测量方案正式

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

北京华滋堂畅景园工程——四合院工程测量放线方案1目录1.编制依据·····················································12.工程概况·····················································13.测量重点·····················································24.测量准备·····················································25测量控制·····················································46.建筑物的定位测量·············································57.建筑物平面测量控制···········································68.建筑物的高程测量············································89.装修测量····················································910.竣工测量···················································1011.验收流程···················································1012.精度要求···················································1013.质量保证措施···············································1114.测量工作的管理·············································12北京华滋堂畅景园工程——四合院工程测量放线方案11、编制依据1.1图纸图纸名称出图日期北京华滋堂畅景园工程—四合院工程2012年02月1.2规范名称编号类别《工程测量规范》GB50026-93国家《建筑工程测量规程》DBJ01-21-95地方《建筑变形测量规程》JGJT8-97行业《建筑工程资料管理规程》DBJ01-51-2003地方建筑工程施工质量验收统一标准GB50300-2001国家1.3法规文件名称编号类别北京市建筑工程施工安全操作规程DBJ01-62-2002地方1.4其他文件名称备注测量放线成果通知单变更、洽商、本工程施工组织设计2.工程概况:序号项目内容1工程名称北京华滋堂畅景园工程—四合院工程2建设单位北京华滋堂古典家具有限工程3设计单位4建筑面积547.42×3=1642.26m25地理位置北京市大兴区长子营镇留民营村北6层数地上二层北京华滋堂畅景园工程——四合院工程测量放线方案27建筑层高地上部分一层5m二层4.5m9±0.000标高43.30m室内外高差1.1m10基底标高-4.6m总高度11.4m11结构形式基础钢筋混凝提框架,主体框架结构3、测量重点a.自然影响:在高空作业时,易受日照、风力、摇摆等不利因素的影响。b.建筑物变形影响:由于受到沉降、收缩以及垂直荷载压缩变形等影响,设置的测量点位会发生变化,影响测量精度。c.施工条件的影响:因施工周期长,节奏快,施工快慢不一。d.用绝对标高的影响:标高引测使用绝对标高,要考虑建筑的沉降量,势必增加许多工作量。其次是先前设置在各楼层上的标高线(点)变化亦不尽相同,要经常检查和修正。4、测量准备4.1人员的配备在项目总工程师和技术部门的领导下组成的测量组。a.测量组组长:高昆,负责制定放线方案、检查验线及协调测量与其它工种的合作,负责方案实施、控制测量、检查放线员、验线员的工作质量、资料编制,以及报验。b.