屋面工程施工方案第0页目录一、编制依据·······························11.1.施工图纸及施工组织设计······················11.2.标准、规范、规程及其他······················1二、施工部位的工程概况··························12.1.建筑与结构设计概况························12.2.施工特点、重点与难点·······················2三、施工准备·······························23.1.技术准备·····························23.2.材料及机具准备··························2四、施工安排·······························24.1施工顺序安排···························34.2人员、时间安排··························3五、主要施工方法及工艺··························45.1工艺流程·····························45.2作业条件·····························45.3防水层施工····························45.4找坡层施工····························85.5找平层施工····························95.6保温层施工···························105.7过滤层施工···························125.8屋面细部做法··························14六、质量标准······························206.1主控项目····························206.2一般项目····························206.3允许偏差项目··························21七、成品保护······························21八、安全、环保措施···························218.1安全要求····························218.2环保要求····························22九、成本节约措施····························23屋面工程施工方案第1页一、编制依据1.1.施工图纸及施工组织设计施工图纸星星广场项目(四期)工程施工图纸施工组织设计《星星广场项目(四期)项目施工组织设计》1.2.标准、规范、规程及其他序号施工规范、规程名称编号1《屋面工程质量验收规范》GB50207-20122《混凝土结构工程施工质量验收规范》GB50204-20023《建筑工程施工质量验收统一标准》GB50300-20014《屋面工程技术规范》GB50345-20125《种植屋面》05ZJ2036《种植屋面工程技术规程》JGJ155—2013注:施工过程中如遇到国家规范、图集、标准更改,则工程要求也随之相应更改,按照新标准执行。二、施工部位的工程概况2.1.建筑与结构设计概况本工程屋面包括17#、18#、19#、20#、21#、22#楼的主楼屋面、电梯机房屋面和车库植被屋面等,女儿墙高度依次为1500mm、3000mm。屋面保温层选用35厚挤塑聚苯板,防水等级为Ⅰ级,防水材料采用高聚物改性沥青防水卷材。屋面排水采取有组织排水方式。