目录第一章:概述·······························11.1编制依据································11.2编制原则································21.3工程简介································21.4工程主要特点······························31.5工程主要难点及施工对策·························3第二章:施工进度计划安排··························32.1.原则··································32.2.施工组织································42.3.工期控制与分阶段目标··························42.4现场临设布置······························42.5工、料、机,用款计划··························52.6工程主要材料······························72.7工程协调································72.8施工准备································82.9交通导行································8第三章:施工方案·······························93.1测量控制································93.2施工工序·······························10第四章:雨季施工措施····························15第五章:质量目标及质量保证措施·······················165.1质量目标·······························165.2质量保证体系·····························165.3项目部主要领导质量职责························165.4文件控制·······························185.5产品标识和可追溯性··························185.6质量保证—过程控制··························185.7分部、分项工程质量保证措施······················195.8检查、验收、组织程序·························195.9本工程检验标准····························19第六章:安全管理体系及消防保卫措施·····················226.1安全保证措施·····························226.2消防保卫、健康体系及措施·······················24第七章:工期保证措施····························25第八章:文明施工及环境保护措施·······················278.1文明施工·······························278.2环境保护措施·····························28第九章:成品保护措施····························29第十章:节约材料措施····························29第十一章:技术创新·····························30第十二章:分包计划和管理措施························31第十三章:与监理、设计配合措施·······················31附图附表部分1第一章:概述1.1.编制依据1.1.1招标文件序号项目编号备注1内二环路道路改造工程(前门~站西街西口)招标文件1册1.1.2业主提供的施工资料序号项目编号备注1内二环路道路改造工程(前门~站西街西口)路2004-02-166张1.1.3工程应用的主要法规序号类别法规名称编号1国家建筑法2国家环境保护法3地方关于颁发《北京市市政公用工程施工技术资料管理规定》的通知(94)京建质字第315号4地方关于印发《北京市建设工程施工试验实行有见证取样和送检制度的暂行规定》的通知京建法【1997】172号1.1.4工程应用的相关规范、规程和质量评定标准序号类别规范、规程名称编号1国家《工程测量规范》GB50026-9322北京《市政工程施工手册》3北京《北京市市政工程安全操作技术规程》DBJ-56-20014北京《工程建设监理规程》DBJ01-41-895北京《市政道路工程质量评定标准》CJJ1-906北京《市政道路工程质量检验标准》DBJ01-11-957北京《市政工程技术规范》1990.5版8北京《建筑机械使用安全技术规程》JGJ33-869北京《施工现场临时用电安全技术规范》JGJ46-8810北京《北京市城市道路工程施工技术规程》DBJ01-45-20001.1.5其他序号名称1现场调查2企业质量体系文件1.2.编制原则在充分理解招标文件的基础上,积极响应业主在招标文件中提出的工程进度计划和质量目标,以设计文件及有关规范为依据,紧密结合现场实际情况,编制技术先进、切实可行、经济合理的施工方案。1.3.工程简介1.3.1.工程概述内二环路(前门~站西街)西起广场东侧路,东止北京站西街西口,道路全长1780米,其主路改造于2002年完成,辅路及步道尚未进行。本期工程主要是对该路的辅路等附属设施进行改造,同时对崇文门路口主路进行铣刨加铺沥青混凝土,以改善道路的使用性能。