CommissioningPlanAddendumforHVACSystem暖通系统调试方案补充方案--CommissioningPlanforVRVACSystemVRV空调系统调试方案VRVsystemcommissioningwillbeconductedbyDaikinCompanyafterformalenergizing.本装置VRV系统调试由大金空调公司在正式通电后统一进行.1.Preparationbeforecommissioning调试前准备工作1.1Befamiliarwithdesigndrawingsandthewholeprocessofauto-controlsystem熟悉设计图纸,弄清自动调节系统的全过程;1.2Preparenecessarycommissioninginstrument,toolsandrecords.备好调试所需要仪器仪表、必要的工具和有关记录事宜;1.3Preparepowersupply.准备好动力电源。2.Preparationbeforesystemrunning系统运转前的准备2.1Checkmodelandspecofinternalandexternalunitsperdesign.核对室内外机型号、规格与设计相符2.2Checkiftheyaresecurelyfixed.检查紧固部位是否牢固,2.3Checkifthere’reprotectionandsafetyprecautionsatelectricareas.电气部位应有防护和安全措施。3.Electricinspection电气部分检查3.1Checkifthemodelsofstartingrelayandcurrentoverloadrelayareaccurate.检查起动继电器及电流过载器型号是否正确;3.2Checkifthemodelandcurrentofmainswitchforcircuitbreakermeetrequirementsforfullloading.检查总断路开关型号及电流是否满足设备满载要求;3.3Checkcontrolcircuit检查控制回路;3.4Checkifallconnectingscrewsaresecurelyfixed.检查所有接线螺丝是否牢固;3.5Conductinsulationtestforincoming/outgoingwirestospecifications.检查进/出接线进行绝缘测试,并达到规范;3.6Checkifcontrolloopofpowersupplyandprocedureofstartingtestareaccurate.检查供电控制回路,测定起动程序是否正确;3.7Emergencyshutdownmustbewellundercontrol.紧急停止控制必须正确、良好。4.Inspectionofinternalandexternalunits室内外机检查4.1Checkifthemodelsofinternalandexternalunitsareaccurate.检查安装室内外机型号是否正确;4.2Checkifpipeinstallationisaccurate.检查管道安装是否正确;4.3Checkifpowerandsignalwiresareconnectedcorrectly.检测电源线、信号线接线是否正确;4.4Removewastefrominternalandexternalunits.清理室内外机垃圾杂物确保无碍物;4.5Checkiffilteringscreenisinstalledcorrectly.检查过滤网安装是否妥善;4.6Checkifdrainageofcondensatedwaterissmooth.检查冷凝水排水是否流畅;4.7Checkifinsulationisfreeofdamage.检查保温确保无损;4.8Checkifcurrentandvoltagearenormalyet.检查及测定供电电压、电流是否达到正常;4.9Checkiftempcontrolswitchisundergoodcondition.检查温度控制开关是否正常;4.10Checkthespeed(fast/slow)ofinternalfanisnormal.检查室内风机快、慢速是否正常;4.11Checkvibrationandnoiseofinternalunit.检查室内机震动及噪音;4.12检测出/入风温度、风速;5.Thoroughcommissioning.Seeattachedtablefortestdescriptions.进入全面调试阶段,测试内容见附表.