定额编号名称单位基价人工材料机械GT1-1机械场地平整土方m³11.770.380.0311.36GT1-2机械场地平整亏方碾压m³4.810.720.034.06GT1-3机械主厂房土方m³25.611.550.0114.04GT1-4机械主要建筑物与构筑物土方m³19.796.58013.21GT1-5机械其他建筑物与构筑物土方m³18.315.12013.19GT1-6机械挖淤泥流砂m³15.420.98014.44GT1-7机械土方运距每增加1kmm³1.28001.28GT1-8机械淤泥运距每增加1kmm³1.32001.32GT1-9人工场地平整土方m³19.1618.3900.77GT1-10人工场地平整亏方夯填m³8.828.0500.77GT1-11人工基坑土方挖深2m以内m³23.8420.3103.53GT1-12人工基坑土方挖深2m以外m³27.0324.6602.37GT1-13人工沟槽土方挖深2m以内m³22.0919.1202.97GT1-14人工沟槽土方挖深2m以外m³24.4821.8302.65GT1-15人工挖冻土m³60.9357.840.172.92GT1-16场地平整石方普通岩石m³40.523.945.0931.49GT1-17场地平整石方坚硬岩石m³49.395.046.9437.41GT1-18基坑石方m³67.9714.4617.5635.95GT1-19沟槽石方m³53.9711.7810.7931.4GT1-20石方运距每增加1kmm³1.98001.98GT1-21施工降水坑槽明排水套·天509.76133.2321.8354.73GT1-22施工降水轻型井点降水系统安装与拆除m151.2749.3732.9668.94GT1-23施工降水轻型井点降水系统运行套·天1017.02114.686.15816.27GT1-24施工降水大口径井点降水系统安装与拆除根3803.48856.54584.382362.56GT1-25施工降水大口径井点降水系统运行套·天545.3913.16217.2315.03GT1-26施工降水喷射井点降水系统安装与拆除根1343.39318.79435.54589.06GT1-27施工降水喷射井点降水系统运行套·天2436.53201.7493.931740.9GT2-1条形基础砖基础m³386.9563.32318.25.43GT2-2条形基础毛石基础m³266.0648.93212.814.32GT2-3条形基础毛石混凝土基础m³375.6456.99311.047.61GT2-4条形基础素混凝土基础m³405.6270.27327.348.01GT2-5条形基础钢筋混凝土基础m³411.6673.24331.037.39定额编号名称单位基价人工材料机械GT2-6独立基础毛石混凝土基础m³355.5752.21296.866.5GT2-7独立基础素混凝土基础m³383.9153.75322.028.14GT2-8独立基础钢筋混凝土基础m³412.8561.75342.658.45GT2-9独立基础杯形基础m³417.9974.51337.386.1GT2-10筏形基础m³374.0655.63311.736.7GT2-11箱形基础m³395.3765.37321.338.67GT2-12设备基础汽机基础m³1075.8121.35927.5426.91GT2-13设备基础燃机基础m³549.1442.78496.799.57GT2-14设备基础锅炉基础m³469.6293.39362.7213.51GT2-15设备基础变压器基础m³372.8149.02315.258.54GT2-16设备基础变压器油池m³380.6371.8304.584.25GT2-17设备基础GIS基础m³431.4838.86384.657.97GT2-18设备基础主要辅机基础单体小于50m³m³405.0654.19341.559.32GT2-19设备基础主要辅机基础单体大于50m³m³355.2535.31312.287.66GT2-20地基处理钢管桩t6783.55148.56334.54300.51GT2-21地基处理打拔钢管桩t1563.0581.751192.43288.87GT2-22地基处理打拔钢板桩t163895.521234.41308.07GT2-23地基处理管桩桩芯填砂m³84.4816.2768.210GT2-24地基处理管桩桩芯填混凝土m³250.4819.44229.431.61GT2-25地基处理钢筋混凝土方桩m³1348.3253.981141.17153.17GT2-26地基处理钢筋混凝土管桩m³2234.39163.331843.7227.36GT2-27地基处理钢筋混凝土灌注桩机械钻孔m³1084.05162.07751.82170.16GT2-28地基处理钢筋混凝土灌注桩人工挖孔m³987.77257.72688.9641.09GT2-29地基处理钢筋混凝土支盘灌注桩机械成孔m³991.29123.76720.81146.72GT2-30地基处理砂石灌注桩m³228.5344.19120.663.74GT2-31地基处理碎石灌注桩m³215.1649.3395.7870.05GT2-32地基处理冲孔灰土挤密桩m³445.8371.09242.63132.11GT2-33地基处理水泥搅拌桩m³218.3240.4592.7385.14GT2-34地基处理换填土m³31.5623.9307.63GT2-35地基处理换填灰土m³85.4423.9353.887.63GT2-36地基处理换填砂m³102.1520.2475.526.39GT2-37地基处理换填碎石m³103.7121.9274.916.88定额编号名称单位基价人工材料机械GT2-38地基处理换填毛石混凝土m³274.0632.82234.097