目录目录..............................................................................................................................................11工程概况...................................................................................................................................11.1设计概况..........................................................................................................................11.2地形地貌..........................................................................................................................11.3气象水文..........................................................................................................................22总体施工方案.........................................................................................................................22.1施工顺序..........................................................................................................................32.2工艺流程..........................................................................................................................32.3测量放样.........................................................................................................................32.4基坑开挖..........................................................................................................................42.5试验检测.........................................................................................................................42.6基础及边墙施工...........................................................................................................42.7涵背回填..........................................................................................................................62.8防水层施工及质检.......................................................................................................62.8.1防水层施工.............................................................................................................62.8.2防水层质量检查.................................................................................................82.9沉降缝施工....................................................................................................................82.10附属工程.......................................................................................................................93质量保证措施.........................................................................................................................94安全施工措施......................................................................................................................104.1施工现场安全措施....................................................................................................104.2供电与电器设备安全措施.....................................................................................114.3涵洞工程施工安全措施..........................................................................................124.4基坑开挖防护安全措施..........................................................................................125施工环保措施......................................................................................................................141XXX涵洞施工1工程概况1.1设计概况XXX涵洞为1-1.5m钢筋混凝土框架箱涵,涵洞与线路中线夹角90°,涵长18.1m。孔跨形式为1-1.5m,共6涵节。出、入口均为八字式翼墙,钢筋混凝土框架箱全部采用现浇的方法。涵洞主要用途为:排洪。主要建筑材料:涵身采用C35钢筋混凝土,主筋为HRB400钢筋。出入口翼墙基础、泄床采用C30混凝土。翼墙墙身采用C30混凝土。帽石采用C30混凝土。防水层及沉降缝:参照《蒙华肆桥施(涵)参-V》。涵洞基础大于等于50cm时模板采用钢模现场拼装,其余基础小于50cm时模版采用竹胶板方木现场拼装。涵身顶板(盖板)底面采用竹胶板组拼,涵身采用钢模板拼装。模板系统由外模、内模、底模、端模等组成。箱涵边墙内、外模采用大块平面钢模板,钢模板尺寸为1×1.5m,钢模板设置Φ16拉杆孔,顶板、上下倒角模板、端模板均采用高强度1.5cm厚大块竹胶板。内外模板间采用Φ16的拉杆进行连接,拉杆间距按水平0.5米,竖向0.5米布置。在钢模板外拉杆孔位置,并排两道水平钢管作为勒板,拉杆两端各使用两个山型卡和螺帽扣紧勒板钢管。立杆为Φ48×3.5mm满堂钢管脚手架,立杆底部支立在底托上,顶部通过安装可调节顶托来调节尺寸;立杆纵向间距均为0.9m,横向间距为0.9m,步距上下层为0.6m,其余为1.2m。在顶托上横桥向布设10×10cm的方木作为分配梁,其上纵桥向布置间距30cm的5×10cm的方木,作为底板下背肋。1.2地形地貌低山区地貌,沟谷较发育,地形起伏较大,植被较发育,多为杂草及2灌木,交通较不便利。1)地层岩地表为厚度不等的Q3的黏质黄土(可塑、硬塑)和粗圆砾土(密实、饱和)。本段下伏为E泥质粉砂岩(弱风化)。2)地震动参数地震动峰值加速度为0.10g,地震动反应谱周期0.45s。3)不良地质及特殊岩土本段路基为III及自重湿陷性黄土,需加强给排水和地基处理。1.3气象水文地表水不发育,地下水弱发育。地表水、地下水均无化学侵蚀性。工点全段冻融破坏环境作用等级为D1,碳化环境作用等级为T2。年平均降雨量847.8mm,降雨主要集中在5~9月份,其中7月份单月降雨量最大。。2总体施工方案在基础开挖之前,按照图纸所示坐标及尺寸,放出箱涵中心线及基础开挖边线,并敷设临时水准点,作为涵洞施工过程高程控制依据,涵洞中心线应引至两端木桩上,以便随时进行中心线检查。测量放线成果须经监理工程师复核无误后方可进行下一步施工。基坑开挖:XXX涵洞基坑开挖深度为0.5~7m,基槽开挖按1:1进行放坡开挖,并且在基坑四周5m范围内不得堆载。采用挖掘机开挖,人工配合清底。四周设排水沟,汇入积水井处,水泵抽送坑外。模板设计:涵洞基础大于等于50cm时模版采用钢模现场拼装,其余基础小于50cm时模版采用竹胶板方木现场拼装,涵身采用钢模板拼装。支架设计:涵洞内采用满堂扣件式钢管支架,支架顶托顶横向设10cm×10cm方木,纵向设5cm×10cm方木作分配梁。边墙内模与外模用对拉螺栓固定。混凝土浇筑:框架涵分三次浇筑,第一次浇筑基础,第二次浇筑涵身,第三层浇筑顶板混凝土,基础混凝土达到设计强度的75%后,方可立模、浇筑涵身混凝土;涵身混凝土达到设计强度的75%后,方可搭设支架、铺模、绑扎钢筋、浇筑顶板混凝土。32.1施工顺序施工程序为:施工准备→测量放样→机械开挖→人工修整基底→抄平、测量放样→基底承载力检验→基础施工→涵身、顶板施工→混凝土养生、拆模→防水层施工→基坑回填→验收。2.2工艺流程框架箱涵施工工艺流程图2.3测量放样由测量队实地测放出涵洞位置、标高,测量过程中实行双检双核制度。先根据设计图纸及开挖坡度放出开挖桩并撒出开挖上口边灰线,经测量监理工程师现场核验后方可开始开挖。基坑底部的尺寸较设计平面尺寸每边各增加0.5-1m,以便于支撑、排水与立模板。测量放样时应选取经联测后符合要求的基准水准点和平面控制点为依据,测定基坑中心线、方向和高程。涵洞基坑临时放样点应在场地平整完成以后进行,临时平面点位应距离基坑开挖上边缘5m左右,并设置明显的施工准备测量放线机械开挖人工修整基底抄平、测量放样基底承载力检验加深基底基础施工涵身施工顶板施工混凝土养护、拆模防水层施工基坑回填N合格4标志,避免开挖和运输机械的破坏。根据测量放样的临时平面点,采用石灰粉等绘出基坑开挖的上口边线,基坑开挖交底中应明确开挖坡度,以便控制基底开挖边线满足施工需要。2.4基坑开挖1)按地质水文资料,结合现场情况,决定开挖坡度和支护方案、开挖范围和防、排水措施。2)