水利水电工程专业毕业设计1目录第一章分标情况.............................................................................................................11.1工程情况说明:..............................................................................................................11.2分标..................................................................................................................................1第二章标底编制........................................................................................................-3-1.1标底编制的原则...............................................................................................................31.2主体工程的工程量清单...................................................................................................31.3主坝部分工程标底编制...................................................................................................51.4附表...................................................................................................................................9参考资料.........................................................................................................................14B江水利枢纽工程水利水电工程专业毕业设计3水利水电工程专业毕业设计-1-第一章分标情况1.1工程情况说明:枢纽主要由以下几个主要部分构成:主坝、副坝、溢洪道、引水隧洞、厂房以及上下游围堰、施工导流隧洞等临时工程构成。1.2分标1.2.1分标原则:分标是应遵循以下原则:(1)有利于施工总进度的实施;(2)按专业性质分标;(3)对控制进度的关键工程单独分标;(4)同一工程施工部位尽量合并在一个标段中;(5)在工程项目的划分上,尽量减少相互穿插和干扰;(6)业主负责“四通一平”等公用设施项目的建设(7)各标共用的辅助企业单独投标;、(8)分标不易太大、亦不宜过多;、(9)考虑了设备制造、设计周期、招标程序及各标段先后实施的顺序。1.2.2分标情况根据对整个工程的设计情况、枢纽的布置情况以及分标的原则,现将整个工程分为3个标段:第一标段:主坝、副坝、上下游围堰、施工导流隧洞总包标段、第二标段:引水隧洞及厂房标段、第三标段:溢洪道标段。第一标段:主坝、副坝、上下游围堰、施工导流隧洞总包标段分标依据:虽然主坝和副坝采用的是不同的材料主坝,对施工方可能会在施工技术上有更全面的要求,但考虑到主坝和副坝连接段得衔接问题是关键,关系着整个坝体的整体性,如果将主坝与副坝分开则会增加施工的难度,且施工质量不易保证,同理将上下游围堰放在这个标段中进行总包,有利于业主方的管理、便于控制工程质量故将其放在同一标段。B江水利枢纽工程-2-本标段主要施工任务:主坝部分:石方开挖约63467.29m³、砂砾料填筑、下游护坡、过度料填筑、垫层填筑、混凝土放浪墙、混凝土面板、趾板、帷幕灌浆、固结灌浆、复合土工膜的施工、坝顶路面的施工以及相应的、杆设备施工副坝部分:石方开挖约1133.15m³、混凝土。的施工、帷幕灌浆、固结灌浆、坝顶路面施工以及相应的栏杆、照明设备等的施工。围堰部分:围堰的填筑、钢筋网护坡第二标段:引水隧洞及厂房标段分标依据:厂房和引水隧洞的衔接是关系发电效率的关键,如果厂房和引水隧洞的衔接出现了问题则会对发电效率造成很大的影响,也会对施工工期造成影响,故将其放在同一标段。本标段主要施工任务:引水隧洞的开挖工程、引水隧洞的衬砌施工、相应的支护工程、厂房的地基开挖级相应的地基处理,厂房的施工、相应机电设备的安装、用电设施的安装等。第三标段:溢洪道标段:分标依据:溢洪道在本工程中是一个相当较独立的部分,故为了保证施工质量可以将其单独作为一个标段进行招标。本标段主要施工任务:溢洪道的开挖、引水段的施工、控制段的施工、泄槽段的施工、出口效消能段的施工以及闸门的安装。水利水电工程专业毕业设计-3-第二章标底编制1.1标底编制的原则标底编制应该遵循以下原则:(1)招标文件项目划分、工程量、施工条件等应与招标文件一致。(2)应该根据招标文件、设计图纸以及有关资料按照国家和有关部委颁发的现行技术标准、经济定额标准及规范等认真编制,不得简单的概算乘以系数或用调整概算作为标准。(3)在标底的总价中,必须按照国家规定列入施工企业赢的的7%的企业利润。(4)一个招标项目,只能有一个标底,不得针对不同的投标单位有不同的标底。(5)编制标底应不突破业主预算,未编制业主预算的则不应突破国家批准的设计概算中相应部分投资定额。