7铁塔基础施工方案

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

XXXXXXXXXXXXXXX基础施工方案XXXXXXXXXXXXXXX年月批准:年月日审核:年月日编写:年月日目录一、编制依据...........................................................1二.工程概况............................................................31、工程内容........................................................32、基础工程量统计表................................................43、基础配置表......................................................6三、施工技术及工艺要求.................................................71、施工准备........................................................72、施工步骤........................................................7(1)基础分坑....................................................7(2)基础施工....................................................8A、掏挖基础施工..............................................9B、台阶基础施工.............................................13C、板式基础施工.............................................22D、灌注桩施工...............................................34(3)基础回填...................................................45(4)保护帽施工.................................................45(5)施工现场恢复...............................................46四、接地体施工.........................................................46五、人员组织及工器具配置表.............................................48六、质量通病及防治措施................................................51七、质量保证措施.......................................................55八、安全保证措施.......................................................57九、环境保护及文明施工.................................................59十、基础工程标准工艺...................................................61十一、基础工程安全固有风险识别、评估及预控措施.........................651一、编制依据:(1)《110~750kV架空电力线路施工及验收规范》(GB50233-2014)(2)《电力建设施工质量验收及评价规程第1部分:土建工程》(DL/T5210.1-2012)(3)《电力安全工作规程电力线路部分》(GB26859-2011)(4)《钢筋焊接及验收规程》(JGJ18-2012)(5)《钢筋焊接接头试验方法标准》(JGJ/T27-2014)(6)《输变电工程建设标准强制性条文实施管理规程》Q/GDW10248-2016(7)《普通混凝土用砂、石质量及检验方法标准》(JGJ52-2006)(8)《通用硅酸盐水泥》(GB175-2007/XG2-2015)(9)《混凝土用水标准》(JGJ63-2006)(10)《混凝土强度检验评定标准》(GB/T50107-2010)(11)《混凝土质量控制标准》(GB50164-2011)(12)《混凝土结构工程施工质量验收规范》(GB50204-2015)(13)《施工现场临时用电安全技术规范》(JGJ46-2012)(14)《国家电网公司输变电工程施工安全风险识别、评估及预控措施管理办法》(国网(基建/3)176-2018)(15)《国家电网公司电力安全工作规程(电网建设部分)》(试行)(16)《国家电网公司输变电工程安全文明施工标准化管理办法》(国网(基建/3)187-2015)(17)《110-750kV架空电力线路工程施工质量及评定规程》(DL/T25168-2016)(18)《国家电网公司基建安全管理规定》(国网(基建/2)173-2015)(19)《国家电网公司基建质量管理规定》(国网(基建/2)112-2015)(20)《国家电网公司电力安全工作规程(线路部分)》(Q/GDW1799.2-2013)(21)《输变电工程安全质量过程控制数码照片管理工作要求》(基建安质(2016)56号)(22)《国家电网公司施工现场安全管理条文汇编(输变电工程类)》(基建安全(2011)35号)(23)工程设计图纸、文件(24)本工程现场调查资料3二.