主要施工做法如下:倒置式保温隔热Ⅰ级防水屋面面层8~10厚浅色防滑地砖铺实拍平,1:1水泥砂浆擦缝25厚1:4干硬性水泥砂浆,面上撒素水泥面层40厚C25细石防水混凝土内配Φ6@200双向筋,面压光保温层35厚挤塑型聚苯乙烯泡沫塑料板隔离层干铺聚酯纤维无纺布一层防水层3厚高聚物改性沥青防水卷材处理剂刷基层处理剂一道屋面工程施工方案第2页找平层20厚1:3水泥砂浆找平找坡层20厚(最薄处)1:8水泥憎水膨胀珍珠岩找坡层,坡度2%结构层钢筋混凝土屋面板2.2.施工特点、重点与难点2.2.1本工程于2015年7月底主体结构封顶,屋面工程施工在主体结构验收通过后开始,定于2015年12月底开始施工。2.2.2施工时应注意屋面坡度及坡向,以免影响屋面排水效果。2.2.3基层与突出屋面结构(女儿墙、墙、变形缝、天沟、排风道出屋面口等)的转角处,均先用水泥砂浆做成圆弧,再将柔性防水向上翘起规范规定高度。三、施工准备3.1.技术准备3.1.1技术人员应对设计图纸进行认真的审核,明确各部位的节点做法,如发现图纸中有不明确事项,在施工前向设计人员提出,由设计人员进行确定。3.1.2根据工程的特点、质量要求、工期要求、现场要求等,制定出详细的屋面工程施工方案,进行合理的施工安排,确保质量、进度、成本、现场等各项指标的顺利实现。3.1.3施工前向施工队进行详细的交底,使其明确各部位的施工做法、操作工艺、施工要求等。3.2.材料及机具准备在正式开始施工前完成施工材料的进场验收并进行复试工作,并由项目部技术负责人与施工班组签订施工技术交底,确保各种人员、机具、材料按时、按量、按质进行供应。在开始施工前,技术室向供应方提供一份材料需求计划表,明确各期间的供应数量和供应要求等。本工程屋面分项工程各主要材料用量如下:主要材料工程量统计表序号名称规格主要技术要求数量备注1挤塑聚苯板35mm厚密度:27~30kg/m3735m3保温层2泡沫混凝土840m3找坡层3水泥砂浆P.042.572m3找平层4高聚物改性沥青防水卷材3mm3600m2防水层5手推车5辆材料运输四、施工安排屋面工程施工方案第3页4.1施工顺序安排根据施工现场情况,按照由西向东施工的顺序进行屋面作业。具体如下:17#楼主体屋面施工→18#楼主体屋面施工→19#楼主体屋面施工→20#楼主体屋面施工→21#楼主体屋面施工→22#楼主体屋面施工。4.2人员、时间安排4.2.1组织机构组长:黄向荣副组长:梁建民姜福泉组员:梁春财阮连堂付俊辉邓凤成饶春华张才安何文杰郑海明侯存哲4.2.2人员分工黄向荣现场总负责梁建民现场技术总负责,各专业之间协调姜福泉各施工队伍的进场安排,现场管理等协议的签定;施工队伍的进场教育和现场的各种教育;现场进度、人员安排,各施工队伍之间调度协调梁建民施工方案的编制,技术交底的编制,技术指导以及与其它专业之间的技术配合,施工质量控制侯存哲相关隐检资料的填写,参与材料的进场检验侯存哲根据技术交底的要求对现场的施工进行质量检查、监督,相关质量资料的收集整理,负责向监理报验,针对现场的质量问题及时下发质量问题整改通知,并跟踪督促、检查侯存哲根据技术要求,对进场需要进行复试的材料委托试验室进行检验,并负责相关资料的收集整理张才安根据技术要求,对现场的找坡标高进行控制梁春财根据屋面工程的进度计划,进行现场工作的安排、协调和现场文明施工管理;参与材料的进场检验何文杰现场安全负责及相关内业资料和动火证的发放检查侯存哲组织相关材料的进场,钢管等周转材料的进退场,参与材料的检查验收,并负责厂家资料的收集整理屋面工程施工方案第4页4.2.3劳动力计划4.2.3.1装修队伍:负责保温层、找坡层、找平层、防水保护层的施工。4.2.3.2防水队伍:负责防水施工以及蓄水试验。4.2.3.3保温队伍:负责保温的施工,并根据总进度计划分段进行施工。4.2.3.4施工工期计划:屋面施工根据实体施工进度进行,找坡材料必须提前一周进场,其余各种材料按施工进度分别进场,屋面施工计划于主体结构验收完成后开始施工,即5月底开始进行施工,先施工基层处理保温层、找坡、找平层,在外墙保温完成拆除吊篮后进行防水及广场砖铺贴施工。