句容水库除险加固工程监理总结2009年2月至2010年月日监理单位:南京水建水利建筑工程监理有限公司总监理工程师:余向东编写日期:2010年月日目录一、工程概况·············································二、参见单位·············································三、工地机构人员·········································四、工程大事记···········································五、工程质量控制·········································六、工程进度控制·········································七、工程投资控制·········································八、安全生产情况·········································九、信息管理·············································十、工程质量评价·········································十一、设计变更···········································十二、监理合同履行情况···································十三、经验与建议·········································一、工程概况句容水库位于句容市东北丘陵区,秦淮河支流句容河上游,属长江流域。汇水区域为山丘区,集水面积45.8km2流长15.2km,干流比降J=0.00375.总库容为2859×104m3正常水位27.30m,汛限水位26.50m,死水位22.00m,设计洪水位28.80m,校核洪水位30.44m.为全国防洪重点中型水库。始建于1958年。2007年5月16日镇江市水利局、句容市水利农机局组织有关专家对句容水库进行了大坝安全鉴定,鉴定结果为三类坝;2008年1月2日水利部大坝安全管理中心对句容水库安全鉴定成果进行了复核,以坝涵【2008】40号文同意“三类坝”鉴定结论意见。我院于2008年7月编制完成《句容水库除险加固工程初步设计》(修订本)并上报水利部长江委员会,“长委”于2008年9月下达了“关于印发镇江句容市句容水库除险加固工程初步设计的复核意见的函”。水库大坝总长920m,现状坝顶高程31.60m,顶宽6m,最大坝高11.40.现有正常溢洪道一座,闸底板标高26.10m,闸孔净宽3×3m。高低涵各一座,低涵为直径0.9m的圆涵,进口底高程20.57m;高涵为直径0.5m圆涵,进口底高程24.05m。工程主要结构形式大坝工程:防渗处理:多头小直径搅拌桩,成墙有效厚度0.30m,最大深度15.25m。工段:0+015至0+587,0+600至0+730,长700.2m,根据室内试验结果调整水泥掺入量,但不小于15%,要求室内水泥土无侧限抗压强度不小于1200kpa(28天龄期),截渗墙现场取芯;无侧限抗压强度不小于600Kpa,要求渗透系数达1E—6cm/s以下。迎水面:0+016至0+613:现有护坡保留,高程24.5至24.00整修、砼灌实、勾缝,24.50至26.00m现浇砼面层120厚,高程26.00m以上C25砼找平、座浆,再铺设砼预制块140厚。每30.40m设一道砼横隔梗,高程24.5、26.0各设一道纵向砼隔梗。管理区临库侧新建护坡。底高程24.50,顶高程31.50,26.00m以上采用砼预制块。0+613至0+804护坡整理。底高程25.00—26.30m,顶高程约31.40,C25砼找平,面层采用砼预制块加固,底部新设砼隔梗。