森林步道及景观工程施工组织设计

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

福州左海公园-金牛山城市森林步道(施工)(项目名称)/标段招标编号:榕市市政招2014132投标文件投标文件内容:技术文件___1目录第一章编制依据及范围·····································2第二章工程概况···········································3第三章施工部署···········································6第一节质量、进度、安全目标·······································7第二节项目管理总体安排···········································7第三节设备、人员动员周期和设备、人员、材料运到施工现场的方法····10第四节施工调度···················································10第四章施工方案··········································11第一节施工准备···················································11第二节基础工程施工方案···········································13第三节钢桁架工程施工方案·········································20第四节给排水工程施工方案·········································31第五节电气工程施工方案···········································33第六节坡道景观工程施工方案·······································39第五章施工进度计划······································50附施工进度计划表·············································51第六章资源供应计划······································52第七章施工平面布置······································57附项目部平面布置示意图·······································60第八章技术组织措施计划··································61第一节保证进度目标的措施·········································61第二节保证质量目标的措施·········································66第三节分项工程施工质量保证措施···································68第四节保证安全目标的措施·········································77第五节保证成本目标的措施·········································89第六节保证季节施工的措施·········································91第七节保证环境的措施·············································94第八节文明施工的措施·············································98第九章实施难点和对策···································101第十章其他应注意的事项·································1032第一章编制依据及范围一、编制依据1、福州市鼓楼区建设投资管理中心发布的“福州左海公园—金牛山城市森林步道(施工)”招标文件、补遗书、施工图(示范段)设计文件以及施工技术规范、标准等。2、现行市政、建筑等设计规范、施工技术规范及规程、工程质量检验评定及验收标准,市政工程预算定额等。3、现场踏勘、实地调查情况。4、本单位施工同类工程的成功经验。根据我单位对现场的考察调查结合我们的技术能力、机械设备状况、管理水平、施工经验及拟投入本合同段的资源配置。二、编制原则1、遵循招标文件条款的原则在编制施工组织设计的过程中,严格按照招标文件的规定,做到统一标准,规范编制。2、遵循设计和规范、验收标准的原则在编写主要项目施工方法中,严格按设计要求,执行现行施工规范和验收标准,正确组织施工,保证工程质量达到合格,力争创优。3、坚持实事求是的原则在制定各具体项目实施方案过程中,充分分析研究市政工程施工的特点、难点,根据我们的施工能力,坚持科学组织,合理安排,均衡生产。确保优质高效完成本合同段施工任务。4、坚持施工全过程严格管理的原则在各道工序施工中,严格执行监理工程师的指令,尊重甲方现场代表和质检部门意见,严格管理。5、坚持推广应用“四新”成果的原则在施工中积极推广应用新技术、新材料、新工艺、新设备,充分发挥科学技术在施工中的先导作用。6、坚持专业化作业与综合管理的原则3在施工组织方面,以专业作业队为基本组成形式,充分发挥专业人员和先进优良设备的优势,同时采取综合管理手段合理调配,以达到整体优化的目的。第二章工程概况一、工程简介1、项目概况福州左海公园—金牛山城市森林步道及景观工程位于福州市鼓楼区,闽江东侧,梅峰路、梁厝路南侧,西环北路西侧,杨桥西路北侧。公园绿线范围175公顷,建设范围48.7公顷,主轴线东起左海公园,西至闽江国光公园,以长度为6267m的无障碍架空栈道为主,局部约有750m根据地形下放至地面。在主轴线两端各有一条车行道从市政道路直通主轴线,总长约3000m。