XXXXXXX垸撇洪渠改造工程报告XXXX设计院1湖南省长沙市XXXXXXX垸撇洪渠改造工程设计报告XXXX设计院二00六年九月XXXXXXX垸撇洪渠改造工程报告XXXX设计院2院长:总工:审查:项目负责:设计:XXXXXXX垸撇洪渠改造工程报告XXXX设计院3目录1.综合说明......................................................................................41.1任务来源....................................................................................................41.2工程概况....................................................................................................42.工程水文地质...............................................................................42.1工程水文条件............................................................................................42.2工程地质条件............................................................................................42.3岩土工程评价............................................................................................53.工程设计......................................................................................53.1设计任务及依据.........................................................................................53.1.1设计任务................................................................................................................53.1.2设计标准................................................................................................................53.2设计基本资料............................................................................................63.2.1水文地质条件.........................................................................................................63.2.2泥沙........................................................................................................................63.3设计采用的主要技术规范...........................................................................63.4撇洪渠设计................................................................................................63.4.1撇洪渠轴线选择.....................................................................................................63.4.2涵管形式选择.........................................................................................................73.4.3箱涵断面尺寸设计..................................................................................................73.4.4箱涵分段处止水设计..............................................................................................73.4.5箱涵结构设计.........................................................................................................73.4.6主要材料................................................................................................................83.4.7水力计算................................................................................................................84.施工组织设计...............................................................................94.1施工条件....................................................................................................94.2施工概况及施工工艺................................................................................104.3施工工期..................................................................................................124.4人员及机械设备.......................................................................................12XXXXXXX垸撇洪渠改造工程报告XXXX设计院41.综合说明1.1任务来源该工程为湖南XXX置业有限责任公司开发的XXX·XXX三期项目的一部分。由于原有撇洪渠对主体工程的布置实施有影响,我院受业主委托,承担了XXXXXX归心苑朝正垸撇洪渠改造工程的设计任务。1.2工程概况原有撇洪渠过水断面为底宽4米,高3.1米的矩形断面,结构为盖板涵形式,本次设计过水断面尺寸不变,结构形式为钢筋混凝土箱涵。涵管纵坡坡比为1/1600,设计撇洪流量为11.34m3/s。主要工程量汇总表序号项目单位数量备注1土方开挖m312696.002土方回填m39269.863M7.5砌砖m34.924钢筋制安t140.105C10混凝土m396.6246C25混凝土m3935.117浆砌石m35.338φ700mm井盖、盖座套22.工程水文地质2.1工程水文气象条件根据省院水文室提交的原始资料,离河口2.40km的广电中心相应的撇雨面积为2.82km2。经过计算,撇洪流量为11.34m3/s。该工程位于长沙市城区,历年极端最高气温为40.6℃,历年极端最低气温为-11.3℃,年平均降雨量1389.8毫米,日最大降雨量192.5毫米。2.2工程地质条件根据地勘报告,拟建场地地层结构简单,根据各层结构特征,场地内无6度烈度地震作用下可液化土层,亦无活动性发震断裂通过。临近场地亦未发现影响XXXXXXX垸撇洪渠改造工程报告XXXX设计院5工程稳定性的不利因素。属于可进行建设的一般场地。场地等级为三级,场地地基等级为二级。2.3岩土工程评价根据现场察看情况,撇洪渠改造工程施工地层岩性由上至下分述如下:(1)素填土层:褐红色,局部褐灰色,粘性土回填为主,湿,结构松散,混少量碎石等,局部夹杂有建筑垃圾、塘泥。填筑年限小于4年,未完成自重固结。该层厚度1-2m左右,工程性状差,不能作为箱涵基础的持力层。(2)粉质粘土层:红夹黄色、黄-白色,硬塑状,具网纹状构造。抗剪强度较高,具中等压缩性,工程性状良好。考虑采用粉质粘土层作为本工程改道撇洪渠的持力层。3.工程设计3.1设计任务及依据3.1.1设计任务本次设计主要完成以下几个项目的设计:(1)改线渠道的水力设计(2)箱涵的结构设计(3)其它本工程相关部位的设计3.1.2设计标准1、工程等别、建筑物级别XXXXXX归心苑朝正垸撇洪渠改造工程包括拆除原有盖板涵及重建一段箱涵。根据原有撇洪渠的使用要求,改线渠段过洪能力应为11.34m3/s,根据SL252—2000《水电枢纽工程等级划分及设计安全标准》规定,根据水利水电工程分等标准:本枢纽工程属Ⅴ等,小(2)工程。本段属5级建筑物。2、洪水标准XXXXXXX垸撇洪渠改造工程报告XXXX设计院6本工程的洪水设计标准:是根据长沙市区暴雨与外河最高水位遭遇机会按规范确定的,即内部5年一遇设计暴雨与外河100年一遇设计洪水位遭遇;内部10年一遇暴雨与外河20年一遇洪水位遭遇,取上两种情况的外包线作为设计水面线。3、防震标准长沙市区抗震设防烈度为VI度。本工程不作抗震设计。3.2设计基本资料3.2.1水文地质条件本次改线涵管的开挖深度约为3.5m,渠底高程约为38m。根据地勘资料本地区主要含水层为圆砾层,所含地下水为孔隙地下水,地下水静水位为25.0-26.4m,平均为25.9m,素填土层中有少量的上层滞水,静水位为22.5-33.7。由上可知,本段涵管位于地下水位以上,无外水压力及浮托力影响。3.2.2泥沙本工程涵管沿线属长沙市城区,城市道路硬化率高,植被绿化较好,水土流失较少。工程使用多年后泥沙沉积时,可在枯水期进行人工清淤及工程检修等任务。3.3设计采用的主要技术规范《水利水电工程等级划分及洪水标准》(SL252-2000);《水工混凝土结构设计规范》(DL/T5057-1996);《公路钢筋混凝土及预应力混凝土桥涵设计规范》(JTGD62-2004);《公路桥涵地基与基础设计规范》(JTJ024-85);《公路桥涵施工技术规范》(JTG041-2000);《钢筋焊接与验收规程》(JTJ18-96);其他相关规范及规程。3.4撇洪渠设计3.4.1撇洪渠轴线选择XXXXXXX垸撇洪渠改造工程报告XXXX设计院7本工程撇洪渠改线的轴线选择根据业主要求,以不影响主体工程建设为基础,最终选定该方案。(详见总平面布置图)3.4.2涵管形式选择根据本工程位置及地质情况特点,在涵管结构形式上可以考虑浆砌石挡墙混凝土盖板涵和钢筋混凝土箱涵。由于盖板涵