0+804—0+900非常溢洪道段坝体加高培厚新建护坡。底高程26.30—30.50m,顶高程约31.40m,面层采用浆砌块石。坝顶:现有上下游浆砌石挡墙、砼路面拆除,设计坝顶路面高程31.25m(路面标高),新建沥青路面。坝顶总宽度7.5m,坝顶道路为公路四级标准,路面净宽6.0m,上游新建钢筋砼挡浪墙顶高程32.20m,下游设绿化带及截水槽。上坝道路按四级公路设计,路面净宽6.0m,路基宽6.5m。坝顶道路总长920m,上坝道路长1214m.背水坡:背水坡基本保持现有坡面,但进行统一平整、修坡,高程26.00m平台以上不陡于1:2.4,平台以下1:3.0,调整后平台宽3.50m,背水坡全面种植四季常绿的草皮护坡。高程26.0m平台内侧设一纵排水沟、坡面每50m设一道横排水沟,均采用250×250钢筋砼预制。坝脚、护坝地设总汇水沟。采用600×600—800浆砌石型式,坝脚排水沟坝体侧设排水孔,有贴坡排水反滤直接接排水孔,无贴坡排水处通长设反滤。背水坡设一道净宽1.0m彩色道板巡查便道,长400m,溢洪道岸坡巡查便道289.4m。坝脚设贴坡式排水体,顶高程23.40m,底高程21.00m,总厚750mm,长412m。护坝地:0+100—0+522现有护坝地整修,树木取消,近坝侧高程21.00m,渔塘侧高程20.70m,总宽15m。渔塘边坡修整至1:1.5,并护砌,采用简易反滤总厚550mm,长384m.并将拆除块石部分抛掷塘底护岸。坝体土方:基本保持现状,非常溢洪道段除外。非常溢洪道废除,按坝体达标,顶高程31.25m,总宽7.5m,迎水面背水面边坡均为1:2.5,背水坡填塘至29.00m,平台宽12m。0+624.5至0+711.5计87m护坝地达标后下游渔塘全部利用弃渣填实,面层1m采用弃土填。溢洪道工程正常溢洪道:原址拆除重建,3孔,每孔净宽3m,底高程25.00m,上游设半圆弧悬臂式翼墙,闸室为宽顶堰堰型,下接泄槽、消力池、护坦,总长136.78m,护坦下接出水渠,出水渠护砌长度270.23m,溢洪河清淤拓浚50m。跨渠渡槽一座。口门处理一处。进口段:铺盖长12.02m,两侧采用圆弧翼墙,悬臂式钢筋砼挡墙结构,一侧长13.98m,净挡土高度5.45m,底板宽6.6m,厚0.8m,墙身厚0.4~0.7m;远岸墙端翼墙也为圆弧,净挡土墙高度1.4m,底板宽1.8m,厚0.4m,墙身厚0.4m。进口段铺盖采用钢筋砼,厚0.45m,宽24.9~8.8m。控制段:闸室为开敞式宽顶堰无胸墙结构,采用钢板直升闸门控制、卷扬式启闭机,3孔×3m,底板顶高程25.00m,闸室底板顺水流方向13m,垂直方向12.8m。闸室采用整体钢筋砼型式,底板厚1.2m,中墩厚1.0m,边墩0.9m,交通桥面厚0.4m。闸上游设净宽1.26m工作桥、排架、启闭机房约350m2,下游设交通桥,桥宽6m。泄槽、消力池段:泄槽自闸室高程25.00始至消力池底13.70m终,坡比1:3.5,总长39.55m,净宽11.0m,采用钢筋砼U型结构,底板厚0.9m,侧墙挡土高度4.44至7.30m,墙顶厚0.4m,底部厚0.7—1.0m。消力池底高程13.70m,池深2.3m,池长27.0m,钢筋砼U型结构,底板厚1.1m,侧墙厚顶至底0.4—1.0m。泄槽、消力池及下游护坦侧墙顶部设安全栏杆。护坦、出水渠段:消力池后接拐弯段,因此护坦也采用钢筋砼U型结构,护坦长45.17m(包括弯道20.17m,直线段10m,扭坡段15m),底高程16.00m。其中扭坡采用浆砌块石直墙渐变至1:2.0护坡,其它段U型槽净宽11.0m,侧墙挡土净高7.0m,墙厚顶至底0.4至0.7m厚。扭坡后接出水渠,共长270.23m,全线浆砌石护砌,底宽11.0m,边坡1:2,口宽31m。底高程自16.00至15.00m。溢洪河:出水渠下游溢洪河50m按出水渠断面清淤、拓浚。非常溢洪道:废除现非常溢洪道,原有护砌拆除抛至填塘土方外坡脚,所处坝段按坝体标准断面达标。