.15GT2-39地基处理换填素混凝土m³288.3132.67248.497.15GT2-40地基处理强夯300t·m5击以内m²36.664.64032.02GT2-41地基处理强夯300t·m每增加1击m²3.440.5102.93GT2-42地基处理强夯600t·m5击以内m²62.956.92056.03GT2-43地基处理强夯600t·m每增加1击m²7.210.7206.49GT2-44地基处理地下混凝土连续墙m³1581.4136.131120.18325.09GT2-45地基处理回填砂m³84.3713.8966.44.08GT2-46地基处理回填砂砾石m³92.0921.1866.634.28GT2-47地基处理堆载预压m³21.321.652.8316.84GT3-1汽机房与除氧间地下设施水泥砂浆面层m²223.3341.84174.437.06GT3-2汽机房与除氧间地下设施水磨石面层m²248.5358.59178.8511.09GT3-3汽机房与除氧间地下设施混凝土面层m²223.9141.44175.367.11GT3-4汽机房与除氧间地下设施地砖面层m²291.7548.32236.377.06GT3-5汽机房与除氧间地下设施环氧树脂耐磨自流平涂料面层m²258.5944.8206.737.06GT3-6汽机房与除氧间地下设施环氧砂浆耐磨面层m²328.353.18268.067.06GT3-7煤仓间与锅炉房地下设施水泥砂浆面层m²146.9322.87120.593.47GT3-8煤仓间与锅炉房地下设施水磨石面层m²167.236.61123.826.77GT3-9煤仓间与锅炉房地下设施混凝土面层m²130.8519.76107.663.43GT3-10煤仓间与锅炉房地下设施地砖面层m²205.827.99174.353.46GT3-11煤仓间与锅炉房地下设施环氧树脂耐磨自流平涂料面层m²175.9725.31147.193.47GT3-12煤仓间与锅炉房地下设施环氧砂浆耐磨面层m²233.2432.12197.653.47GT3-13阀厅地下设施环氧砂浆耐磨地面m²467.4463.79390.4813.17GT3-14阀厅地下设施环氧树脂耐磨自流平涂料面层m²409.3456.87339.313.17GT3-15保护室地下设施地砖面层m²415.2584.38316.5714.3GT3-16保护室地下设施环氧砂浆耐磨地面m²453.1988.67350.2214.3GT3-17配电室地下设施地砖面层m²255.2146.78201.267.17GT3-18配电室地下设施环氧砂浆耐磨地面m²274.3649.36217.837.17GT3-19半地下建筑地面水泥砂浆面层m²27.375.5621.670.14GT3-20半地下建筑地面水磨石面层m²37.7511.8524.591.31GT3-21半地下建筑地面混凝土面层m²30.125.8224.160.14GT3-22半地下建筑地面地砖面层m²49.647.6241.890.13定额编号名称单位基价人工材料机械GT3-23复杂地面水泥砂浆面层m²232.0442.8180.88.44GT3-24复杂地面水磨石面层m²254.5956.76186.411.43GT3-25复杂地面混凝土面层m²226.2241.53176.258.44GT3-26复杂地面地砖面层m²283.3547.88227.048.43GT3-27复杂地面环氧树脂耐磨自流平涂料面层m²255.5144.69202.398.43GT3-28复杂地面环氧砂浆耐磨面层m²302.249.93243.848.43GT3-29复杂地面橡胶地板m²255.0846.82199.838.43GT3-30普通地面水泥砂浆面层m²69.2313.8654.930.44GT3-31普通地面水磨石面层m²106.1534.3667.044.75GT3-32普通地面混凝土面层m²55.8811.2444.230.41GT3-33普通地面地砖面层m²142.3321.18120.70.45GT3-34普通地面饰面砖面层m²153.321.32131.530.45GT3-35普通地面花岗岩面层m²307.6824.61282.210.86GT3-36普通地面大理石面层m²321.5423.91295.532.1GT3-37普通地面环氧树脂耐磨自流平涂料面层m²109.0417.5491.040.46GT3-38普通地面环氧砂浆耐磨面层m²178.7525.94152.350.46GT3-39普通地面橡胶地板m²105.1720.3884.350.44GT4-1主厂房钢梁浇制混凝土楼板m²144.7833.2896.515GT4-2主厂房浇制混凝土有梁板m²174.6336.52122.4515.66GT4-3汽机运转层平台钢梁浇制混凝土板m²127.9926.9585.0915.95GT4-4汽机运转层平台浇制混凝土梁板m²144.2128.0299.8816.31GT4-5汽机中间层平台钢梁浇制混凝土板m²164.0634.44112.6117.01GT4-6汽机中间层平台浇制混凝土梁板m²183.2735.84130.0817.35GT4-7锅炉平台钢梁浇制混凝土板m²75.4618.7249.697.05GT4-8锅炉平台浇制混凝土梁板m²95.121.1366.337.64GT4-9其他建筑钢梁浇制混凝土板m²113.1328.0878.136.92GT4-10其他建筑预制混凝土板m²121.5839.5869.7912.21GT4-11其他建筑浇制混凝土板m²130.7733.9489.956.88GT4-12楼板与平台板压型钢板底模m²77.86077.860GT4-13楼板与平台板室外楼梯m²708.24175.31503.6129.32GT4-14屋面板汽机房预