369121518212427303336394245485154576063666972757881848790土方开挖31.74626砖胎模施工10.0621011垫层施工5.46611防水层施工186.9021626绑基础梁、集水坑、筏板钢筋609.531210支筏板侧模31.8041612浇基础梁、集水坑、筏板砼49.242522搭脚手架421014绑剪力墙、柱钢筋197.693216支剪力墙、柱模350.0354019浇剪力墙、柱砼6.88711支顶板梁、板、楼梯模412.463027绑顶板梁、板、楼梯钢筋160.063215浇顶板梁、板、楼梯砼6.88711外墙防水118.8582323土方回填1.03611搭脚手架41.371014绑剪力墙、柱钢筋108.652215支剪力墙、柱模198.762518浇剪力墙、柱砼5.468611支顶板梁、板、楼梯模392.682827绑顶板梁、板、楼梯钢筋111.832116浇顶板梁、板、楼梯砼5.6611搭脚手架59.8531514绑剪力墙、柱钢筋1062115支剪力墙、柱模180.742318浇剪力墙、柱砼5.164611支顶板梁、板、楼梯模395.2692927绑顶板梁、板、楼梯钢筋101.232015浇顶板梁、板、楼梯砼5.16611搭脚手架52.9141314绑剪力墙、柱钢筋107.062215支剪力墙、柱模180.12318浇剪力墙、柱砼5.088511支顶板梁、板、楼梯模395.2692927绑顶板梁、板、楼梯钢筋105.472115浇顶板梁、板、楼梯砼5.16611内外墙砌筑67621133搭脚手架52.9141314绑剪力墙、柱钢筋87.982214支剪力墙、柱模180.162318浇剪力墙、柱砼4.744511支顶板梁、板、楼梯模397.922927班制天数施工过程劳动量/工日人数层号基础层第一层第二层第三层第四层施工进度/天(7月)施工进度/天(8月)施工进度/天(9月)绑顶板梁、板、楼梯钢筋116.62216浇顶板梁、板、楼梯砼5.448611女儿墙砌筑49.8962512楼地面墙抹灰358.83420118内外墙面抹灰1144.3537215玻璃幕墙施工616.525125搭脚手架9.891011支剪力墙、柱、板、梁模64.4472213绑剪力墙、柱、板、梁钢筋28.6731512浇顶板墙、梁、板、柱砼1.2310.5屋面保温层施工41.3281014屋面防水层施工82.6692114零星、设备、其他12装饰机房层屋面第四层9397100103106109112115118121124127130133136139142145148151154157160163166169施工进度/天(9月)施工进度/天(10月)施工进度/天(11月)12月