项目型号单位数量单价费用备注梁场用地租赁元120000002000000土地占用补偿费及复垦费水电接入费元11000001000002100000电力改移元1250000250000250000预制台座C20m³226.88018144制梁台座扩大基础C20m³187.98015032存梁台座C20m³70.8805664存梁台座扩大基础C20m³467.78037416龙门吊轨道C20m³4958039600场地硬化钢筋加工区C20m³127.5607650场地硬化预制区C20m³415.66024936路面C20m³325.56019530HRB400钢筋Φ12t34.8342014628.6182600.6P38钢轨t34.23400116280台座钢板40*40*6mmt364500162000角钢6mmt5.2300015600混凝土C202316.8310718208砖渣15000HRB400钢筋Φ12t34.83280097524施工队板房㎡58013075400项目部驻地板房㎡28022061600钢筋棚㎡33015049500五金及其他300001341112龙门吊100t元/组1800000800000龙门吊10t元/组12600002600001060000后八轮2000020000农用车1000010000挖机2000020000压路机1600016000推土机1500015000铲车1000010000910005024713注:不含备用梁场购买含税场地平整物资部提供合计合计总合计场地租赁电力改移基础建设材料费设备费机械费梁场基础建设成本估算合计合计合计购买及转运费用合计队伍工费