金通二大道跨线桥及接线工程跨G15沈海高速公路施工行政许可申请材料南通市通州区交通运输局二О一一年九月目录一、许可申请表………………………………………………………………………1二、组织机构代码证…………………………………………………………………2三、立项批复…………………………………………………………………3四、授权委托书………………………………………………………………7五、委托人身份证复印件…………………………………………………………………8六、承诺书……………………………………………………………………9第一章工程概况............................................................10一、单位介绍.................................................................10二、工程概述.................................................................10三、高速公路现状.............................................................11四、设计概况.................................................................12第二章编制依据...........................................................12第三章金通二大道跨线桥施工技术方案.......................................13一、设计技术标准及要求.......................................................13二、跨线桥概况...............................................................13三、施工中对高速公路交通影响及防护措施.......................................13四、项目施工组织机构.........................................................14五、钻孔桩施工方案...........................................................15六、墩柱、盖梁施工方案.......................................................19七、箱梁架设方案.............................................................23八、桥面系施工方案...........................................................25第四章交通疏解方案........................................................29一、施工进度计划安排.........................................................29二、管理组织机构及人员安排...................................................30三、施工准备.................................................................30四、材料、机械准备...........................................................30五、管线迁移.................................................................30六、临时设施.................................................................31七、交通疏解方案.............................................................32第五章安全技术保证措施....................................................34一、占用道路保证措施.........................................................34二、人员进出场安全措施.......................................................35三、机械进出场安全措施.......................................................36四、施工机械设备安全管理.....................................................36五、临时用电安全措施.........................................................37六、恶劣天气施工保证措施.....................................................38七、夜间施工保证措施.........................................................40八、交通标志设置.............................................................40第六章事故应急救援预案....................................................42一、应急预案的目的...........................................................42二、救援领导小组.............................................................42三、事故处理流程.............................................................44四、可能出现的交通事故.......................................................44五、交通事故的应急处理.......................................................44六、超限车辆通过时应急处理...................................................44七、车辆分流应急处理.........................................................45第七章安全、文明、环保保证体系............................................45一、安全施工保证体系.........................................................45二、建立安全施工责任制.......................................................46三、安全检查制度.............................................................46四、施工、值勤人员安全保证措施...............................................48五、施工设施、机械的安全保证措施.............................................48六、文明施工保证体系.........................................................49七、环境保证体系.............................................................50金通二大道跨沈海高速施工方案和交通组织方案专家意见回复1、专家意见:交通疏解时间与先锋快速路交通疏解时间冲突。回复意见:已将封路时间延至先锋路交通疏解完成后,具体时间表详见第29页第四章第一条。2、专家意见:增加天然气管线保护方案。回复意见:在施工方案中增加了天然气保护方案,详见第26页第三章第九条。3、专家意见:限速60km/h统一改为限速40km/h。回复意见:在三阶段交通疏解示意图中已明确为限速40km/h。4、专家意见:管线迁移时间、恢复时间应明确。回复意见:在钻孔桩施工前封闭围挡后,开始管线迁移,立柱施工完成后进行管线恢复,第19页第三章第五条。5、专家意见:围挡内设置临时通道,遇到紧急任务时拆除围挡并恢复交通。回复意见:第32页第六章第六条。12345678910第一章工程概况一、单位介绍建设单位:南通市通州区交通运输局设计单位:东南大学建筑设计研究院监理单位:南通市交通建设工程咨询监理有限公司施工单位:中铁上海工程局华海工程有限公司二、工程概述项目起点位于崇川区、通州区界河西侧,连接新建的钟秀东路,M机动车道设计起点桩号为MK0+246.95,路线向东跨越沈海高速公路后终点与在建的金通二大道连接,终点桩号为MK0+854.977,线路长度为608.027m。A非机动车道设计起点桩号AK0+061,终点桩号AK1+120,线路长度为1059m。B非机动车道设计起点桩号BK0+061,终点桩号BK1+120,线路长度为1059m。本标段设计起点本标段设计终点11三、高速公路现状G15沈海高速公路现状路面宽度32米左右,路面标高约7.69~8.47米,为双向六车道加两个紧急停靠带。下穿高速公路处有一座小桥(半幅为供水管线路、半幅为人行通道),中央分隔带宽2米。公路两侧边坡坡脚线之间垂直距离47.8米左右。M线8#墩、A线11#墩、B线12#墩位置M线6#墩、A线9#墩、B线10#墩位置12M线7#墩、A线10#墩、B线11#墩位置金通二大道跨线桥及接线工程中心里程在沈海高速K1173+700左右,而正在施工的先锋互通立交在沈海高速K1179+634~K1180+684施工范围,两工地距离约6~7公里。四、设计概况1、平面布置金通二大道跨线桥上跨沈海高速位置为M线6#~8#墩、A线9#~11#墩、B线10#~12#墩,其中M线6#、8#墩、A线9#、11#墩、B线10#、12#墩设置在高速公路两侧,M线7#墩、A线10#墩、B线11#墩设置在高速公路中央分隔带中。2、横断面布置采用三幅桥梁,横向布置为:5.5m(A非机动车道)+4.75m(侧分带)+25.5m(机动车道桥)+4.75m(侧分带)+5.5m(B非机动车道)=46m。3、跨沈海高速公路的跨线桥下通行净空最小为5.336m。第二章编制依据——南通市通州区金通二大道跨线桥及接线工程招标文件和施工合13同;——《南通市通州区金通二大道跨线桥及接线工程施工图设计》;——相关技术标准、规范和规程;——现场踏勘中获取的信息和资料;——我公司多年来从事类似工程所积累的施工经验和成熟的施工工艺。第三章金通二大道跨线桥施工技术方案一、设计技术标准及要求1、道路等级:城市主干道(Ⅱ级);2、设计速度:60km/h;3、设计荷载:公路-Ⅰ级,人群荷载:3.5KN/m2;4、桥面宽度:5.5m(A非机动车道)+4.75m(侧分带)+25.5m(机动车道桥)+4.75m(侧分带)+5.5m(B非机动车道)=4