贵州省公路工程预算补充定额——钢桥面铺装预算定额(试行)目录贵州省公路工预算补充定额——钢桥面铺装预算定额第二章路面工程说明…………………………………………………………………………………………………………12-2-20喷砂除锈··················································································32-2-21洒布环氧沥青粘结层·······································································42-2-22喷涂环氧富锌底漆防水层··································································42-2-23浇注式沥青混合料拌合·····································································52-2-24浇注式沥青混合料运输·····································································62-2-25浇注式沥青混合料铺筑·····································································72-2-26浇注式沥青混凝土桥面接缝处理····························································82-2-27浇注式石屑撒布机撒布沥青预拌碎石·······················································82-2-28环氧沥青混合料拌合·······································································92-2-29环氧沥青混合料运输······································································102-2-30环氧沥青混凝土铺筑······································································112-2-31环氧沥青混凝土桥面切缝处理·····························································122-2-32环氧沥青混凝土桥面加速养护·····························································13附录一贵州省公路工程机械台班费用补充定额····················································14附录二新增材料代号、单位重、损耗、基价表····················································161第二章路面工程说明一、本定额是按照合理的施工组织和一般正常情况下的施工条件编制的。定额所采用的施工方法和工程量标准,是根据国家现行的公路工程施工技术及验收规范、质量评定标准及安全操作规程取定的,除定额中规定允许换算外。二、运输环氧沥青混合料、Cooker车运输浇注式沥青混合料定额项目:(1)Cooker车正常情况下装、运输、卸浇注式沥青混凝土在浇注式沥青混凝土搅拌器(cooker)中应控制在2小时30分钟以内。(2)环氧沥青混合料运输车正常情况下装、运输、卸应控制在50分钟以内。(3)本定额的编制是按照平均运距在15km以内的混合料运输编制的,当平均运距超过15km,应按社会运输的有关规定计算其运输费用。三、浇注式沥青路面、环氧沥青路面定额中,均未考虑为保证石料与沥青黏附性而采用的的抗剥离措施的费用,需要时应根据石料的性质,按设计提出的抗剥离措施,计算其费用。四、本定额系按一定比例的油石比编制的。当设计采用的油石比与定额油石比不同时,可按设计油石比调整定额中的沥青用量。换算公式如下:(注:浇注式沥青混凝土定额编制的油石比8.2%、环氧沥青混凝土定额编制的油石比6.5%),如果编制预算文件时油石比可根据情况进行抽换。iid=dLSSLiS——————按设计油石比换算后的沥青数量dS——————定额中的沥青数量dL——————定额中标明的油石比iL——————设计采用的油石比五、浇注式沥青混合料、环氧沥青沥青混合料的定额中,均已包括混合料拌合、运输、摊铺作业时的损耗因素。路面实体按路面(或桥面)设计面积乘以摊铺厚度计算。2六、由于浇注式沥青混合料对拌合温度要求高的特点,即使选用沥青拌合设备生产能力(240t/h以内)浇注式沥青混合料的生产能力也在60t/h左右。本定额的编制是按照选用拌合设备的生产能力为(240t/h以内)沥青拌合设备进行编制,如施工单位选用其它生产能力的拌和设备,在编制概预算可根据实际情况对拌和设备进行抽换,并对拌和设备的台班按下表中的系数调整。选用沥青拌合设备生产能力(t/h)240以内320以内调整系数10.76七、环氧沥青混凝土桥面加速养护定额应用范围:施工后外界温度低于20度情况下或者冬季施工完后根据施工的具体需要为了使环氧沥青混凝土快速、充分固化需要进行加速养护,编制概预算时才套用该定额,其他情况不得套用。八、本定额适用于钢桥面铺装、同时也适用于水泥混凝土桥面铺装、及路面工程。