四川省内江至遂宁高速公路监理细则公路工程监理使用表格四川省内江至遂宁高速公路监理细则目录1、总体施工组织设计报审表················································A-102、分项(分部、单位)工程开工申请批复单··································A-113、施工放样报验单························································A-124、原材料报验单··························································A-135、分项工程施工主要人员报验单············································A-146、进场设备报验单························································A-157、施工方案及主要工艺报审表··············································A-168、专项安全、文明(环保)施工方案报批单··································A-179、检验申请批复单························································A-1810、工序检查报验单·······················································A-1911、下承层检验申请批复单·················································A-2012、混凝土浇筑申请报告单·················································A-2113、施工单位月工作计划报告单·············································A-2214、施工单位每周工作计划·················································A-2315、监理巡视记录························································A-2416、监理旁站记录·························································A-2517、监理日志·····························································A-2618、监理日巡视、旁站、抽捡安排表·········································A-2719、工地会议记要·························································A-2820、监理指令·····························································A-2921、工程暂时停工指令·····················································A-3022、复工申请·····························································A-3123、复工指令·····························································A-3224、施工日志·····························································A-3325、工程质量(安全)事故处理报告单·······································A-3426、中间交工证书·························································A-3527、公路工程(施工段)交工验收证书··································A-3628、工程缺陷责任期终止证书···············································A-37四川省内江至遂宁高速公路监理细则总体施工组织设计报审表施工单位:合同号:施工段号:监理单位:编号:A-10-□□□-□□□□致(驻地监理工程师):(总监理工程师):现报上工程的实施性总体施工组织设计及附件,请予审查和批准。附件:施工组织设计施工单位签字:日期:驻地监理工程师意见:驻地监理工程师签字:日期:总监理工程师意见:总监理工程师签字:日期:四川省内江至遂宁高速公路监理细则分项(分部、单位)工程开工申请批复单施工单位:合同号:施工段号:监理单位:编号:A-11-□□□-□□□□致监理工程师:根据合同要求,我们已经准备好工程(桩号)开工前的一切准备工作,现申请该项工程正式开工,请予批准。建议开工日期:计划完工日期:此项工程现场负责人:附件:1、施工测量放线报验单2、工程原材料报验单3、混合料配合比批复文件(通用函件)4、施工组织及人员报验单5、进场设备报验单6、施工方案及主要工艺报审表施工单位签字:日期:专业监理工程师意见:专业监理工程师签字:日期:驻地监理工程师意见:驻地监理工程师签字:日期:总监理工程师意见:(分项开工无,分部、单位工程开工申请增加此栏)总监理工程师签字:日期:四川省内江至遂宁高速公路监理细则施工放样报验单施工单位:合同号:施工段号:监理单位:编号:A-12-□□□-□□□□致测量监理工程师:根据合同要求,我们已完成(起讫桩号或工程部位名称)施工放样,清单如下,请予查验。