1目录一、工程概况:········································································2二、编制依据:·········································································2三、施工准备···········································································3四、施工方法···········································································3五、混凝土试块的取样·······························································7六、成品保护···········································································8七、应注意的质量问题·······························································8八、砼缺陷的处理方法·······························································9九、质量保证措施及季节性施工措施·············································9十、文明施工及环保措施···························································11十一、职业健康及安全保证························································122混凝土工程施工方案一、工程概况:本工程为嘉和国际城一期工程,本工程位于二环北路与民主北路交叉口东南侧,建设规模(总建筑面积)130887.12㎡,其中:2#、3#楼剪力墙结构地上32层,建筑面积17442.38㎡;4#、5#楼剪力墙结构地上33层,建筑面积14183.66㎡;6#、7#、8#楼剪力墙结构地上31层,建筑面积49635.94㎡,幼儿园框架结构地上3层,建筑面积1013㎡;地下室1层,建筑面积16986.1㎡。基础结构为C30桩基础,上部结构类别为框剪结构。建筑使用年限50年,抗震七度,安全等级为二级,耐火等级为二级,防水等级Ⅱ级,属于二类民用建筑。施工主要概况如下:1、混凝土:本工程全部采用自拌砼;2、混凝土标号:桩身强度等级均为C30,承台混凝土的强度等级为C30.基础垫层为C15,基础(含承台、基础梁)底部垫层厚度为100mm,每边扩出基础边缘100mm。地下室地基梁、承台、底板、地下室外墙混凝土的强度等级均为C30,抗渗等级为P6(0.6MPa)。地下室消防水池池壁的混凝土强度等级为C30,抗渗等级为P6(0.6MPa)。地下室内墙、外扩地下室框架柱强度等级为C45。地下室顶盖梁、板混凝土强度等级为C35,抗渗等级为P6(0.6MPa)。上部结构:框架柱:一层~十一层框架柱混凝土强度等级为C45.十二层~十六层剪力墙混凝土强度等级为C40,十六层以上为C30砼;梁板:-1层至四层梁板等级为C30,四层以上砼的强度等级为C25。二、编制依据:《混凝土工程施工及验收规范》(GB50204-2002)《砼质量控制标准》GB50164-923《砼强度检验评定标准》GBJ107-87《建筑工程施工质量验收统一标准》GB50300-2001《混凝土泵送施工技术规程》JGJ/T10-95《建筑机械使用安全技术规程》JGJ33-2001本工程的《施工组织设计》三、施工准备(一)技术准备1、拟浇筑层段的模板、钢筋、预埋件及管线等全部安装完毕,经检查符合设计要求,并办完隐蔽预检手续。