输水涵洞工程:现有高、低涵拆除,高涵无灌溉要求拆除后按坝体土方填筑标准,重建低涵,进口底高程不变为20.57m,洞身采用钢筋砼方涵,净尺寸1.2×1.8m,洞身长66.94m,出口设消力池,接现有出水蓄水池,出口处分水闸拆建、并增设管道部分护砌。高涵:高涵处于坝体东端,与低涵相隔不及40m,现已无灌溉要求,所有建筑物拆除砌底,按设计坝体土方封堵、达标。低涵:低涵也处于坝体东端,坝体处落于基岩上,本次拆除后新建。原低涵进口底高程20.57m,砼圆管,最大埋深10.23m,涵管直径0.9m,洞身长49.8m,进口浆砌石八字墙,出口浆砌石消力池、蓄水池、分水工程,工程总长度126m,塔式启闭,井简高度10.33m,上设启闭机房,栈桥联结。现有进口消力池、分水闸全部拆除。新建低涵进口底高程20.57m,钢筋砼方涵。进口浆砌石八字墙,长9m。塔式启闭,井简高度11m,上部设启闭机房,设2台100KN螺杆式启闭机,要求闭门力不小于40kn。利用栈桥连接,桥长5.0m。洞身采用钢筋砼方涵,最大埋深8.53m,净尺寸B×H=1.2×1.8m,洞身长66.94m(含井简),方涵底板厚400mm,其它壁均厚350mm。出口消力池拆除重建,新建消力池总长10m,深0.74m。接蓄水池长约33.5m,现有浆砌石护砌,进行整修后接分水闸。二、参建单位1、建设单位:句容市中型水库除险加固工程建设处2、设计单位:镇江市工程勘测设计研究院3、监理单位:南京水建水利建筑工程监理有限公司4、施工单位:南京润盛建设集团有限公司三、工地机构人员组成总监理工程师:余向东总监理工程师代表:王金文专业监理工程师:王涛专业监理:程育伟、李国强、姚惠忠检测见证员:陈飞飞四、工程大事记1、2009年1月23日句容水库除险加固工程开工。2、2009年2月11日召开低涵围堰方案专家评审会。3、2009年2月22日与施工单位签廉政合同。4、2009年3月23日省水利厅、镇江水利局、句容市市长、句容水利局有关领导来工地视察。5、2009年4月27日省质检、省安检来工地检查工程质量、安全。6、2009年6月9日省水利厅、镇江水利局质量监督站、句容市水利局来工地视察。7、2009年6月11日省水利水建质检站来工地检测水下工程质量。8、2009年6月17日省质检站、镇江水利质检站有关领导来工地检查工作。9、2009年7月3日句容水库除险加固工程水下验收。10、2009年8月28日镇江市水利局扩大内需办公室有关领导来工地检查。11、2009年9月15日句容市、镇江水利局领导来工地安全检查。12、2009年9月16日句容市市长、句容水利局局长来工地安全检查。13、2009年9月22日省厅扩大内需办公室领导来工地检查工作。14、2009年10月16日由水利部门组织的水库蓄水安全鉴定专家组到工地现场进行实际检查、勘探。15、2009年10月17日大坝蓄水安全鉴定会议在句容宾馆开幕,建设单位、监理单位、施工单位、设计单位列席会议并作汇报。五、工程质量控制(一)工程质量控制单元划分:句容市句容水库除险加固工程5个单位工程(溢洪道工程、涵洞工程、坝体加固工程、溢洪道启闭机房、管理房工程),29个分部工程,189个单元工程及启闭机房、管理房工程中的若干分项。分部工程统计如下(共计29个):溢洪道工程含上有连接段,闸室段,闸门、启闭机及电气设备,下有连接段,渡槽5个分部工程;涵洞工程含涵洞洞首,洞身,启闭机及附属设施,闸门、启闭机及电气设备安装,下有连接段,分水闸及其启闭机安装,高涵拆除封堵7个分部工程;坝体加固工程含迎水坡,坝体防渗,坝顶道路,背水坡防护,观测及附属设施5个分部工程。溢洪道启闭机房含地基与基础,主体结构,装饰装修,建筑屋面,建筑电气及自动化,给、排水6各分部工程;管理房工程含地基与基础,主体结构,装饰装修,建筑屋面,建筑电气及自动化,给、排水6各分部工程。(二)质量控制1、施工阶段工程建设监理质量控制任务:通过对施工过程、完工