成都高架特大桥桥墩施工专项方案中铁八局集团有限公司成渝铁路客运专线项目经理部第一分部-1-目录第一章编制依据及工程概况...............................................11、编制依据...........................................................12、工程概况...........................................................1第二章总体施工方案.....................................................2第三章施工准备.........................................................31、技术准备...........................................................32、劳动组织准备和物资准备.............................................33、现场准备...........................................................34、工期计划...........................................................35、保证工期的主要措施.................................................4第四章具体施工方案.....................................................51、墩身、顶帽模板设计.................................................52、模板施工...........................................................62.1一次浇筑完成桥墩模板施工......................................62.2分节浇筑桥墩模板施工..........................................73、钢筋工程施工.......................................................83.1钢筋加工......................................................83.3各种预埋件安装................................................103.4模板施工验收标准.............................................114、砼工程施工........................................................114.1砼浇筑.......................................................114.2施工接缝处理..................................................124.3砼养护........................................................124.4模板施工验收标准..............................................135、大体积砼温控措施..................................................145.1温控标准.....................................................145.2施工温度控制.................................................141、施工主要材料使用计划..............................................16成都高架特大桥桥墩施工专项方案中铁八局集团有限公司成渝铁路客运专线项目经理部第一分部-2-2、主要施工机械设备、仪器............................................173、主要劳动力计划....................................................17第五章质量保证体系及措施..............................................181、建立完善的质量保证体系............................................192、混凝土施工质量控制................................................193、模板施工质量控制..................................................204、钢筋质量控制......................................................20第六章安全保证措施....................................................211、模板施工安全措施..................................................221.1模板安装安全措施.............................................221.2模板拆除安全措施.............................................222、钢筋工程..........................................................232.1钢筋焊接.....................................................233、砼施工安全措施....................................................244、高处作业保护措施..................................................25第七章特殊时段的施工措施...............................................251、冬季施工措施......................................................252、夏季施工措施......................................................263、雨季施工措施......................................................26第八章施工环境保护体系及措施..........................................271、文明施工场地管理..................................................282、技术措施..........................................................282.1降低扬尘的措施...............................................282.2工地的清洁...................................................292.3工地噪音管理.................................................293、防止水污染措施....................................................30第九章架子队管理......................................................311、架子队的设置方案...................................错误!未定义书签。2、架子队人员职责.....................................错误!未定义书签。成都高架特大桥桥墩施工专项方案中铁八局集团有限公司成渝铁路客运专线项目经理部第一分部-1-第一章编制依据及工程概况1、编制依据1.1《中华人民共和国安全生产法》、《建设工程安全管理条例》、《铁路工程施工安全技术规程》等工程建设安全生产管理规定。1.2国家、铁道部、四川省现行环境保护、劳动保护有关法律、法规。1.3成渝客专公司编制的《成渝客专指导性施工组织设计》1.4中铁二院设计技术交底1.5中铁八局项目经理部编制的《CYSG-1标段实施性施工组织设计》1.6《成渝客专标准化工地建设实施方案》1.7《成渝客专标准化工地建设补充规定》1.8双线圆端形实体桥墩参考图(成渝施桥参02-2A)及通桥(2009)4301-Ⅱ1.9现场施工调查1.10中铁八局项目经理部编制的《施工作业指导书》1.11《客运专线施工质量验收暂行标准》(铁建设[2005]160号)1.12《客运专线铁路桥涵工程施工技术指南》TZ213-2005。1.13《高速铁路工程测量规范》TB10601-20091.14《铁路混凝土工程施工技术指南》TZ210—20052、工程概况成都高架特大桥主要采用简支梁结构,在本项目分部范围内跨越绕城高速和成昆铁路货运专线时,分别采用了1联(48+80+48)m连续梁和1联(40+64+40)m连续梁。本桥连续梁部分左线中心里程分别为DK7+149.07、DK9+494.41。全长20218.97m,本项目分部施工长度6.5km。桥墩高度在3m—14m范围内采用圆端实体垂直桥墩,高度在15m—25m范围内采用纵横坡比45:1的圆端实体倾斜桥墩。194#~197#墩、265#~268#墩为连续梁桥墩,均为垂直桥墩。共计桥墩数量198个。最低桥墩3m,最高桥墩20m。桥台采用矩形空心桥台;基础采用钻孔灌注桩基础,钻孔桩桩径采用1.0m、1.25m和1.5m。该段内重点工程为连续梁跨越绕城高速公路、成昆铁路货运线,难点是施工工期紧、征地拆迁工程量大,协调难度大。成都高架特大桥桥墩施工专项方案中铁八局集团有限公司成渝铁路客运专线项目经理部第一分部-2-第二章总体施工方案成都高架特大桥桥墩分为圆端实体垂直桥墩和圆端实体倾斜桥墩,两种桥墩采用不同的定型钢模板,现场进行翻模安装。模板上设置简易工作平台,工作平台采用角钢直接焊接在模板的横肋上,形成封闭的操作环境。提升设备采用汽车吊。砼采用自动计量集中拌和站统一提供的混凝土,采用混凝土运输车运输,采用泵车泵送入模。墩身施工采用分节浇筑的方法,间隔时间不宜超过五天,加强对接缝处混凝土的振捣。模板采用定型组合大块钢模板,砼浇筑使用泵车泵送入模。砼浇筑需预埋降温管,避免砼内外温差而产生温度裂缝;外部模板拆除后,在砼表面处于潮湿状态时,迅速用塑料薄膜包裹保湿养护。成都高架特大桥桥墩施工专项方案中铁八局集团有限公司成渝铁路客运专线项目经理部第一分部-3-第三章施工准备1、技术准备熟悉、审查施工图纸中各项内容及技术要求;做好原始资料的调查分析;编制施工方案及施工进度计划;对各个工班长进行技术交底工作。2、劳动组织准备和物资准备⑴、施工人员及施工机械已进场。⑵、工程材料准备。确定合格的材料供应商,所有原材在使用前按技术规范进行相关试验,并向监理部门报批;制定好材料进场使用计划;施工前合理安排材料进场,做好备料工作;对进场材

1 / 38
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功