放线员:李明亮,负责放线的基础性工作。c.验线员:高昆,负责验线的工作及向监理报验并协助监理验线。d.辅助工:若干名,做测量的辅助性工作。e.组织机构:测量组长:高昆验线员:马永箭北京华滋堂畅景园工程——四合院工程测量放线方案34.2.人员培训施工前,由项目总工组织项目技术工程师、测量人员认真仔细学习测量规范、规程,熟悉各种位置测、测设方法。同时,由技术负责人进行测量交底,明确测量要求。测量作业要求如下:★严格执行审核原始数据的正确性,坚持测量工作步步校合,坚持自检、互检、交接检的制度,合格后由技术工程师进行审定。★遵循“从整体到局部”、“先控制后碎部”、“高精度控制低精度”的工作程序;★测量记录要及时,数字正确、内容完整、字体工整、清楚、原始依据正确;★测量计算的几本要求:依据准确、计算有序、方法科学、步步校核、结果可靠,记录中数字的位数反映观测的精度,如水准读数至毫米;★测量结果现场标识要统一、明确、确保不让施工现场任何人误解;★测量人员必须明确为工程服务的目的,对按图施工和工程进度负责。工作中必须精密配合施工,发扬团结协作、认真负责的工作作风。测量人员必须要虚心学习、及时总结经验,发扬开创进取的创新精神。4.3仪器的准备仪器名称型号及精度数量用途经纬仪DT-2,±2″1台轴线投测、细部尺寸线放线员:李明亮测量辅助工北京华滋堂畅景园工程——四合院工程测量放线方案4水准仪DSC320,±0.4mm2台高程控制测量、楼层水平测量钢尺50米1轴线定位塔尺5米1高程测量钢尺5米4细部尺寸线备注:以上所有仪器必须有合格证书和检定证书,本工程施工中测量仪器必须及时送检和复检保证仪器在有效期内使用。4.4技术准备1.图纸学习与校核全面了解设计意图,认真熟悉图纸。首先审核总平面图,校对点位坐标、距离是否对应,定位依据、定位条件是否明确合理,建筑物的几何位置关系是否符合要求和满足规划用地的要求;其次审核建筑、结构、设备施工图,主要校和——平、立、剖面图是否对应一致,轴线间距、高程、结构尺寸和装修细部尺寸是否相符。2.组织有关技术人员学习图纸和测量规范。依据施工总平面图绘制楼座的工程定位图和高程控制点布置图。3.根据甲方提供的高程控制点设置楼座的标高控制点。5、测量控制5.1校核红线桩和水准点5.1.1定位条件:依据北京道济测绘有限公司出具的测量成果。根据图纸设计坐标,用全站仪实测各边边长、各点的左夹角及坐标,用实测值与提供值比较,对上述给出的坐标进行复测核实,确定楼房角点坐标。实测误差:角度在±2″、边长在1/15000、点位相对误差在15mm以内,为允许误差范围内。根据此桩点,测出楼的主轴线,组成平面控制网,施测时将主轴线控制桩引测至基槽5米外的木桩上,经校核无误后把木桩用砼筑牢,加以保护,以供施测使用。5.1.2根据甲方提供的引入现场的高程点,进行引侧。引测施工现场,经过反复测量、校核。在现场内设定了三个施工临时北京华滋堂畅景园工程——四合院工程测量放线方案5水准点LA1=23.58、LA2=23.593。临时水准点要设置永久不下沉的建筑物上,满足施工测量要求。临时水准点闭合差小于等于3㎜,作好标记,报监理验收合格后,作为本本工程施工的高程网和后续施工的引测依据。5.1.3定位依据:建筑圆心点及水准点准确可靠,做好资料成果与现场桩位交接,并砌砖垛保护桩位。永久桩位作法为:利用(100×50×1000)毫米的木桩打入地下约0.8米,四周用红砖砌成(500×500×500)毫米的方孔,内注混凝土,并用铁钉定出控制点坐标位置,红油漆画“▼”表示。永久高程控制桩采用砌砖井,上加混凝土盖板进行保护,防止磕碰及坠物。永久坐标控制桩和高程控制桩四周用钢管围挡,加以保护,如图:5.2施工测量控制网的建立5.2.1场区平面控制网布设原则(1)平面控制应先从整体考虑,遵循先整体、后局部,高精度控制低精度的原则;(2)布设平面控制网形首先根据设计总平面图,现场施工平面布置图,基础及首层平面布置图中的关键部位;(3)选点应选在通视条件良好、安全、易保护的地方;(4)桩位必须用混凝土保护,需要时用钢管进行围护,并用红油漆作好测量标记。