主要工程量:类别单位数量沥青混凝土4cm(辅路)m229928.43沥青混凝土4cm(主路)m213883.2水泥方砖步道10*20*6m221689混凝土路缘石12*30*49.5m4230混凝土平缘石10*20*49.5m1917混凝土树池1.5*1.5套340稀浆封层m212725中粒式沥青混凝土m2455挖补7厘米(大型车道及慢行线)m2448.3石灰粉煤灰砂砾底层40厘米m2448.31.3.2.水文地质情况本工程将不考虑水文地质情况1.4工程主要特点1.4.1本工程地处北京市交通流量较大的内二环地区,部分施工将影响车辆通行。1.4.2本工程处在雨季施工,提前做好雨季施工方案及材料准备。1.4.3施工现场狭长,不封闭,对现场管理提出严格的要求。1.5工程主要难点及施工对策1.5.1施工难点:本工程崇文门~站西街施工段为本次施工最大难点,因为此处交通流量极大,给施工带来难度。1.5.2施工对策1.5.2.1制定合理的交通导行措施,配合交通管理部门,维护交通,最大限度的减少施工对车辆的影响。1.5.2.2施工区域设置导行锥桶和导行标志牌,并设专人巡视,防止行人及车辆驶入施工区域内。1.5.2.3施工车辆进出施工区专人指挥。1.5.2.4合理安排工序,高效合理的完成本段施工,以保证总工程进度。第二章:施工进度计划安排2.1.原则2.1.1采用先进施工技术和施工设备,严格管理,确保工程质量达到优质标准。42.1.2施工进度安排合理、高效,施工区段划分科学合理,协调统一,确保工期目标实现。2.2.施工组织2.2.1施工作业区划分及工序流程根据图纸及对施工现场的深入调查,将本工程分为三个施工作业区。第一作业区:前门~台基厂大街路口第二作业区:台基厂大街路口~崇文门路口第三作业区:崇文门路口~站西街西口2.2.2施工组织形式项目经理部组织机构框图(详见附表A-1)本工程中标后组建项目经理部进行管理,内设五部一室(技质部、工程部、经营部、安保部、物资部、办公室),组织强有力的专业施工队进行施工。根据工程规模组建精明强干的项目管理班子,选派具有丰富施工经验的项目经理担任本工程项目经理,同时选派一名优秀的高级工程师出任项目总工,一名年富力强的工程师担任项目副经理,一名经济师担任项目经营部部长,一名优秀工程师担任技术质量部部长,一名有丰富公关经验的同志担任办公室工作,一名施工经验丰富的工程师担任工程部部长,一名责任心强的人员担任安保部部长,一名协调能力强的人员担任物资部部长,共同组成项目部领导层。2.3.工期控制与分阶段目标2.3.1计划总工期计划开工日期:2004年6月15日计划竣工日期:2004年8月14日总工期:60天2.3.2作业区施工划分及施工进度计划2.3.2.1施工阶段的划分根据现场的实际情况及招标文件中对工期的要求,施工顺序为第一、一二作业区同时由台基厂路口向东西两侧施工,第三作业7月份开始施工。2.3.2.2施工阶段计划目标本工程施工项目较多,根据招标文件的工期要求和现场实际情况,施工中根据具体地理位置情工序间采用流水作业,尽量避免相同工序发生冲突。2.3.2.2施工进度计划(详见附图C-1)2.4现场临设布置依据工程现场的实际情况和认真调查后,对施工现场分别进行临设布置。(详见施工平5面布置图。B-1)2.4.1施工用电临时用电根据施工位置而定,从就近住户接入,以满足生产用电及生活区办公用电。设独立表箱计量用电量。为应急准备三台30KW发电机组。2.4.2施工用水机械与消防用水不考虑,生活用水也从就近住户接入。2.4.3施工排水系统因本工程为雨季施工,雨水及施工废水就近排入市政管道中。2.4.4现场临时设施通过认真调查现场后,拟租用活动房屋在前门东大街台基厂南设置现场办公室。每个作业区设置临时料厂。2.5工、料、机,用款计划2.5.1人力资源计划根据工程进度需要,提前做好所需各工种人员的组织和培训工作。劳动力计划配置序号工种人数备注1瓦工150高峰2电工6高峰3修路工100高峰4壮工50高峰5杂工30高峰6合计336高峰2.5.2材料供应计划按照工程需要,编制材料供应计划,并通过调查优选落实供货厂家,对于路缘石、水泥方砖、沥青混凝土等主要材料,提前做好原材料的检验工作。详见主要材料需求计划表。6主要材料需求计划表序号材料名称单位计划数量备注1平缘石乙310×20×49.5米1956根据工程施工情况随用随上2立缘石乙212×30×49.5米43153厂拌沥青碎石吨714中粒式沥青砼吨12715细粒式沥青砼吨24686液态热沥青吨257改性沥青混凝土SMA-10吨10578水泥吨1009C20预拌豆石砼立方米36110石灰、粉煤灰、砂砾吨40011砂子吨75612步道砖平方米2277413混凝土树池框L=1.5根14322.5.3机械使用计划落实工程各阶段所需要的各种类型机械,做到提前进场,并确保挖掘机及运输车辆根据条件及时到位。主要机械设备一览表机械名称规格型号数量(台)进出场时间自有/租用挖掘机小松PC3001待定自有自卸汽车斯太尔10待定自有装载机ZL-503待定自有洒水车SEQ-1402待定自有7破碎炮3待定自有振捣器CDL-5010待定自有发电机F92-503待定自有德国宝马沥青经理自动压实控制系统1待定自有翻斗车F204待定自有空压机9m32待定自有平地机PY160A3待定自有振动压路机DD110德国生产2待定自有轮式压路机CA25中国生产2待定自有振动夯15待定自有摊铺机ABG-423德国生产2待定自有2.5.4用款计划工程款投入随着工程进度平稳注入。序号施工作业区位置投入百分比1一前门—台基厂45%2二台基厂—崇文门30%3三崇文门—站西街西口25%2.6工程主要材料2.6.1、混凝土路缘石,混凝土方砖,水泥、沥青混凝土、石灰粉煤灰等材料组织有关人员对加工厂进行实地考察,加工厂的资质、加工能力要满足设计要求和工程的需要。要对所有材料进行检测,混凝土路缘石,混凝土方砖、沥青混凝土、水泥、无机料、石灰等厂供材料必须有出厂合格证