海光大厦(华东电网调度中心大楼)工程一柱一桩施工专项调整方案上海市第二建筑有限公司1海光大厦(华东电网调度中心大楼)工程一柱一桩施工专项方案上海市第二建筑有限公司海光大厦(华东电网调度中心大楼)工程项目管理部2008年11月海光大厦(华东电网调度中心大楼)工程一柱一桩施工专项调整方案上海市第二建筑有限公司2目录第一章、工程概况................................................................................................11.1概述..........................................................................................................11.2场地条件..................................................................................................11.3地质情况..................................................................................................11.4周边环境..................................................................................................11.5工程施工特点..........................................................................................21.6相关单位..................................................................................................21.7编制依据..................................................................................................2第二章、施工总平面布置图................................................................................42.1临时布置要求.........................................................................................42.2临设布置..................................................................................................42.3用电、用水布置.....................................................................................42.4照明布置.................................................................................................4第三章、施工方案................................................................................................53.1施工前期准备..........................................................................................53.2施工流程安排..........................................................................................53.3钢立柱的加工制作..................................................................................73.4施工工艺和施工方法............................................................................103.5主要施工设备及器具的配置计划........................................................193.6劳动力配备计划....................................................................................203.7用水、用电计划....................................................................................20第四章、施工进度计划......................................................................................21第五章、质量保证措施......................................................................................215.1工程技术复核计划...............................................................................215.2原材料钢筋复试计划...........................................................................215.3混凝土试块制作计划...........................................................................215.4隐蔽工程验收计划...............................................................................21海光大厦(华东电网调度中心大楼)工程一柱一桩施工专项调整方案上海市第二建筑有限公司35.5质量管理措施.......................................................................................225.6质量标准控制........................................................................................22第六章、安全技术措施......................................................................................256.1一般规定................................................................................................256.2汽车起重机...........................................................................................26第七章附件........................................................................................................287.1附件一....................................................................................................287.2附件二………………………………………………………………29第八章附图1、一柱一桩施工平面布置图2、定位架详图3、校准架详图海光大厦(华东电网调度中心大楼)工程一柱一桩施工专项调整方案上海市第二建筑有限公司1第一章、工程概况1.1概述本工程位于浦东新区的浦东南路882号,东昌路与商城路之间;拟建物总高度为128.7米,总建筑面积为69558.92m2,其中地上共28层、裙楼5层、地下共4层,采用半逆作法施工。本基坑大小为97.1×55.1m2,基坑周边围护体采用1米厚地下连续墙,普遍区域开挖深度为17.7米;局部落深区最大挖深23.2米;本工程围护钻孔灌注桩:共分为钢管立柱及格构柱两大类,其中钢管立柱桩计42根、格构柱计40根;依据02A、03A、04#施工图,桩信息汇总见附表一。本方案是针对一柱一桩及格构柱桩而编制的专项施工方案,对于一般钻孔灌注桩的施工工艺、技术质量措施及末尽事宜详见主体钻孔灌注专项施工方案。1.2场地条件拟建场地的东北面为世界广场,南面是东园三村的两栋高层住宅,西面是东园三村的多层住宅,东面的围墙之外即是交通拥堵的浦东南路;场地经粗平较为平坦,施工地坪在施工前须予以硬化;施工面偏小;北、东部围墙处有高压电缆,施工时要特别注意保护。1.3地质情况详见地质报告,其中不良地质情况:场地内第①层杂填土,厚度较大,成分较为复杂,夹碎砖、混凝土碎块等建筑垃圾,局部有原有建筑物基础,在成桩施工前要注重提前予以清除;第⑦层地基土:为粉质粘土及粉砂,该层土土质较松散,桩钻进过程中,易产生流砂、孔壁坍塌等不良地质现象,施工中须加强泥浆性能的控制。场地北侧和西侧有范围较大的暗浜、暗塘分布。1.4周边环境根据业主提供的周边管线图,在东侧浦东南路有较多市政公用管线。主要分布按由近及远,由西向东为:埋深600mm电力管线,据基坑最近距离为13m;埋深600mmΦ200给水管,距基坑距离16m;埋深0.90mΦ700给水管道,距基坑距离17m;埋深不详的Φ300给水管道,据基坑距离18m;Φ1650雨水管;Φ450污水管;埋深1.10mΦ1200燃气管道;埋深700mm信息36孔管线;埋深0.60m信息管线;埋深海光大厦(华东电网调度中心大楼)工程一柱一桩施工专项调整方案上海市第二建筑有限公司2700mm信息管线,埋设800mmΦ300给水管,距基坑45m。其余三侧居民区管线资料暂时缺少,估计分布有较多雨污排管、给水、燃气、信息等管线需在施工中重点监测,进行保护。1.5工程施工特点(1)本工程位于浦东南路、近世纪大道,地处交通行人频繁地段,工程施工对城市的正常生活、交通秩序影响很大。要求施工的机械、材料及工程设备的运输必须事先经过周密计划,细致地组织安排,及时办理各种所需手续,既要确保施工顺利,又要确保城市交通及行人往返正常运行;(2)本工程施工现场三面紧邻居民住房、一面紧邻浦东南路,受施工影响较大,这就要求施工中要严格控制声、光、尘及水的排放和污染、施工过程应重点做好文明施工及环境保护措施,确保周边居民生活正常;(3)施工过程中,加强泥浆性能控制,严防孔壁坍塌;对有桩端后注浆要求的桩,要做好注浆管的安放工作,确保后期注浆的顺利完成;因钢管桩的垂直度要求为1/600,对调垂完成后的纠正架须加以保护,严禁碰撞;一柱一桩灌混凝土中须经常测量混凝土上升面,及时、准确地控制换混凝土界面;并及时做好桩孔的防