32-2-20喷砂除锈工程内容:清理钢桥面、装、运钢砂、钢丸、喷砂处理、清扫散落的钢丸及钢砂单位:1000m2序号项目单位代号行车道喷砂除锈人行道喷砂除锈121人工工日176.034.32钢丸kg10032715.4715.43钢砂kg10033306.6306.6420D喷砂除锈机台班1981--1.10580D喷砂除锈机台班19822.73--6250KW柴油发电机组台班18000.870.337小型器具使用费元1998--7.128手动打砂机台班19830.59--9其他材料费元99626.71.310基价元1999176121074542-2-21洒布环氧沥青粘结层工程内容:清理桥面、喷洒环氧沥青、沥青撒布车洒油单位:1000m2序号项目单位代号喷洒环氧沥青防水粘结层0.68L/m2喷洒环氧沥青粘结层0.45L/m2121人工工日11.61.02环氧沥青kg854742.000489.0003沥青洒布车台班11951.581.044其他材料元99625.325.35基价元199936376240782-2-22喷涂环氧富锌底漆防水层工程内容:搅拌环氧富锌底漆、喷涂环氧富锌底漆单位:1000m2序号项目单位代号喷涂环氧富锌底漆11人工工日11.42环氧富锌底漆L10034171.363固化剂L1003542.844小型器具使用费元1998835.05基价元1999229652-2-23浇注式沥青混合料拌合工程内容:沥青加热、保温;装载机铲运料、上料,配料;冷料运输;石料加热、烘干、筛分;加入矿粉;沥青输送;拌和、出料单位:1000m3顺序号项目单位代号浇注式沥青混合料拌合设备生产能力(t/h)60吨/h以内11人工工日1147.002浇注式沥青混合料m3---(1030)3SBS改性沥青t852192.8104砂m389728.725机制砂m31003628.726矿粉t949658.3607添加剂Kg100373856.009路面用碎石(1.5cm)m3965533.279其他材料费元996191.710设备摊销费元99715333.4113m3以内轮胎式装载机台班105111.2912240吨/h以内浇注式沥青拌合设备台班120610.2614基价元1999156644062-2-24浇注式沥青混和料运输工程内容:等待、装、运、卸、空回单位:1000m3桥面实体顺序号项目单位代号载货汽车质量(t)第一个1km每增运0.5km平均运距(km)10以内12120t浇注式沥青混凝土搅拌运输车台班138014.051.232基价元199937458328072-2-25浇筑式沥青混凝土桥面铺筑工程内容:人工摊铺:吹尘、清理防水粘结层;接料、推料、卸料人工找平;人工洒布已预拌好的沥青碎石。机械摊铺:人工放线、画标线;涂抹色拉油、边侧限制;吹尘、清理防水粘结层;机械摊铺浇注沥青混合料;人工找平;等待一小段时间移开边侧制;人工检查、并消除气泡。单位:1000m3桥面实体顺序号项目单位代号人工摊铺浇注式沥青混凝土机械摊铺浇筑式沥青混凝土浇注式沥青混合料拌和设备60吨/h以内细粒式细粒式121人工工日11683.0299.224.1m以内浇筑式沥青混和料摊铺机台班1215--11.503其他材料费元996--581.185小型机具使用费元9988.7102.06基价元1999828046532682-2-26浇筑式沥青混凝土桥面新旧接缝处理工程内容:取、运贴封条;贴好贴缝条;喷枪热熔;抹子磨平单位:100m顺序号项目单位代号新旧接缝处理11人工工日10.42贴缝条m10038100.003其他材料费元99647.24基价元19998652-2-27浇注式石屑撒布机撒布沥青预拌碎石工程内容:石屑撒布机撒布碎石;人工补撒单位:100m2顺序号项目单位代号撒布沥青预拌碎石(5mm~10mm)11人工工日10.12浇注式石屑撒布机台班11840.043沥青预拌碎石Kg100392.004基价元199931592-2-28环氧沥青混合料拌合工程内容:环氧沥青、保温、输送;装载机运料、上料、配运料;矿料加热烘干;拌和、出料单位:1000m3顺序号项目单位代号环氧沥青混合料设备生产能力(h)240t以内11人工工日136.52沥青混凝土混合料m3—(1100.00)3环氧沥青t854172.8004砂m3897241.185矿粉t949212.686路面用碎石(1.5cm)m3965603.737其他材料费元996191.78设备摊销费元9972112.592m3以内轮胎式装载机台班10504.3110240t/h以内的拌合设备台班12062.1011基价元19998355294102-2-29环氧沥青混合料运输工程内容:等待、装、运、卸、空回单位:1000m3桥面实体顺序号项目单位代号自卸汽车质量(t)15t以内第一个1km每增运0.5km平均运距km10以内12115t以内自卸汽车台班138810.11.02基价元19995640547112-2-30环氧沥青混凝土铺筑工程内容:清扫整理桥面(或路面);机械沥青混合料摊铺;找平碾压;初期养护单位:1000m3桥面实体顺序号项目单位代号机械摊铺环氧沥青碎石混合料混合料拌合设备生产能力(t/h)240t以内细粒式11人工工日196.9216~20t轮胎压路机台班12231.68312~15t光轮压路机台班10783.3646m以内沥青混合料摊铺机台班12121.435侧喂料机台班12221.436其它材料费元996940.07基价元199951491122-2-31环氧沥青混凝土桥面切缝处理工程内容:准备工作;切缝;清理废料;运走单位:100m顺序号项目单位代号切缝处理11人工工日12.12道路养护车台班12600.903其他材料费元99674.94小型器具使用费元199874.95基价元19991000132-2-32环氧沥青混凝土桥面加速养护工程内容:养护准备、正式养护、养护设备转移单位:100m2顺序号项目单位代号环氧沥青混凝土加速养护11人工工日11.542设备摊销费元99793503其他材料费元99628274基价元19991230014附录一贵州省公路工程机械台班费用补充定额代号198119821983122