山东职业学院I毕业论文题目:高层建筑给排水管道工程技术系部:土木工程系专业:建筑设备工程技术班级:0931姓名:张四学号:200904043188指导教师:林清丽2011年12月25日山东职业学院II目录摘要············································································III一.给水排水系统的施工技术····················································III1施工前期准备···································································III2施工步骤。。。。。。。。。。······························································III3给水排水管道安装······························································III3.1给水管道的安装······························································23.2排水管道的安装······························································2二.对大型多层建筑消防给水系统及可靠性分析与研究·····················32.1、消防给水系统的分类······················································32.2按消防给水压力分类按消防给水压力可分为高压、临时高压和低压消防给水统··················································································32.3消防给水系统按服务范围分类············································3三、高层建筑消防给水的几种形式············································4四、消防给水方式的选择······················································4五.超高层建筑给水排水设计中的节能、节材研究····························55.1避难层集中设置报警阀······················································65.2屋面雨水落水管兼作喷淋末端试水排水管道。。。。。。。。。。。。。。。。。。。。·········。7。5.3冷却塔的设计及节能运行问题。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。··········7六.浅析居住小区生活消防共用给水系统。。。。。。。。。。。。。。。。。。。。。。。。。。。·········。86.1以某工程为实例。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。············86.2采用生活消防共用给水系统分析。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。··········8。七,排水管道下沉破坏的原因分析和对策。。。。。。。。。。。。。。。。。。。。。。。。。。·······97.1追究其下沉破坏的根本原因,我认为主要有以下几点原因···········9。7.2如何解决好以上问题的几点建议·········································。9。八.建筑给排水施工中的安全和质量管理··························108.1建筑给排水的分类。························································118.2给排水工程中的安全管理。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。···········118.3建筑给排水工程中的质量管理。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。············118.4严把分部分项工程质量评定关。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。·············12。8.5节水措施。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。···················129结束语··············································12谢辞··············································································13参考文献········································································13山东职业学院III摘要随着科学技术的发展,生产工艺的不断改进和提高,给水排水系统日趋向大系统、高参数的方向迅猛发展,因此,对给水排水工程的施工和运行管理的要求也就越来越高。要想使管网达到优质、高效和低能耗运行的目的,除要有合理的设计方案外,给水排水系统安装质量的优劣将会对Et后的使用产生极大的影响。为了确保民用给水排水在使用过程中充分发挥其安全稳定和高效的作用,一。给水排水系统的施工技术极其重要。