1黄陵矿业集团有限责任公司2×300MW低热值资源综合利用电厂贮灰场施工组织设计编制:审核:审批:编制时间:2目录第一章编制依据及原则·············································2第1节编制依据················································2第2节编制原则·················································2第二章工程概况及地质·············································3第1节工程概况················································3第2节地质资料······································`·········4第三章施工总体部署················································6第1节施工组织管理机构······································6第2节施工原则·················································8第3节工程总目标··············································8第4节生产要素投入···········································9第四章施工准备····················································10第1节施工技术准备··········································10第2节现场准备···············································11第五章主要施工方法及技术措施·································12第1节施工测量放线··········································12第2节分部工程施工··········································13第六章质量保证措施···············································27第1节工程质量目标··········································273第2节质量控制和保障的指导原则··························27第3节机构设立···············································27第4节保证工程质量的组织措施·····························28第5节保证工程质量的技术措施·····························29第七章安全生产技术措施·········································30第1节安全生产目标··········································30第2节安全管理网络图·······································31第3节安全管理制度··········································31第4节安全生产教育··········································32第5节落实安全技术措施····································33第6节建立安全检查制度····································33第八章安全用电措施···············································33第九章文明施工措施···············································34第十章环境保护措施···············································35第十一章工期保证措施············································35第十二章雨季施工措施············································38第十三章成品保护·················································39附图:施工现场布置平面图表1施工进度计划横道图表24第一章编制依据及原则第1节编制依据1、黄陵矿业集团有限责任公司2×300MW低热值资源综合利用电厂焦沟灰场施工图及建设单位批复文件;2、建筑工程施工与验收的主要标准和规范:《施工现场临时用电安全技术规范》(JGJ46-88)《建设工程施工现场供电安全规范》(GB50194-93)《建筑机械使用安全技术规范》(JGJ33-86)《建筑工程施工项目管理规范》(GB/T50326-2001)《建筑工程文件归档整理规范》(GB/T50328-2001)《建筑施工安全检查标准》(JGJ59-99)《建筑工程施工质量验收统一标准》(GB50300-2013)《混凝土结构工程施工及验收规范》(GB50204-2002)《一般工业固体废物贮存、处置场污染控制标准》(GB18599-2001)《工程建设标准强制性条文(土建工程部分)》国家、国土资源部颁发的有关环保、水保、文保、土地、质量、合同等方面的法律法规。