目录一、编制依据.....................................................................................................................................2二、工程概况.....................................................................................................................................2三、施工部署.....................................................................................................................................23.1安全防护领导小组.................................................................................................................23.2设计总体思路.........................................................................................................................23.3技术准备.................................................................................................................................33.4材料准备.................................................................................................................................3四、构造要求及技术措施.................................................................................................................34.1外挂架构造.............................................................................................................................34.2外挂架组装、提升.................................................................................................................54.3物料平台构造.........................................................................................................................64.4物料平台吊装.........................................................................................................................84.5电梯井操作平台构造.............................................................................................................94.6操作平台加工、安装要求.....................................................................................................9五、安全防护措施.............................................................................................................................95.1电梯井洞口防护措施.............................................................................................................95.2结构临边防护.......................................................................................................................105.3外挂架管理...........................................................................................................................115.4物料平台管理.......................................................................................................................11六、计算书.......................................................................................................................................136.1外挂架稳定承载计算...........................................................................................................136.2物料平台稳定承载计算.......................................................................................................136.3电梯井操作平台验算...........................................................................................................15七、外挂架平面布置图...................................................................................................................17一、编制依据1.1《建筑施工扣件式钢管脚手架安全技术规范》(JGJ130-2001);1.2《建筑施工安全检查标准》(JGJ59-99);1.3《钢结构设计规范》(GBJ17-88);1.4《建筑结构荷载规范》(GBJ9-87);1.5《高层建筑施工手册》;1.6******家园3区3#楼工程施工图纸1.7******家园3区3#楼工程施工组织设计二、工程概况******家园3区3#楼工程地处朝阳区广聚路南侧44号院内,为塔式公寓楼,地上26层,地下2层。地下二层为活动室(战时为五级人防)和设备用房。地下一层主要功能为自行车库、物业用房,地上为住宅用房。地下二层层高3.3m,地下一层层高3.9m;首层、十四层、二十六层层高3m,标准层层高2.75m。±0绝对标高39.750m,室内外高差0.900m。总建筑面积35252.44m2,地下建筑面积2573.21m2,其中人防面积1117.77m2,标准层每层建筑面积1257m2。檐口高度73.500m,±0绝对标高39.750m,室内外高差0.900m。建筑总高84.56m。三、施工部署3.1安全防护领导小组安全生产、文明施工是企业生存和发展的前提条件,是达到无重大伤亡事故的必然保障,也是我项目部创建“文明现场”、样板工地的根本要求。为此项目部成立以项目副经理为组长的安全防护领导小组,组织机构组成、人员编制责任分工如下:3.2设计总体思路由于本工程为塔式公寓楼,结构型式为剪力墙结构,结构墙体施工采用定型钢制大模板。故外墙所用脚手架为与钢模板配套使用的钢制三角承重架,由模板厂进行模板设计、加工并计算。从二层墙体开始挂架,随结构升高向上提升,对结构顶部二层进行防护。以下各层结构阳台门口处设置封闭护身栏。首层顶板四周设6m宽平挑网,以上每间隔三层设一道3m宽平挑网。随着施工进度的加快,为方便施工、提高劳动效率,决定在2~5轴/T轴处安装一物料平台,作为材料的传递、运输的中转站。3.3技术准备1.根据平面布置图,绘制外挂架布置图。2.为便于施工及提升,对挂架分组进行组拼,共26组。3.平面布置见附图。3.4材料准备材料名称数量材料名称数量外挂架88榀脚手板50m3勾头螺栓88套安全网1260m2Φ48钢管3200m四、构造要求及技术措施4.1外挂架构造外挂架由三角架、吊挂螺栓、护身栏、脚手板、安全网组成。三角架为全钢结构,由8#槽钢焊接而成,架体外端和下端设有48钢管以便于现场施工时连接,靠墙部位设有两个支撑,其中上端的一个作为悬挂点,用吊挂螺栓将外挂架与外墙拉紧。吊挂螺栓采用30圆钢,长度550mm,一端为L型,另一端为T30*4螺纹,每套配一个10*120*160垫片和两个螺母。三角架间距为900-1800mm,尽量使用大模板最上排穿墙螺栓孔,如螺栓孔位置不够用,在墙体合模前,在相应位置加Φ32套管,以保证勾头螺栓的穿入。受结构限制,北侧凹廊内挂架架体宽为1000mm,南侧及东侧、西侧凹廊内架体宽为1200mm,其余外挂架架体宽均为1400mm。三角架之间采用纵向水平杆进行拉结,组成外挂架。组成的挂架长度不超过6m。水平杆长度根据挂架长度确定。挂架外侧防护栏杆立杆采用6m长Φ48钢管,外立杆下跨2600m,间距1500mm。外侧防护栏杆纵向水平杆间距900mm。外侧防护栏杆内使用密目安全网全封闭,并外设剪刀撑以保证稳定性,。挂架内侧立杆采用3m长Φ48钢管,间距同外立杆。在楼层标高部位设小横杆,小横杆间距不得大于1.2m。小横杆上满铺脚手板,组成操作平台,平台上部设300mm高挡脚板。要求挂架外侧挡脚板须与阳台防护架挡脚板在同一标高。底部平台下必须满兜密目网。如遇到空调板及阳台时,外挂架须断开,空调板及阳台处设置防护架。外挂架及阳台防护架具体构造如图所示:外挂架构造示意图东、西、南侧凹廊为1200间距1500mm间距1500mm外立杆纵向水平杆横向水平杆外立杆密目安全网横向水平杆外挂承重三角架50厚脚手板纵向水平杆间距900mm200高挡脚板外刷黑黄相间油漆外挂架剖面图阳台防护架剖面图密目安全网间距1500mm间距1500mm50厚脚手板外刷黑黄相间油漆200高挡脚板间距900mm纵向水平杆地锚地锚斜撑悬挑杆间距1500mm斜杆350900纵向水平杆11外挂承重三角架30冷拔