1.2主体工程的工程量清单序号项目编号项目名称单位工程数量单价/元合价/元1主坝工程1.1建筑工程24721470.161.1.1500101土方开挖工程110879.481.1.1.1500101002一般土方开挖110879.48500101002001岸边趾板覆盖层清基m³1742.717.9613872.70500101002002河床趾板覆盖层清基m³201.939.651948.78500101002003坝基覆盖层清基m³9850.009.6595058.001.1.2500102石方开挖工程5333055.591.1.2.1500102001一般石方开挖5137168.13500102001001河床趾板基础开挖m³471.1810.925145.33500102001002堆石料开采m³469960.8710.925132022.801.1.2.2500102002坡面石方开挖57746.27500102002001岸边趾板基础开挖m³4066.3314.2057746.271.1.2.3500102007平洞石方开挖138141.20500102007001左右岸灌浆平洞开挖m³1470.0093.97138141.201.1.3500103土石方填筑工程6252606.881.1.3.1500103006过渡层料填筑m331891.6393.792991177.621.1.3.2500103007垫层料填筑m324320.2388.862161043.671.1.3.3500103008堆石料填筑1100385.59B江水利枢纽工程-4-500103008001主堆石区填筑m3286469.372.34670751.09500103008002次堆石区填筑m3183491.502.34429634.501.1.4500105砌筑工程439491.231.1.4.1500105001下游干砌块石护坡m33552.49123.71439491.231.1.5500106锚喷支护工程200180.73500106005预应力锚杆C20根50.002599.10129954.79500106011岩石面喷砂浆m22500.0028.0970225.931.1.6500107钻孔和灌浆工程653373.451.1.6.1500107005岩石层帷幕灌浆(42.5)530741.03500107005001钻帷幕灌浆孔m715.00117.2583834.54500107005002帷幕灌浆压水试验试段143.001215.46173811.38500107005003左右岸趾板帷幕灌浆m278.91385.93107638.08500107005004河床趾板帷幕灌浆m51.13330.0316873.60500107005005平洞帷幕灌浆m385.00385.93148583.431.1.6.2500107006岩石层固结灌浆(42.5)m100721.75500107006001钻固结灌浆孔m330.00117.2538692.87500107006002固结灌浆压水试验试段8.80813.207156.15500107006003左右岸趾板固结灌浆m278.91169.0347142.82500107006004河床趾板固结灌浆m51.13151.197729.921.1.6.3500107008检查孔钻孔m88.00248.9821910.661.1.7500109混凝土工程9400889.941.1.7.1500109001普通混凝土2936262.05500109001001混凝土面板C30m33755.10540.202028518.06500109001002混凝土防浪墙C20m3936.60522.46489336.13500109001003混凝土趾板C30m3778.31537.58418407.861.1.7.2500109007沥青混凝土路面C20㎡208.22126.0726250.141.1.7.3500109008止水工程6438377.75500109008001周边缝止水m253.55164.1141611.27500109008002面板垂直缝止水m1182.244552.085381652.39500109008003面板与防浪墙接缝止水m223.004552.081015114.091.1.8500110模板工程417299.291.1.8.1500110001普通模板60452.97500110001001防浪墙模板3043.9511.6335402.82500110001002趾板常规模板2153.8211.6325050.151.1.8.1500110002面板滑动模板m212043.9529.63356846.311.1.9500111钢筋、钢构件加工及安装工程1913693.571.1.9.1500111001钢筋加工及安装1913693.57500111001001趾板钢筋t34.688447.30292952.36500111001002面板钢筋t167.378447.301413824.60水利水电工程专业毕业设计-5-500111001003防浪墙钢筋t21.928447.30185164.82500111001004支护挂网钢筋t2.588447.3021751.801.3主坝部分工程标底编制1.3.1总概算表序号工程或费用名称建安工程费(万元)设备购置费(万元)独立费用(万元)合计(万元)一一至五部分投资第一部分建筑工程2713.3357第二部分机电设备及安装工程第三部分金属结构设备及安装工程第四部分临时工程79.82第五部分其它费用二基本预备费308.16三价差预备费385.2四企业利润318.18五总投资3804.701.3.2建筑工程概算表主坝工程序号项目编号项目名称单位工程数量单价/元合价/元1主坝工程1.1建筑工程24721470.161.1.1500101土方开挖工程1