五、主要施工方法及工艺5.1工艺流程5.1.1普通屋面工艺流程施工准备→基层处理及出屋面管根等处理→找坡层及找平层施工→防水层施工→保温层施工→附加层施工→防水层施工→保护层施工5.2作业条件5.2.1顶层结构施工完,现浇女儿墙已浇筑完毕,砌筑女儿墙已砌筑完成。屋面杂物处理完毕。5.2.2水电管出屋面部分、烟风道、透气管道已施工完毕。5.2.3屋面内排雨水斗已安装完毕。5.2.4穿结构的管根用膨胀细石混凝土塞堵密实。5.2.5提前对进场的各种材料进行复试和有见证取样。5.3防水层施工5.3.1材料要求5.3.1.1所使用的防水材料必须有出厂合格证及相关部门颁发的防水材料使用认证书,材料必须符合设计要求,材料进场后必须按规定进行现场取样复试,复试合格后方准使用。5.3.1.2卷材:SBS高聚物改性沥青防水卷材,两层做法,卷材的各项性能及外观质量应符合以下要求:屋面工程施工方案第5页高聚物改性沥青防水卷材物理性能高聚物改性沥青防水卷材外观质量项目质量要求孔洞、缺边、裂口不允许边缘不整齐不超过10mm胎体露白、未浸透不允许纤维布材料粒度、颜色均匀每卷卷材的接头不超过1处,较短的一段不应小于1000mm,接头处应加长150mm5.3.1.3材料的贮存、保管:卷材应贮存在阴凉通风的室内,避免雨淋、日晒和受潮,严禁接近火源,贮存环境温度不得高于45摄氏度,应直立堆放,堆放高度不超过两层,并不得倾斜或横压,避免与化学介质及有机溶剂等有害物接触。5.3.1.4配套材料a)基层处理剂:采用冷底子油。b)接缝密封材料:采用改性沥青密封材料,用于立面防水卷材收头密封及外墙管根等特殊部位的粘结处理,密封材料的各项性能应符合下表的要求。改性沥青密封材料物理性能项目指标拉伸粘结性不小于125mm耐热度80℃,5h下垂值不大于4mm柔性-10℃无裂纹施工缝宽度25mm5.3.2作业条件5.3.2.1防水卷材合格证、准用证、检验报告、复试报告齐全,材料现场见证取样送屋面工程施工方案第6页检合格。防水施工单位资质齐备,现场管理人员和操作人员持证上岗,施工人员操作时要穿工作服,软底鞋并带手套。5.3.2.2施工前对施工队伍进行技术、安全等交底。5.3.2.3防水卷材和配套材料均为易燃材料,集中存放,有专人管理,并准备好干粉灭火器,严防火灾发生。5.3.2.41:3水泥砂浆找平层施工完毕,并经养护后干燥、平整、牢固,无空鼓开裂、不起砂。5.3.2.5屋面女儿墙、烟风道出屋面及水箱间外墙作好泛水,阴阳角处抹成半径50mm的圆弧形。5.3.2.6涂冷底子油前,将基层表面浮灰、垃圾等其它杂物清理干净。5.3.2.7电梯间、楼梯间屋面等高处屋面排水的水落口已安装完成。5.3.3施工工艺5.3.3.1工艺流程:基层清理→涂刷基层处理剂→附加层→卷材铺贴→卷材收头粘结→卷材接头密封→蓄水试验5.3.3.2基层清理:涂刷冷底子油前,仔细将基层表面的垃圾、尘土等清除干净,必要时可采用喷灯局部喷烤,但喷烤时间不宜过长,防止爆裂、起砂。5.3.3.3基层含水率检测:剪一块1m²的卷材平铺于基层表面,静置3-4小时,然后揭开卷材观察其下方基层面及防水卷材,如未见水印,即可铺设防水层。5.3.3.4涂刷基层处理剂:在基层表面满刷一遍冷底子油,底油的施工也按先高后低、先远后近、先立面后平面的顺序进行。同一屋面上先涂刷排水较集中的水落口、天沟、檐口等节点,再进行大面积的涂布。屋面转角及立面的涂刷层应薄涂多遍,不得有流淌和堆积现象。涂刷要均匀、不透底、遮盖率100%,底油总厚度不得小于3mm。在底油实干前,不得在防水层上进行其它施工作业,不得上人和堆放物品。5.3.3.5铺贴附加层:屋面女儿墙、排风道出屋面、水箱间、楼梯间(电梯间)外墙根部、阴阳角部位加铺一层同质卷材附加层,将卷材裁成相应的形状进行热熔满贴,宽度500mm,附加层施工必须粘贴牢固。水落斗周围与屋面交接处,应做密封处理,并加铺两层附加层,附加层深入水落斗的深度不得小于100mm。