2、浇筑用架子及马道已支搭完毕,并经检查合格。3、工长对操作班组已进行全面施工技术、安全交底,砼配合申请单、浇筑申请书已被批准。(二)材料与机具准备1、混凝土,泵送。2、施工用水用电已铺(架)设完毕。3、平板振动器、ZW—50插式振动器,经检查、机况正常。4、防雨的覆盖材料及保养的覆盖材料已准备完毕。(三)劳动力准备施工人数根据施工进度计划与实际情况,由施工员合理安排。四、施工方法(一)、工艺流程作业准备砼泵送柱、梁、板、楼梯砼的浇筑与振捣砼的养护(二)、作业准备:浇筑前要先清模,即将模板内的垃圾,尘土等杂物及钢筋上的油污,砼碎块清除干净,并检验钢筋的水泥砂浆垫块是否垫好。检验脱4模剂是否已涂刷完毕。(三)、砼的浇筑与振捣1、砼浇筑与振捣的一般要求(1)砼自吊斗口下落的自由倾落高度不得超过2m,否则采取串桶(或溜槽)。(2)浇筑梁板砼时要由远而近分段分层连续进行,浇筑层高度根据结构特点,钢筋疏密决定。(3)使用插入式振捣器要快插慢拔,插点要均匀排列,逐点移动顺序进行不得遗漏,做到均匀振实。移到间距为500mm左右。平板振动器的移动间距,要保证振动器的平板覆盖已振实部分的边缘。砼振捣时间以砼表面泛浆且不下沉为止。(4)浇筑砼连续进行,如必须间歇,应在前层砼初凝之前,将次层砼浇筑完毕,间歇的最长时间按所用水泥品种、气温条件、砼凝结条件而定,一般要求超过2小时按施工缝处理。(5)浇筑砼时经常观察模板、钢筋、预留孔洞、预埋件和插铁等有无移动、变形或堵塞等情况,如果发现问题应立即处理,并在已浇筑砼凝结前处理完毕。2、柱砼浇筑(1)柱浇筑前底部先填5-10cm厚与砼配合比的减石子砂浆,柱砼分层浇筑,分层振捣,使用插入式振捣器时每层厚度不大于50cm,振捣时注意振捣棒不得触动钢筋和预埋件,在上面振捣的同时下面设人随时敲打模板。(2)柱子砼应一次浇筑完毕。(3)砼浇筑完成后,随时将伸出的搭接钢筋整理到位。3、梁板砼浇筑(1)梁、板砼同时浇筑,由一端开始用“赶浆法”,即先浇梁,根据梁高分层浇筑成阶梯形,当达到板底位置时再与板的砼一起浇筑。随阶梯的不断延5伸,梁板砼浇筑连续向前进行。(2)当梁柱节点钢筋较密时,用φ30振捣棒振捣。(3)楼板砼的虚铺厚度要略大于板厚,用平板振捣器垂直浇筑方向来回振捣,振捣完毕后用长木抹子抹平,施工缝处有预埋件及插筋处用木抹子找平。(4)浇筑梁板混凝土时,先浇筑到板顶,停滞30分钟后,再浇筑梁混凝土。(5)梁、板混凝土采取分段浇筑,梁、板混凝土的接槎留置在楼板跨中三分之二处,用快易网封堵,混凝土终凝后及时凿毛(如下图,图中密目钢丝网改为快易网)。浇筑混凝土前楼板施工缝处理楼板混凝土上表面楼板钢筋密目钢丝网直径12钢筋挡在外面,间距400(6)采用专用钢筋马凳上铺脚手板作为浇筑马道,以防钢筋被踩变形。(7)梁板同时浇筑,浇筑的方法由一端开始下灰,振捣手密切配合,用“赶浆法”保持混凝土沿梁底向前推进。(8)根据梁高分层浇筑,当达到板顶部位后与梁一起浇筑。(9)标高控制:水准仪抄平,用白色胶带纸粘贴或用红铅笔标志在墙柱钢筋上,拉线控制,刮杠找平标高。(10)振捣采用振捣棒和平板振捣器相配合,振捣器快插慢拨,插点均匀。(11)板面采用平板振捣器,随振捣随抹平,抹好处禁止上人踩踏。4、墙柱与楼板交接砼标号不同时的浇筑方法及注意事项6(1)当柱(剪力墙)混凝土强度等级高于梁板混凝土强度等级时,梁柱节点处应按柱(剪力墙)混凝土的强度等级浇捣。此时,应先浇筑柱的高等级混凝土,然后在混凝土初凝前再浇筑梁板的低等级砼,并加强砼的振捣和养护。也可以同时浇捣,但应特别注意,不应使低等级的混凝土扩散到高等级混凝土的结构部位中去,以确保高强混凝土质量。另外,当柱、梁的混凝土强度等级相差不高于5MP时,可不做处理。梁板混凝土浇筑时,外墙、柱混凝土与梁板混凝土强度不同,先按图示(下图)浇筑墙、柱混凝土,再浇筑梁、板混凝土。