动力环境集中监控系统工程施工方案目录第一章总则______________________________________________________1第二章监控系统的工程施工__________________________________________21.一般规定______________________________________________________________21.1系统的工程施工应满足下列条件:____________________________________________21.2具体要求___________________________________________________________________61.3墙上模块的安装_____________________________________________________________61.4屏内模块的安装_____________________________________________________________71.5自制机架内模块安装________________________________________________________72.变送器的安装__________________________________________________________72.1动力部分变送器的安装______________________________________________________72.2环境部分变送器的安装______________________________________________________103.特殊传感器的安装_____________________________________________________113.1烟雾传感器的安装__________________________________________________________114.用烟雾传感器标准模板在安用烟雾传感器标准模板在安装位置上做出安装孔的标记。__________________________________________________________________115.Φ6的电锤垂直在各标记处钻入与膨胀螺栓同等深度的孔。__________________116.将Φ5的塑料膨胀螺栓塞入孔内,端头与孔平齐。___________________________117.用配套的自攻螺钉将烟雾传感器的底座固定在天花板上。___________________118.按照设计的线槽走向用塑料膨胀螺钉将线槽固定。_________________________119.按照接线图接好监控模块与烟雾传感器之间连线。_________________________119.2门禁传感器_______________________________________________________________129.3积水探头的安装___________________________________________________________1210.线路的敷设__________________________________________________________1411.供电与接地__________________________________________________________1612.系统网络的安装______________________________________________________1613.施工工具____________________________________________________________1614.焊接工艺____________________________________________________________1615.导线连接工艺________________________________________________________1716.监控模块、被监控设备及线缆的标记方法________________________________1816.1模块标记________________________________________________________________1816.2设备标记________________________________________________________________1816.3监控系统中缆线、线号的标记原则__________________________________________18第三章监控设备的采点及模块的接线_________________________________181.监控设备的采点及接线原则_____________________________________________182.智能设备的采点与接线_________________________________________________193.室内环境的采点及接线_________________________________________________203.1温、湿度_________________________________________________________________203.2积水_____________________________________________________________________203.3盗警_____________________________________________________________________203.4火警_____________________________________________________________________20第四章监控系统的现场调试_______________________________________211.一般规定_____________________________________________________________212.部分监控量的精度指标_________________________________________________213.调试仪器、仪表、工具及软件___________________________________________224.安装后的模拟量调试___________________________________________________225.开关量的调试_________________________________________________________236.控制量的调试_________________________________________________________236.1温、湿度_________________________________________________________________236.2盗警_____________________________________________________________________236.3火警_____________________________________________________________________246.4积水_____________________________________________________________________241第一章总则本规范对通信动力电源及环境集中监控管理系统从工程施工、工程测试、系统调试等提出了相关规范和要求,达到加强工程管理,规范工程施工及测试,提高工程效率,保证系统的完整性及正确性,以及现场施工的质量。本规范是通信动力电源及环境集中监控管理系统工程实施的强制执行规范。监控系统工程注意事项1、施工前要认可在先,制定工程实施计划,严格按计划施工。2、施工时按技术方案及勘测资料施工,严禁随心所欲。3、施工按工程流程进行,切忌准备工作不充分。4、施工时对用户要求要分阶段及系统要求处理,合理解决或解释,切忌盲从。5、工程安装后进行模块级调试,严禁私自调整模块元器件参数。6、现场施工调试要求提供调试记录。7、测试要使用符合精度要求的专用仪器、仪表。8、软件安装及调试由专人负责。9、现场调试必须与中心调试相结合。10、工程实施中要做好文档记录,严禁口头交涉。2第二章监控系统的工程施工1.一般规定1.1系统的工程施工应满足下列条件:1.1.1施工人员熟悉施工图纸及资料,包括对工程特点、施工方案、施工流程、施工工艺、施工质量标准的了解1.1.2仪器设备、器材、辅材、工具等应满足连续施工和阶段施工的要求。1.1.3备有施工中的通讯联络工具。1.1.4在系统施工前应对建筑物有关情况进行检查,符合下列条件方可施工。a、室内装修完毕。b、地面、墙面的预留孔洞、地槽和预埋件等应符合设计要求。c、施工区域内能保证施工用电。d、当施工现场有影响施工的各种障碍物时应提前清除。1.1.5施工前应对系统使用的材料、部件和设备按下列要求进行检查。a、按照施工材料清单对材料进行清点、分类。b、各种部件、设备的规格、型号和数量应符合设计要求。c、产品外观应完整、无损伤和任何变形。d、工程施工要求a)具体要求i.按设备清单领料装箱原则上每个局站一个包装,以便及时督促安装是否按图纸要求进行,是否有材料丢失现象。每个局站包装内装箱单必须认真填写并签名。ii.按图表施工安装严格按照网络图、安装表格、模块传感器安装位置参考图进行施工,未经局方或本方技术督导同意,不得擅自修改;一经修改应及时汇报上级主管。iii.模块调试每装完一个模块或一个机房的模块后即刻通电并使用专用调试工具(笔记本电脑及专用测试软件)调试,调试时应核对模拟量精度、开关量接线准确性、参数名称、控制量的准确性,同时检查是否符合安装表格内容,发现精度有问题时应先检查仪表精度。确实存在问题3时,应更换模块。iv.预配置指根据工程设计图表所作好软件预配置。v.修改安装表格及图纸安装的模块经测试后,应核对原来的设计图表是否正确,确是不对之处应加以修正并通报项目负责人,修改后的资料为最后提供给用户的文档资料。vi.核对安装用材工程队根据安装设备清单领料,安装完成后,库房应对安装用材进行核对,及时发现丢失、设备损坏的情况并通报,以确保将安装中硬件损失降低到最低程度。vii.试运行指在交给用户试运行之前,公司将已安装好的局站逐个投入运行。投入试运行后的系统,其软件只允许保留与监控系统有关的文件,无关软件必须删除。e、施工中应遵守的准则a)施工队队领取的表格必须正确无误。b)安装材料的出入库应登记,工程完工后应对用材进行核对。c)每安装一个模块后必须就近对模块进行测试,并修正安装图表。d)安装图表的修改必须当场进行,不可拖延。e)所有现场使用软件必须经过软件部测试并只有软件部一个出口。f)所有测试有报告,发现模块有问题时,必须更换。g)所有修改有记录,设计图表的修改应有主管同意。h)安装完样板机房,必须请局方认可安装方式。i)监控中心软件必须测试完整。j)文档员必须专职、精通业务流程,所有现场资料应存档。k)试运行后必须对系统的准确性、完整性进行测试4f、系统应用软件配置施工流程图规划监控系统计算机IP地址分配依据方案安装硬件并调试对监控局站进行模块配置和界面配置组建监控系统局域网收集现场安装测试后的安装表根据用户对界面的要求进行调整