登山步道以网状形态分布在金牛山上,总长度约8200m。跟着近几年福州市的绿道建设,绿道网日渐完善。金牛山由城市森林步道的建设,将把鼓楼区现有的左海西湖环湖步道,和闽江北岸绿道的国光公园、创业广场节点串联成系统。使鼓楼区绿道更具系统性、更有连贯性、更四通八达。福州左海公园—金牛山城市森林步道及景观工程的示范段,起于金牛山体育公园,市民通过环形坡道进入森林栈道,沿着山势盘旋进入森林步道主线或现状水泥路,该进出口还设步道进入水泥路。示范段总长1274.741米。其他出入口设置栈道或步道接入主线,接入主线部分长123.569米。2、建设规模福州左海公园—金牛山城市森林步道及景观工程施工,栈道采用钢结构形式架设。工程内容包括森林步道主体工程、步道各出入口、各景观节点、步道配套设施建设、步行道周边山体景观修复及绿化提升、夜景灯光、音频设计备、还建工程等。项目选址面积40232.4平方米,主轴线连接左海和国光公园,以长度6267米的无障碍架空栈道为主,车行道3000米,登山步道8200米。3、地形地貌拟建工程场地位于福州市鼓楼区,栈道沿线多为树木等,地形较为简单,地形较为陡峭,起伏较大,场地现状标高约为25.2~92.9左右,场地地貌类型属剥蚀残丘地貌。44、地质构造根据已有区域地质资料,场地区域内全新世以来无活动断裂,对拟建工程无不利影响,属构造稳定场地,适宜建设本工程。5、场地土层根据现场钻探揭示及已有地质资料,结合土工试验结果,本场地主要由以下几个土层组成:(1)坡积粘性土:浅红色,硬塑,湿,含少量中粗粒石英和高岭土,局部夹3-14cm的碎石,无摇振反应,有光泽,捻面光滑,干强度及韧性中等,粘性偏强。该层在每个钻孔中有揭示,揭示厚度为1.3~13.9m。(2)全风化花岗岩:肉红、褐红色,硬塑,湿,含中粒石英及长石颗粒,稍具砂感,原岩结构已完全风化破坏成土状,母岩为花岗岩。岩石坚硬程度属极软岩,岩体完整程度属极破碎,岩体基本质量等级属V类,风化程度为全风化。该层在LB1等28钻孔中有揭示,揭示厚度为0.1~5.9m。(3)砂土状强风化花岗岩:灰黄色,湿,硬。含粗粒石英,长石颗粒及云母片,母岩为花岗岩,进尺有响声,岩芯采取率大于65%,岩芯主要以砂土状为主,手可捏碎。大部分矿物已显著风化变质,岩石坚硬程度属极软岩,岩体完整程度属极破碎,岩体基本质量等级属V类,岩性属花岗岩,风化程度为强风化。该层在LB4等24个钻孔中有揭示,揭示厚度为1.7~30.4m。在钻孔LB19埋深7.8~10.7m处存在孤石。(4)碎块状强风化花岗岩:为燕山晚期第二次侵入的产物,灰黄色,硬,湿,含云母片、长石及石英,进尺有响声,岩芯采取率大于65%,岩芯呈碎裂状,用手用力可折断,大部分矿物已风化变质,岩石坚硬程度属极软岩~较软岩,岩体完整程度属破碎~较破碎,岩体基本质量等级属IV~V类,岩性属花岗岩,风化程度为强风化。该层在LB1等28个钻孔中揭示,揭示厚度为0.8~20.7m。(5)中~微风化花岗岩:为燕山晚期第二次侵入的产物,花岗结构、块状构造,岩性为粗粒花岗岩,坚硬,湿,以浅黄色为主,含石英、长石、角闪石颗粒剂云母片,长石普遍有强烈绿泥石化和高龄土化,存在风化裂隙,金刚石钻头钻进,钻进缓慢,岩芯主要以短柱状为主,局部破碎,岩石质量指标RQD为50~75.岩石坚硬程度属较硬岩~坚硬岩,岩体完整程度属较完整~较破碎,岩体基本质量等级分类属III~IV类,岩性属花岗岩,风化程度为中~微风化。该层在LB1等17个钻孔中有揭示,为揭穿,揭示厚度为1.13~9.5m。5基岩内未揭示临空面、洞穴、软弱岩层及破碎岩体。拟建场地地层在水平向均匀性尚可,垂直向软硬相间,变化较大,均匀性较差,属不均匀地基。6、地下水类型本工程地下水主要为大气降水补给,且多顺坡排泄于沟谷之中,少量以下渗方式排泄。场地地下水水量相对较小。本场地的地下水类型主要包括:(1)网状孔隙水:主要赋存于全风化花岗岩和砂土状强风化花岗岩中。该层地下水埋藏较深,对工程施工影响不大,主要接受相邻含水层侧向补给,总体水量较一般。(2)基岩孔隙—裂隙承压水:主要赋存于碎块状强风化花岗岩及下部的中~微风化岩层中,由于风化程度不同,风化裂隙率和连通性差异较大,其透水性具不均匀性,总体透水性较弱,富水性也较弱,属基岩裂隙的垂直补给。以上各土层地下水之间无明显的水力联系。(3)相对弱透水层:坡积粘性土的透水性差、水量小,可视为相对弱透水层。据外业期间测量,各钻孔均未见初见水位,亦未测得地下水位。据邻近工程资料,本场地地下水稳定水位埋深多在6.62~20.1m,水位年变化幅度在6.0米以内,由于场地地势变化较大,故沿线近3~5年及近历年地下水最高水位埋深一般在0.5~3.0米间不等。据调查,场地地下水混合水位的年变化幅度一般在6.0m以内,本场地近3~5年最高地下水位高程为7.00m,历年最高地下水位高程为7.5m。7、场地地震效应本场地位于福州市鼓楼区,抗震设防烈度为7度,设计基本地震加速度值为0.1g。二、技术标准1、主要技术标准(1)荷载标准:人群荷载:4.5kN/m2;栏杆竖向荷载:1.2kN/m;风压力:0.7kN/m2。(2)设计基准期:50年。(3)机构安全等级:二级:重要性系数γ0—1.0。(4)建筑结构抗震设防类别:丙类;抗震设防烈度7度(0.1g)。(5)建基基础设计等级:乙级。(6)地基安全等级:乙级(γ0=1.0)。6(7)上部结构自振频率≥3Hz。(8)设计环境类别:II类;混凝土净保护层厚度桩基部分不小于7.5cm,墩柱不小于4cm。2、结构尺寸桩基长度12~15米为刚性桩基础,最大弯矩位于桩入土位置。森林步道主桥宽度2.4m,外侧设置铝合金结构栏杆及不锈钢扶手。观景台及遮阴休闲平台宽3.6米。3、施工规范及质量验收评定标准《工程测量规范》(GB50026-2007)《公路路基施工技术规范》(JTGF10-2006)《公路路面基层施工技术规范》(JTJ034-2000)《公路水泥混凝土路面施工技术规范》(

1 / 106
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功