工程概况1、工程内容线路部分:42、基础工程量统计表塔型基础型式基数D底长底宽埋深地脚螺栓小计钢筋小计C20/C25小计C30C30小计C15(垫层、保护帽)小计地质条件(M)(M)(M)(M)(kg)(t)(kg)(t)M3M3M3M3M3M31A3-ZM2掏挖基础101.9215.720.628890.553.6222.184000.114.4黄土合计100.62883.6228404.41A3-ZM1台阶基础41.81.81.815.7250.251656.40.90241.9130.56000.111.76黄土1A3-ZM2台阶基础41.81.81.915.7250.251659.220.947521.9431.04000.111.76黄土1A3-ZM3台阶基础11.81.82.215.7250.0629660.2642.058.200.110.44黄土1A3-J1台阶基础22.52.5349.80.3984146.531.172244.5936.72000.110.88黄土1A3-J2台阶22.72.73.249.80.398183.31.4665.544.000.110.88黄土5基础43649721A3-J4台阶基础23.23.23.774.1250.593338.82.71049.1573.2000.110.88黄土1A3-DJ板式基础33.33.33.3574.1250.8895708.9258.50715.869.6000.657.8黄土1D5-SJ1板式基础12.72.73.174.120.29648477.051.90824.0316.12000.481.92黄土1D5-SDJ板式基础14.14.13.95160.40.64161303.55.21410.0540.2000.953.8黄土合计203.78323.093350.36020.121A3-ZM1灌注桩20.8006.415.850.1268482.8253.8626005.0140.080.020.16黄土合计20.1273.86305.0140.080.16总计324.53930.577434.3640.0824.6863、基础配置表7三、施工技术及工艺要求1、施工准备准备铁塔基础图纸及技术资料,进行实地调查和勘测,以确认设计文件是否符合实际情况。若需改动,施工人员立即与项目管理人员及时反馈,等项目管理人员与建设单位、设计单位、监理单位协商后给出处理意见,再进行相应的更改。调查时应确认基础下无地下水和无湿陷、液化、孔穴、塌方等不良地质情况。地基开挖后,经验收槽持力层符合设计要求后方能施工基础,否则请及时通知,并同设计人员协商解决。如经调查后确定设计文件内容符合相关标准后,可对现场施工人员及进行安全、技术交底,然后根据设计文件确定基础坑位置定位放线。施工前应做好施工图纸会检,并根据施工图会检编制相关施工技术资料。做好基础施工原材料的取样、检验、见证取样及配合比试验工作。施工前做好施工人员的配备,做好施工人员的安全、质量培训工作以及做好电工、测工、机械操作手的操作证的复评工作。施工前应做好施工工器具的配备工作,施工工器具的数量及安全性应满足施工需要。施工前核对基础根开及地脚螺栓间距,与铁塔加工图有关尺寸确认统一无误后,方可施工。2、施工步骤(1)基础分坑8a、直线塔的分坑,在塔中心桩o安置仪器,前视或后视相邻塔中心桩,水平度盘对o度,然后经纬仪左右各转45度角定出辅助桩a.b.c.d.然后根据基础根开和坑口边长勾划四个坑位.b、转角塔分坑.分坑时,必须找出线路转角处内角平分线方向.根据塔型计算出位移距离,定出位移桩.然后以位移桩作为杆塔中心桩安置仪器.以内角平分线为基准线,转角杆在基准线上进行分坑.放线时,首先应进行塔基定位和标高引测,然后根据基础的底面尺寸、埋置深度、土质好坏等不同情况,考虑施工需要,从而定出挖土边线和进行放灰线工作。可用装有石灰粉末的长柄勺靠着木质板侧面,边撒边走,在地上画出灰线,标出基础挖土的界限。(2)基础施工山西吕梁市汾阳阳城110KV输变电线路工程2标段基础有掏挖式基础、台阶式基础、板式基础、灌注桩基础四种基础类型;其中掏挖式基础1A3-ZM2有10基;台阶式基础1A3-ZM14基、1A3-ZM24基、1A3-ZM31基、1A3-J12基、1A3-J22基、1A3-J42基;板式基础1A3-DJ3基、1D5-SJ11基、1D5-SDJ1基;灌注桩1A3-ZM12基,本工程基础全部采用商品混凝土进行浇筑,有商9品混凝土公司提供检验合格报告。A、掏挖基础施工本工程掏挖基础有10基。基础类型如下图所示①掏挖式基础的特点原状土掏挖式基础利用土体原有的力学性质,提高基础上拔抵抗力,具有充分利用原状土承载力、减少基础土石方开挖量、不用或少用模板、节约混凝土量、并取消回填土及其工作量,省工省料,经济安全。是一种较好的基础型式。掏挖式基础与板式、台阶基础相比较有下列特点:a施工步骤相对较少。施工时不需要大开挖、支模板、大量混凝土养生和回填夯实基础坑,减少了工器具的搬运。b承载能力强。施工时原状土层未受到大的扰动,充分利用了原状土体强度。10c对环境影响小。不需大开挖,施工中挖出的少许土可均匀撒开平摊,从而保护了植被。d施工安全性较差。在人力掏挖时,若地质条件不好,容易造成孔壁局部的垮塌;孔深,通风效果不好,施工人员的呼吸困难,要定时出孔呼吸新鲜空气。②施工工艺及要求掏挖式基础是隐蔽工程,由于无法对已浇灌的混凝土基础进行外观检查,因此必须采取妥善的施工措施,从成孔、浇灌等方面严格把关,以保证施工质量。a人力挖孔1.对塔位基面进行操平,并按施工作业指导书上数据进行分坑。2.根据基坑开挖尺寸先挖出样洞,深度约300mm。样洞直径宜比设计的基础尺寸小30~50mm。样洞挖好应及时复测根开、对角线等各项尺寸,合格后再继续开挖。3.基坑主柱开挖过程中为防止超挖,每挖掘500mm,在坑中心吊一垂球检查坑位及主柱直径。4.基础主柱开挖深度距设计要求埋深尚有100~200mm时,检查主柱直径正确后,用钢尺在主柱坑壁上量出基础底部扩大头挖扩位置线。

1 / 91
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功