施工单位签字:日期:桩号或位置工程或部位名称放样内容备注附件:测量及放样资料测量监理工程师意见:测量监理工程师签字:日期:四川省内江至遂宁高速公路监理细则原材料报验单施工单位:合同号:施工段号:监理单位:编号:A-13-□□□-□□□□致试验监理工程师:下列原材料经自检试验符合技术规范要求,报请验证,并准予进场/准予使用。附件:1、材料出厂质量保证书【】2、材料自检试验报告【】施工单位签字:日期:材料名称材料来源、产地材料规格用途(使用在何工程或部位)本批材料数量施工单位试验试样来源取样地点、日期试验日期、操作人试验结果致(施工单位):经抽检复查试验的结果(附监理工程师抽验报告〖〗)表明,这些材料符合〖〗/不符合〖〗合同技术规范要求,可以/不可以进场。你单位这些材料试验结果符合〖〗/不符合〖〗合同技术规范要求,可以/不可以在上述工程部位上使用。试验监理工程师签字:日期:四川省内江至遂宁高速公路监理细则分项工程施工主要人员报验单施工单位:合同号:施工段号:监理单位:编号:A-14-□□□-□□□□致(专业监理工程师):下列人员已按要求进场,请予以审查。施工单位签字:日期:姓名拟承担岗位职称工作年限备注监理意见:专业监理工程师签字:日期:四川省内江至遂宁高速公路监理细则进场设备报验单施工单位:合同号:施工段号:监理单位:编号:A-15-□□□-□□□□致(专业监理工程师):下列施工设备已按合同规定进场,请你查验签证,准予使用。施工单位签字:日期:序号设备名称规格型号数量进场日期技术状况拟用何处致(施工单位):经查验1、性能、数量能满足施工需要的设备:(准予进场使用的设备)2、性能不符合施工要求的设备:(由施工单位更换后再报的设备)3、数量或能力不足的设备:(由施工单位补充的设备)请你尽快按施工进度要求,配齐、配足所需设备。专业监理工程师签字:日期:四川省内江至遂宁高速公路监理细则施工方案及主要工艺报审表施工单位:合同号:施工段号:监理单位:编号:A-16-□□□-□□□□致(总监理工程师):现报上工程(桩号)的施工方案及主要工艺,详细详见说明和图表,请予审查和批准。附件:施工方案及主要工艺说明和图表。施工单位签字:日期:专业监理工程师审查意见:专业监理监理工程师签字:日期:总监理工程师审查意见:总监理工程师签字:日期:四川省内江至遂宁高速公路监理细则专项安全、文明(环保)施工方案报批单施工单位:合同号:施工段号:监理单位:编号:A-17-□□□-□□□□致总监理工程师:由我项目部承担施工的的施工安全、文明(环保)施工方案已编制完毕,请予以审批。附件:安全、文明(环保)生产保障体系和措施施工单位签字:日期:初审意见:专业监理工程师签字:日期:审查意见:驻地监理工程师签字:日期:审批意见:总监理工程师签字:日期:四川省内江至遂宁高速公路监理细则检验申请批复单施工单位:合同号:施工段号:监理单位:编号:A-18-□□□-□□□□工程名称工程地点及桩号具体部位检验内容要求到现场检验时间:施工单位递交日期、时间和签字:驻地办收到日期、时间和签字:现场监理人员评论和签字:本项目可以继续进行:质量证明附件:监理工程师签字:时间:施工单位收到日期、时间和签字:四川省内江至遂宁高速公路监理细则工序检查报验单施工单位:合同号:施工段号:监理单位:编号:A-19-□□□-□□□□致驻地办:我部已完成(工序)施工,经自检合格,请监理工程师检查,以便进行(下一道工序)施工。附件:(检查资料等)施工单位(签字):质检工程师:日期:年月日测量监理工程师检查意见:测量监理工程师:日期:年月日材料监理工程师检查意见:材料监理工程师:日期:年月日现场监理工程师检查意见:现场监理工程师:日期:年月日四川省内江至遂宁高速公路监理细则下承层检验申请批复单施工单位:合同号:施工段号:监理单位:编号:A-20-□□□-□□□□工程名称申请检验桩号右列处理工作已完成者画“√”1、表面清扫;2、蜂窝、松散处理(基层);3、透层、下封层或桥面粘层损坏处理修补;4、被污染的沥青层上洒粘层沥青;5、裂缝位置桩号及处理措施。检测内容现场检查、签认下承层质量,以便开展后续施工要求到现场检验时间:施工单位递交日期、时间和签字:驻地办收到日期、时间和签字:现场监理人员评论和签字:本项目可以继续进行质量证明附件:监理工程师签字:时间:施工单位收到日期、日期和签字:四川省内江至遂宁高速公路监理细则混凝土浇筑申请报告单施工单位:合同号:施工段号:监理单位:编号:A-21-□□□-□□□□工程名称桩号及部位混凝土标号工程数量申请日期预计浇筑时间图纸号材料名称存放点料场号含水量批准文号细集料粗集料水泥外加剂水—机具设备及数量机具设备备用量主要技工混凝土配合比试验单编号水灰比每立方米混凝土中各材料用量(kg)坍落度(mm)单位体积重(kg/m3)龄期(d)强度(Mpa)水泥细集料粗集料水外加剂施工配合比(kg/m3)水泥:砂:碎石:水:外加剂=::::水灰比坍落度(mm)振捣方式拌合方式监理意见:专业监理工程师签字:日期:四川省内江至遂宁高速公路监理细则施工单位月工作计划报告单施工单位:合同号:施工段号:监理单位:编号:A-22-□□□-□□□□工作计划日期:施工单位递交日期:时间:签名:总监办签收日期:时间:签名:计划施工项目开始时间完成时间技术人员桩号部位质检试验测量监理意见:总监理工程师签字:日期:四川省内江至遂宁高速公路监理细则施工单位每周工作计划施工单位:合同号:施工段号:监理单位:编号:A-23-□□□-□□□□工作计划日期:施工单位递交日期:监理收到日期:签字:签字:计划施工项目施工项目说明申请监理安排桩位部位日期检查试验测量监理工程师意见:监理工程师签字:日期:四川省内江至遂宁高速公路监理细则监理巡视记录施工单位:合同号:施工段号:监理单位:编号:A-24-□□□-□□□□施工单位合同号巡视监理日期起始时间终止时间巡视范围、主要部位、工