6、建筑物的定位测量6.1轴线控制由总平面位置图和首层平面图决定,现场甲方给出了定位点,见下图。永久桩位示意图北京华滋堂畅景园工程——四合院工程测量放线方案6轴线控制桩引测到开挖上口的桩梁上,弹好墨线。再用钢尺配合电子经纬仪通过距离和转角复测定位测量中的轴线控制点:测角误差在±2″;边长相对中误差在1/25000;点位相对误差在10mm范围内,即检核无误。6.2±0.000控制本工程标高为±0.000=25米,水准点的高程控制网校测合格后,将±0.000标高引到四周建筑物、围墙上,不得少于3个点,用红漆做出明显标识,闭合误差精度达到±2mm,并使各点能够互相通视和联测。再根据施工部署的需要加密,建立高程控制网。7、建筑物平面测量控制7.1基础部分测量7.1.1基础轴线投测基础施工时,采用通视法用经纬仪直接将主控轴线引到基槽内,并依据主控轴线测设细部轴线,如下图所示:两点通视法将控制轴投到基础底板施工层上,将电子经纬仪架在底板上观测其他轴线控制桩,当误差在±5mm内,投测出基底的所有轴线,再用50米钢尺将所有的施工线放出。钢筋投测:为了保证柱、墙插筋及位置准确,在底板钢筋绑扎完后,把轴线投测到底板钢筋上铁网片上,经闭合小和、校核后,把细部线标出,并用红油漆做出明显标志。7.1±0.000校核轴线检核控制轴线及首层的轴线,用经纬仪以控制点为起始点校测,角度误差在±2″;边长相对误差在±10mm范围内。北京华滋堂畅景园工程——四合院工程测量放线方案77.2主体轴线投测校合轴线:检核控制轴线及首层的轴线,用全站仪以控制点为起始点校测,角度误差在±2″;边长相对误差在±3mm范围内。a.本工程采用内控法。首层放线后,根据施工部署,使用经纬仪在每个流水段两端轴线上分别建立口字的4个内控点(结构施工前预埋,其位置距四角轴线500mm左右)。顶板砼浇筑后,在首层的内控点用垂准仪向上投测控制线,并组成闭合图形,使用全站仪校核其尺寸。所投测的控制线校核合格后作为平面放线的依据。激光铅垂仪安放在平台上,对中整平后向上投射垂直激光束。见内控制点设置图:顶板上附筋顶板上附筋钢筋(与上筋焊接)焊接焊接内控点设置图每层顶板垂直投测点处预留200×200mm测量洞,在作业面上用光靶接收确定主控点,并在孔边划出十字线标记出激光接收点。见图:北京华滋堂畅景园工程——四合院工程测量放线方案8垂直预留孔设置图砼顶板满堂红脚手架光靶激光铅直仪砼顶板满堂红脚手架光靶激光铅直仪300300透明塑料板同心圆间隔5mm激光接收靶7.4垂准测量方法和要求观测时间选择有利时间如清晨和阴天等。使用垂准仪,精度1:10000(仪器旋转180°对径时二次之差)。测量时仪器旋转四个方向一测回测定,指使上面标志中心移至十丝交点为止,然后固定标板。8、建筑物的高程测量8.1基础高程传递针对本工程实际特点,采用悬吊钢尺法进行高程的传递。在护坡散水和基槽底分别架一台自动安平水准仪,在地面上架的水准仪后视±0.000控制点,前视悬吊的钢尺,通过±0.000的钢尺读数计算出-5.000米处的钢尺读数,再通过基底仪器将这些读数引测到护坡散水上,在护坡散水上各钉四、五处-4.400米的高程控制桩。根据施工需要在每次浇筑混凝土之前,使用水准仪把散水上的高程控制桩进行校核,然后将散水上的高程桩与该层的建筑50cm线换算高差后抄平,在钢筋上用油漆涂红,待拆模后,及时将建筑50cm线抄测在墙柱上,复查后作为基础高程控制线。北京华滋堂畅景园工程——四合院工程测量放线方案98.2主体标高控制采用“控制总高,从首层传递”的方法,即在首层从现场±0.000点引测到现浇柱、剪力墙上,在根据±0.000推算出首层50cm线,周圈抄测50cm控制线,闭合误差±2mm。楼层传递采用50米钢尺从外墙的首层传递,每次引测均从首层+50线往上引测,以避免各层传递产生的累计误差。高程引测点每段四

1 / 15
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功