预制装配式基础防腐设计方案探讨-薛峰

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

27200812   QINGHAIELECTRICPOWER Vol.27 Dec.,2008  :(1975-),,,。:2008-08-28 , ,(,810008) :—±500kV,,,,,,。(),。:; ; ; ; :TM726:TU57   :B   :1006-8198(2008)-0004-03ProbeofPrefabricatedAssemblyFoundationAnti-corrosionDesignSchemeXUEFeng,TONGWu,WEIZhan-yuanAbstract:Thenaturalconditionof±500kVQinghai-TibetDCinterconnectingtransmissionengineeringpassingar-easisratherinferior,inordertomeettherequirementofthetimelimitfortheproject,andensuretheconcretequali-tyofwinterconstruction,aswellasreducethefieldmanualworkandimprovetheefficiencyofconstruction,somepartsoftheengineeringconsiderstoadoptthereinforcedconcreteprefabricatedassemblyfoundation.Thepapermakesanalysisandstudyonthedifferentcorrosiondegreeoftheregion'sbaseearthandgroundwaterorice,andproposesprefabricatedassemblyfoundationanti-corrosiondesignschemeandconstructionmeasures.Keywords:transmissionline; prefabricatedassemblyfoundation; metalcomponent; anti-corrosion; con-crete  —±500kV,(),,(),,(),、。1 1.1 (0.2~0.3mA/m2)、(pH8.5~9)、(CL-/OH-≥0.63)。。3,、、()。DOI:10.15919/j.cnki.qhep.2008.s1.016:。:,,(),,。,,。1.2 ,,。,。,K+、Na+、Ng2+。1500mg/L,(H+、NH4+、CL-、CO32-)。,DustanR=(CaO)FeO3,R0.75。,,(、),Dustan,,,。1.3 ——(K、Na),—。,,。—,,。。,。,,,、、—。2 、、,,,C40,1。图1 预制装配式基础型式图3   ,、,、、。《》,。3.1   1)、。、:、≮120μm;≮50μm。:、≮150μm;≮120μm。2)5   27,:≮120μm,≮100μm。、、,,,。《》,,、、,。、、、、、,IPN8701、EPN、IPN87103。3、、、、、、、,,5500m、±60℃、。3.2 (,GFRPFRP)、、。,。1)。:、3mm,2mm。2)。:、3mm,2mm。3),,,6mm。3.3 1),、。C35,≮50mm。:≯0.4,、≯0.45;,。2)、。,。3)、,,0.5~1.0cm,。,JS-、、、,。JS-A、B,AB。A(-NCO),;B。、,、,、、。,AB1:2,,,24h。4 ,,,,《》、、、,,。:〔1〕GB50021-2001,岩土工程勘察规范〔S〕.2001〔2〕GB50021-2001,工业建筑防腐蚀设计规范〔S〕.2001〔3〕徐攸在.盐渍土地基〔M〕.北京:中国建筑工业出版社,1993〔4〕雷华阳.青海达布逊湖区氯盐渍土的渗透性研究〔D〕.长春:长春科技大学,1997〔5〕高民欢,李斌,金应春.含氯盐和硫酸盐类盐渍土膨胀特性的研究〔J〕.冰川冻土,1997,(4)〔6〕傅世法,郑云生.察尔汗盐湖盐渍土地基工程性能研究(内部资料)〔Z〕.1985.3(3)6

1 / 3
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功