梁板混凝土柱混凝土hhh梁柱接头不同标号砼浇筑45°(2)梁柱节点钢筋较密,用Φ30的小振动棒振捣,并准备一些小钢钎人工辅助振捣。5、楼梯砼浇筑(1)楼梯段砼需自下而上进行浇筑,先振实底板砼,达到踏步位置时再与踏步砼一起浇筑,不断向上推进,并随时用木抹子将踏步上表面抹平。6、施工缝的留置位置(1)柱顶:留在梁底向下20mm处。(2)顶板:以后浇带、伸缩缝作为流水段划分界限。7(3)楼梯:留在休息平台1/3处。7、施工缝的处理要求楼梯与二次结构同步施工,凡与主体结构相连接,相依托的部位,主体施工时包筋,楼梯施工时界面按施工缝处理。施工缝的处理:施工缝砼表面凿毛,剔除浮浆及松动石子,并用水冲洗干净后,先浇一层同配比无石子砂浆,然后继续浇砼,振实密实,使新旧砼紧密结合。8、大梁砼浇捣注意事项先浇捣一半的大梁砼,振捣好,待大梁砼初凝前再浇捣另一半的砼。9、砼的养护砼浇筑完毕后,在12h以内对混凝土用草帘或麻袋加以覆盖和浇水,浇水次数要能保持砼处于湿闰状态,对采用硅酸盐水泥、普通硅酸盐水泥或或矿渣硅酸盐水泥拌制的混凝土,不得少于7d;对掺用缓凝型处加剂或有抗渗要求的混凝土,不得少于14d。雨天浇筑砼后,应采用塑料布覆盖养护,其敞露的全部表面应覆盖严密,并应保持塑料布内有凝结水;常温施工期间,按每次浇筑砼量留够养护试块。顶板、梁砼留置不少于二组同条件养护试块,分别用于检测砼强度达设计强度75%、100%的时间,为顶板、梁拆模提供依据。五、混凝土试块的取样混凝土抗压强度,应以边长为150mm立方体试件,在温度为20±3℃和相对湿度为90%以上的潮湿环境或水中的标准条件下,经28天养护后试验定。(标养由试验室完成)结构混凝土的强度等级必须符合设计要求。用于检查结构构件混凝土强度的试件,应在混凝土的浇筑地点随机抽取。取样与试件留置应符合下列规定:1、每拌制100盘且不超过100m3³的同配合比的混凝土,取样不得少于一次;82、每工作班拌制的同一配合比的混凝土不足100盘时,取样不得少于一次;3、当一次连续浇筑超过1000m3时,同一配合比的混凝土每200m3取样不得少于一次;4、每一楼层、同一配合比的混凝土,取样不得少于一次;5、每次取样应至少留置一组标准养护试件,同条件养护试件的留置组数应根据实际需要确定。6、对于抗渗砼,连续浇筑砼工程量500m3以下的,应留置两组(12块)混凝土抗渗试块。每增加250~500m3时,应增加两组(12块)。抗渗试块其中一组(6块)应在“标准养护”室中养护,另一组(6块)与现场同条件养护,养护期不得少于28天。六、成品保护要保证钢筋和垫块的位置正确,不得踩楼板、楼梯的弯起钢筋,不碰动预埋铁及插筋。不可用重物冲击模板,不在梁或楼梯踏步模板吊帮上蹬踩,应搭设跳板,保护模板的牢固和严密。已浇筑楼板、楼梯踏步的上表面砼要加以保护,必须在砼强度达到1.2Mpa以后,方准在面上进行操作及安装结构用的支架和模板。七、应注意的质量问题1、蜂窝:主要原因是砼一次浇筑过厚,振捣不实或是漏振,模板有缝隙使水泥浆流失,钢筋较密而砼坍落度过小或石子过大,柱根部模板有缝隙,以致砼中的砂浆从下部涌出而造成此现象。2、露筋:原因是钢筋垫块位移或间距过大,钢筋与模板粘贴,梁板底部振捣不实处出现露筋。3、麻面:拆模过早或模板表面没有涂刷隔离剂,或其表面湿润不够,构件9表面砼易粘附在模板上造成麻面脱皮现象。4、孔洞:振捣不够细致,使钢筋较密处砼被卡住,而后又继续浇筑造成此现象。5、缝隙或夹渣:模内清理不净或未浇底浆造成此现象,因此浇筑前一定要检查模内清理情况。八、砼缺陷的处理方法蜂窝:对于小蜂窝,用水洗刷干净后,用1:2或1:2.5水泥砂浆压实抹平。对较大蜂窝,先凿去蜂窝处薄弱松散的混凝土和突出的颗粒,刷洗干净后支模,用高一强度等级的细石混凝土仔细强力填塞捣实,并认真养护。露筋:对于表面露筋,用水洗刷干净后,用1:2或1:2.5水泥砂浆将露筋部位抹平平整,并认真养护。如露筋较深,应将薄弱混凝土和突出的颗粒凿去,洗刷