序。施工技术方案提出了定位测量、中线测量、轴线测量、高程测量具体要求和方发。模板工程中,明确模板的规格型号,对模板的安装、拆除、加固、拼缝处理作出了相关措施。对钢筋的焊接、绑扎、保护层的设置、搭接长度、以及抗震拉接筋的设置提出了相应要求。为保证混凝土的浇筑质量,明确了混凝土的浇筑方法和要点。对柱、墙混凝土和梁板混凝土以及楼梯混凝土的浇筑作出了详细的施工方法。泵送混凝土的方法也明确了具体的施工方法和要点。屋面防水工程、给排水工程、强弱电工程是工程总体质量的保证,论文中重点强调了施工顺序、施工方法、施工要点以及材料的质量要求,并强调水、电工程的试验、检验要求。为实现工程的质量目标和工期目标,论文提出了质量保证措施及工期保证措施。建立质报体系,实行质量责任制,阐述过程中质量控制的具体操作,特别对质量通病的预防作出了详细的规定。工期方面,首先要求人员、装备得到保证,利用网络进度计划,确立关键工序,制定关键工序进度保证措施。安全生产、文明施工是体现施工单位的综合水平,论文中叙述了安全保证措施文明施工的具体要求。确立安全保证体现和安全生产责任制,对重要环节作出了相关的安全技术措施。为确保工程质量、工程进度,本文论述了对雨季施工、冬季施工、成品、半成品保护的具体施工措施和防范措施。第1章工程概况银海城市花园A标段(1~3栋)位于昆明市北京路凤凰村内,西邻五华区,南临盘龙区,总建筑面积24270.54平方米。其中1栋建筑面积7585.62平方米;2栋单栋建筑面积8831.18平方米;3栋单栋建筑面积7853.74平方米,均为18+1层高层住宅,总高均为60m。建筑工程等级Ⅱ级,建筑耐久年限为一级耐久年限(>100年)。二类普通高层住宅,耐火等级二级。抗震设防烈度为八度,抗震等级为二级,全现浇抗震剪力墙结构。设计使用年限为50年。1.1土建工程概况(1)本工程采用抗震剪力墙结构,承台、地梁采用C30混凝土,一~三层混凝土抗震墙、柱采用C35混凝土,四层以上C30混凝土。梁、板、楼梯均采用C30混凝土,圈梁、构造柱、零星构件采用C20混凝土。(2)地基处理:主楼地基采用CFG桩复合地基,处理完成后主楼地基承载力特征值fspk≥490Kpa;裙楼采用天然地基,持力层为④层中砂夹粉质粘土。(3)基础形式:主楼基础采用平板式筏板基础,板厚1000mm、裙楼基础采用独立基础。(4)±0.000以下墙体采用M7.5砂浆砌MU10实心粘土砖。±0.000以上填充墙采用M5混合砂浆砌MU3.5粘土空心砖。(5)外墙采用弹性涂料,局部采用石头漆。(6)室内墙、地、顶只做基层,面层由业主自理。(7)本工程屋面防水等级为Ⅱ级,防水年限15年,防水材料为丙希酸脂防水卷材和丙烯酸脂防水涂料。(8)窗为铝合金窗,分户门为防火门,阳台门为铝合金门,内门由业主自理。1.2安装工程概况1.2.1给