第2节编制原则1、单位工程合格率100%;2、严格按照设计标准,现行施工规范和质量检验评定标准;3、正确组织施工,确保工程质量合格;4、根据工期要求,抓住关键路线,合理安排施工进度,做好工序衔接,达到均衡生产,在保证工程质量、安全的前提下尽量缩短工期;5、借鉴以往类似工程施工经验,坚持科学管理、精心施工、确保高速度、高质量、高效益地完成本项工程;56、科学合理安排劳动力资源,加强内部管理,降低工程成本,提高经济效益;第二章工程概况及地质工程名称:陕西黄陵矿业集团有限责任公司2×300MW低热值资源综合利用电厂焦沟灰场工程工程地址:陕西省黄陵县双龙镇焦沟北建设单位:陕西黄陵矿业集团有限责任公司项目筹建处设计单位:陕西省电力设计院监理单位:西北电力建设工程监理有限责任公司黄陵综合利用项目监理部施工单位:陕西龙源建筑安装工程有限公司第1节工程概况本工程为黄陵矿业集团有限责任公司2×300MW低热值资源综合利用电厂焦沟灰场工程。焦沟灰场属于山谷干式贮灰场,位于焦沟北面的一条支沟内,沟断面呈V字形,沟底狭窄,沟顶开阔,沟内植被茂盛,沟长约2.5Km,与厂区相距4Km,现为二号煤矿的矸石堆场,有运矸石道路相通。电厂年产灰渣量约134万立方米,根据电厂规划灰渣综合利用率到80%,即每年进入灰场的灰渣约26.8万立方米。初期坝坝顶高程1166.0m可形成库容10万方,能容纳电厂实际排入0.35年的灰渣量。最终坝顶高程为1196.0m,可形成总库容119万立方米,能容纳电厂实际排入4年的灰渣量。贮灰场下游设档灰坝,初期坝坝体为均质碾压堆石坝,坝底高程1136.0m,坝顶高程1166.0m,坝高30.0m,坝轴线长70.4m,坝顶宽4.0m,坝坡坡比均为1:2.0.排水系统采用框架挡板式排水井-6整体式排水管,库区内设3座框架挡板式排水竖井,井身直径3m,排水管管内径为Φ1600.坝基采用岩石地基,坝基开挖至风化砂岩层,开挖深度约2.0m。坝基开挖完毕后,应及时组织勘察单位做好验槽工作,如发现新的地质问题或检验结果与勘察报告有较大出入时,应报监理工程师或通知设计单位。坝基超挖部分采用筑坝石料分层碾压回填,压实标准同坝体。初期坝坝体采用抗压强度大于30MPa,原岩风化系数大于0.80的石料。石料最大粒径应不超过压实层厚度,小雨5mm的颗粒含量不超过20%,小于0.075mm的颗粒含量不超过5%。初期坝坝体堆石料的填筑标准用孔隙率控制,孔隙率不大于30%。施工时应进行现场碾压试验,确定振动碾压机械、碾压遍数、辅料厚度等施工参数。碎石过度层采用级配连续、质地坚硬的碎石填筑,最大粒径不超过150mm,填筑孔隙率不大于20%。中粗砂垫层压实度不小于0.95.护坡干砌石应采用质地致密,耐风化的石料,其抗压强度应大于30MPa原岩风化系数应大于0.80,软化系数应大于0.80.选用的石块必须合格,要求无裂纹,中部最小厚度不小于200mm。一切按照《碾压土石坝施工规范DL5129-2001》,严格控制施工质量。拦洪坝底高程1210.00m,坝顶高程1225.00m,坝体高15m的碾压堆石坝。第2节地质资料焦沟灰场在大地构造环境中位于鄂尔多斯地台南部,在构造上属缓倾单斜构造。拟建的焦沟灰场及附近无全新活动断裂分布,灰场处于相对稳定的地块上。根据《中国地震动参数区划图》(GB18306-2001),灰场所在区7域未来50年超越概率10%的地震动峰值加速为0.05s,相应的地震基本烈度为Ⅵ度,地震动反应谱特征周期为0.45s,地震组为第三组。坝址区地层岩性主要为:第四系残坡积层、白垩系洛河组砂岩层、泥岩。地层岩性及分布特征描述如下:1层:残坡积土(Q4al+dl),黄褐色~棕红色,稍湿,可塑~硬塑,土质不均匀,混较多钙质结核、岩石碎屑等,孔隙不发育。该层土主要分布在沟谷两侧斜坡部位,披覆于砂岩层上,厚度随地形变化较大,一般层厚0.5~2m。2层:砂岩(K11),紫红~砖红色,强风化~中风化,细粒结构,块状构造,主要矿物成分以石英、长石为主,岩体节理、裂隙较发育,完整性较差。该层呈厚层和巨厚层分布,局部夹有砂质泥岩薄层。岩层强风化部分主要位于该层顶部,厚约2m。水文地质条件根据设计说明,结合已有工程地质资料,库区内由于坡面汇水作用,沟底有地表水汇流痕迹,水量不大,本次勘察期间没有发现地表水流。坝基处地下水为基岩裂隙水,赋存与洛河组砂岩层裂隙中,水量有限。主要气象条件,10m高50年一遇10min平均最大风速为26.6m/s,相应的风压为0.44kN/m2,30年一遇最低气温为-23.1℃,相应的最大风速为4.0m/s。第三章施工总体部署第1节施工组织管理机构黄陵矿业集团有限责任公司2×300MW低热值资源综合利用电厂贮灰场初期坝工程,项目经理部严格按照中华人民共和国《建设工程项目管理规范》(GB/T50326-2001)实施。按项目法管理,建立进度、安全生产、工程创优与成本控制的责、权、利相结合的管理8机制,设项目经理、副经理、技术负责人;下设工程技术部、材料物资部、计划财务部、安全文明质检部、综合办公室等“四部一室”组成的业务指挥和管理机构。组织机构框图见表2-11、项目经理部(1)综合办公室项目经理,分管生产、行政、测试、财务、调度、物资供应和生活服务等工作。(2)工程技术部技术负责人,技术员,负责工程技术、质量管理和监督工作。负责和参与施工前的技术准备,各项目的施工技术管理、各种报表项目经理综合办公室计划财务部安文质检部材料物资部工程技术部土方机械化施工队管道工程施工队砌筑工程施工队9的填写,技术资料的整理存档及施工技术报告的编写等工作。(3)材料物资部主管各种机械零配件、各种原材料和劳保用品的采购、保管和发放等。(4)计划财务部负责工程预、结算及日常财务管理工作。(5)安全文明质检部定期组织全体施工人员进行安全文明施工培训,定期和不定期检查安全文明施工规章制度及措施的执行情况,及工地安全保卫工作,以对主要工序进行质量监控。2、生产机构根据本工程的具体情况,为使各工序密切配合,提高工效,保证施工质量,成立以下生产机构。(1)土方机械化施工队该施工队主要负责本工程的土方开挖和回填及运输工