1施工前期准备工作在施工安装前,应组织人员做好施工图会审,它是业主、施工人员进一步了解工程项目特征的重要环节。通过施工图交底,可以了解到设计者的设计意图,理解设计中所选用的新技术、新设备、新材料;通过会审,可发现设计中的缺陷、错误,解决存在问题,统一各方不同意见,理解本工程的难点、重点。总之,有效的施工图会审是项目施工的首要环节。2施工步骤根据现有文献-2和施工经验,给水排水管道安装一般按如下步骤进行:熟悉图纸和有关技术资料——施工测量放线——沟槽开挖及管沟砌筑——配合土建预留孔洞及预埋铁件——管件加工制作——支架制作及安装——管道预制及组成——管道敷设安装——管道与设备连接——自控仪表及其管道安装——试压及清(吹)洗——防腐和保温——调试和试运转——竣工验收。山东职业学院23给水排水管道安装3.1给水管道的安装。(1)管道安装之前需复测管道地沟,支架是否符合管道安装的标高、坡度和坡向。支架间距是否符合图纸和有关规范的要求,同时要考虑到放空和管道运行的工艺需要。(2)法兰焊缝及其他连接件的设置应便于复检,并不得紧贴墙壁、楼板或管架。(3)管道安装施工过程中及完工后,应及时填写各种施工技术资料表格并经签证记录,埋地铺设的管道,应做好试压试验,办理隐蔽工程验收,填写隐蔽工程记录并及时回填,这些施工技术资料均应整理存档。(4)管道穿越剪力墙、梁适宜预留钢套管,但穿越楼板、砖墙、基础和屋面的管道可用塑料套管或预留洞,穿过屋面的管道应有防水层(或土建泛水)和防水帽,管道和套管之间的间隙宜用不燃材料填塞。(5)管道安装工作如有间断,应及时封闭敞开的管口(6)管道安装工作如有间断,应及时封闭敞开的管口。(7)管道连接时,不得用强力对口,也不得用加热管子及加偏垫等方法来消除接口端面的空隙偏差、错口或不同心等缺陷。(8)管子焊接时,直管段两环缝距不应小于100mill,焊缝距煨制弯头的起弯点不小于100mill,且均不小于管外径。3.2排水管道的安装。3(1)排水塑料管必须按设计要求及位置装设伸缩节,如设计无要求时,伸缩节间距不得大于4m.(2)排水主干管及水平干管管道均应做通球试验,通球球径不小于排水管道管径的2/3,通球率必须达到100%。(3)排水塑料管道穿越封闭空间内(如管井、厨卫内)宜增加阻火圈,非封闭空间,可以不加阻火圈(如外墙、阳台)。(4)生活污水塑料管道的坡度必须符合设计或规范要求。(5)在立管上应每隔一层设置一个检查口,但在最低层和有卫生器具的最高层必须设置检查口,其中心高度距操作地面为lm,允许偏差±20mm,检查口的朝向应便于检修,在暗敷立管上的检查口应安装检查门。(6)排水通气管不得与风道或烟道连接,安装应符合规范。4室内管道的布置管道的正确排列是管路安装中的一个重要环节,特别是对于室内管道。由于管道设备多,使问题尤为突出,现将管道排列间距山东职业学院3及避让的基本原则为:气体管路排列在上,液体管路排列在下;热介质管路排列在上,冷介质管路排列在下;保温管路排列在上,不保温管路排列在下;金属管路排列在上,非金属管路排列在下。管线间距的确定。管线的间距以利于对管子、阀门及保温层进行安装和检修为原则。由于室内空间较小,其间距不宜过大,对于管子的外壁、法兰边缘及热绝缘层外壁等管路最突出部位距墙壁或柱边的净距不应小于1OOmm.对于并排管路上的并列阀门的手轮,其净距约100mm.管路相遇的避让原则为:小口径管路让大口径管路;常温管路让高温或低温管路。二,对大型多层建筑消防给水系统及可靠性分析与研究2.1、消防给水系统的分类1.1按系统的构成和功能分类按系统的构成和功能可分为室内消火栓给水系统、室外消火栓给水系统和自动喷水灭火系统。1.室外消火栓给水系统基本设施为室外消火栓、室外消防水池和室外消防供水管网。灭火时,消防车从室外消火栓或室外消防水池吸水加压,从室外进行灭火,或者想室内消防给水系统加压供水。2室内消火栓给水系统该系统由室内消火栓、消防卷盘、高位消防水箱、增压稳压设施、消防水泵、室内消防水池、消防供水网等组成。灭火时,采用室内消火栓、消防卷盘进行灭火。3.自动喷水灭火给水系统自动喷水灭火系统的给水系统是指自动喷水灭火系统中报警阀前的管网和给水设施,主要包括消防水源、消防泵、消防转输泵和消防稳压泵、消防水箱、消防稳压设施水泵结合器等。2.2按消防给水压力分类按消防给水压力可分为高压、临时高压和低压消防给水系统。1.高压消防给水系统是指管网内经常保持灭火时所需的压力和流量,灭火时,不需要启动消防水泵加压而直接使用灭火设备的灭火系统。2.临时高压消防给水系统是指管网内最不利点周围平时水压和水量不满足灭火的需要,在水泵站内设有消防水泵,灭火时,需启动消防水泵,使管网内的压力和流量达到灭火时的要求的灭火系统,目前广泛采用的一种消防给水系统也属于临时高压消防给水系统,即管网有稳压泵和气压给水设备等增压设施经常保持足够的压力。在水泵站内设有消防水泵,灭火时,需启动消防水泵,使管网内的压力和流量达到灭火时的要求。2.3消防给水系统按服务范围分类1.独立高压(或临时高压)消防给水系统即每幢高层建筑均没置独立的消防给水系统,这种系统安全度高,但管理分散,投资大。到目前为止所建成的高层建筑的消防系统大多数采用这种系统。2.区域或集中高压(临时高压)消防给水系统即两幢或两幢以上的高层建筑共用一个泵房的消防给水系统。这种系统便于集中管理,山东职业学院4节省投资,但安全度较低。三、高层建筑消防给水的几种形式1高位消防水池供水形式这种供水方式是在高层建筑的屋顶设置大容量消防水池(水池的容积以灭火灾延续时间内所需要的全部消防用水),平时利用生活加压水泵将水一次抽升至屋顶消防水池贮存。当火灾发生时,直接依靠水池中的消防贮水通过室内消火栓给水系统和自动喷水灭火系统进行灭火。除因屋顶消防水池设置高度不够,需要在顶层设消防增压泵以满足建筑最高几层消防设施所需的压力外,无需再设消防专用水泵和相应的控制电器系统。2消防专用水泵~屋顶高位水箱供水形式这种供水方式是高层建筑消防给水设计中采用最多、最易接受的一种方式。在高层建筑屋顶设小容量的高位水箱,一般和生活用水合用,并且满足10min的消防用水量。在建筑物底层