I目录第1章编制说明...........................................................................................................................................11.1编制依据...........................................................................................................................................11.2编制目的及范围...............................................................................................................................1第2章工程概况.............................................................................................................................................1第3章防水标准.............................................................................................................................................1第4章防水施工.............................................................................................................................................44.1材料选择...........................................................................................................................................44.2基面处理...........................................................................................................................................54.3缓冲层的施工方法...........................................................................................................................54.4防水板的固定...................................................................................................................................54.5防水板接缝焊接...............................................................................................................................84.6防水层的保护...................................................................................................................................9第5章施工缝做法.......................................................................................................................................105.1施工缝的设置................................................................................................................................105.2施工要求........................................................................................................................................115.3施工缝施作的质量保证措施........................................................................................................115.4注意事项........................................................................................................................................121第1章编制说明1.1编制依据1)常营站—草房站区间防水施工图。2)常营站—草房站暗挖区间施工组织设计。3)规范、规程(1)《地下铁道工程防水施工规范》(GB50108-2008)(2)《地下铁道设计规范》(GB50157-2003);(3)《地下防水工程质量验收规范》(GB50208-2002)1.2编制目的为了明确隧道防水施工作业的工艺流程、操作要点和相应的工艺标准,指导、规范隧道防水施工。第2章工程概况2.1工程概况常营站~草房站区间隧道设计里程为:左线K28+963.016~K30+041.469,长1078.453m;右线K28+963.016~K30+040.013,长1076.997m。本区间设施工竖井及横通道3座,1号竖井及横通道与区间交点里程约为K29+335,2号竖井及横通道与区间交点里程约为K29+848.5。横通道后期做为区间的联络通道,1号联络通道与区间废水泵房合建。在K30+28.210和K30+13.200处设置迂回风道。3号竖井位于K29+079.419m里程处。区间隧道与迂回风道均采用采用矿山法暗挖施工。2右JD56左JD62左JD63126306545.0278521367.3963306281.3153521785.8137左JD62左JD6236°55'50.00500.0070.00202.091392.280左JD6348°57'51.00500.0070.00262.855497.293右JD61右JD6135°52'50.00500.0070.00197.010383.117右JD62右JD6247°54'51.00500.0070.00257.341488.130K291160.268292230.26829351.82629473.38529345543.38529583.621296653.62129827.686291.75130789K30K291156.456292226.45629352.59629478.73629345548.73629589.586296659.5862916.87930789K301VXCY3244XCY1434454545图1-1区间主体总平面图图1-2迂回风道平面图2.2矿山法施工段结构简介1)马蹄形标准断面部分该断面全长左线为1078.453米,右线1076.997m,宽6.2米,高6.5米,见下示意图1-3所示。常营站侧分界处草房站侧分界处1#竖井2#竖井迂回风道迂回风道迂回风道3#竖井3图1-3马蹄形标准断面示意图2)迂回风道断面部分左右线间迂回风道断面全长约15米左右,其中断面宽6.4米,高5.23米。见下示意图1-4所示。图1-4迂回风道断面示意图4第3章防水施工标准区间隧道、联络通道防水等级为二级,顶部不允许滴漏,其它不允许漏水,结构表面可有少量湿渍,总湿渍面积不大于总防水面积的2/1000;任意100m2防水面积上的湿渍不超过3处,单个湿渍的最大面积不大于0.2m2。隧道工程中漏水的平均渗漏量不大于0.05L/m2*d,任意100m2防水面积渗漏量不大于0.15L/m2*d。第4章防水施工除结构自防水外,在喷射混凝土初衬和模筑混凝土二衬之间设置柔性防水层(即复合式衬砌夹层防水),防水层兼作隔离层。防水施工工序见图4-1.图4-1防水施工工序4.1施工准备1)技术准备施工前,技术人员应熟悉图纸,并编制专项施工方案,组织施工人员学习防水施工技术,下发技术交底。2)主要施工机械准备热合机2台,电烙铁2台,射钉枪4支,移动脚手架2套。3)材料准备区间主体、联络通道及迂回风道采用1.5mm厚EVA防水板进行全包防水。防水板与基层间设置400g/㎡的无纺布缓冲层,底板平面部位的防水层上表面设置400g/m2的5无纺布保护层,并浇筑7cm的C20细石砼保护层。4.2基层处理铺设防水层前,外露钢筋头、钢管等尖锐物要挫平、割除、防腐处理,并用砂浆抹平。清除围护结构、垫层、顶板上的浮土、泥浆、油污等杂物。对渗漏水地方进行注浆堵漏,防水砂浆找平,必要时埋设透水盲管,保证防水层铺设前基面平整无渗漏。(1)初支面集中漏水部位注浆堵水,渗水部位施作防水砂浆刚性防水层,保证基面无明显渗漏水,当仰拱表面水量较大时,宜在仰拱初衬表面设置临时排水沟。(2)清除回填碴土和喷射混凝土回弹料,与边墙接头的仰拱部分用风镐凿毛,用高压风或高压水清理干净,保证初支混凝土基面上无泥、水和基本干燥。(3)拱墙部分自拱顶向两侧将基面外露的钢筋头、铁丝、锚杆、排管等尖锐物切除锤平、防腐处理,并用砂浆抹成圆曲面。(4)保证喷射混凝土表面平整,两相邻凸出部分的高度H与间距L之比,拱部不大于1/10,其它部位不大于1/8,超出部位采用1:2.5的水泥砂浆找平或者喷射混凝土的方法找平。(5)变形缝两侧各50cm范围内的基面应全部采用1:2.5的水泥砂浆找平。(6)隧道断面变化或突然转弯时,阴角应抹成半径大于10cm的圆弧,阳角处应抹成半径大于5cm的圆弧。(7)基面处理完后,必须经监理检查确认合格后,方可进入下一道工序的施工。4.3铺设缓冲层(1)缓冲层采用单位重量≮400g/m2的土工布。(2)缓冲层采用水泥钉、铁垫片和与防水板相配套的塑料圆垫片将缓冲层固定在已达到要求的基面上。固定点之间呈梅花形布设,其间距为:拱顶500~800mm、边墙800~1000mm、仰拱1500~2000mm;仰拱与侧墙连接部位的固定间距应适当加密至50cm左右。所有塑料垫片均应选择基层凹坑部位固定,避免固定防水板时局部过紧。(3)缓冲层采用搭接法连接,搭接宽度为50mm。搭接缝可采用点粘法进行焊接或用塑料垫片固定。缓冲层铺设应与基面密贴,不得拉得过紧或出现过大的皱褶,以免影响防水板的铺设。4.4铺设塑料防水板1)防水板铺设工艺(1)防水板铺设包括铺设准备、缓冲层铺设、防水板铺设、防水板焊接、质量检验等环节。其施工工艺流程图见下图。6(2)防水板的铺设准备工作主要包括下列内容:①洞外检验防水板及缓冲层材料质量。②对检查合格的防水板,用特种铅笔画出焊接线及拱顶分中线,并按每循环设计长度截取,对称卷起备用。③铺设防水板的移动脚手架就位。