××客专(××至××段)线下工程沉降变形观测及评估方案××客运专线公司二〇××年×月目录第一章总则............................................................................................1一、适用范围......................................................................................1二、工作依据......................................................................................1第二章组织管理....................................................................................3一、职责分工......................................................................................3(一)建设单位.....................................3(二)施工单位.....................................3(三)监理单位.....................................4(四)设计单位.....................................4(五)咨询单位.....................................5(六)评估单位.....................................5二、工作程序......................................................................................5(一)施工单位.....................................5(二)监理单位.....................................6(三)设计单位.....................................6(四)咨询单位.....................................7(五)评估单位.....................................7(六)建设单位.....................................7第三章通用要求....................................................................................9一.沉降变形测量等级及精度要求..................................................9二.沉降变形监测网主要技术要求及建网方式..............................9三.沉降变形测量点的布置要求....................................................11四.沉降变形监测测量工作基本要求............................................12五.沉降变形监测观测具体要求....................................................12六.沉降变形监测平行检测工作....................................................14第四章专业要求..................................................................................15一、路基工程....................................................................................15(一)路基沉降变形观测............................15(二)路基工程沉降评估............................24(三)过渡段沉降变形观测..........................26(四)过渡段的沉降评估............................27二、桥涵工程....................................................................................28(一)一般规定....................................28(二)桥涵变形控制标准............................28(三)变形观测方案................................29(四)观测资料要求................................39(五)沉降评估....................................40(六)其他........................................43三、隧道工程....................................................................................43(一)一般规定....................................43(二)沉降观测的内容..............................44(三)沉降观测点的布置............................44(四)观测精度....................................45(五)沉降观测频度................................45(六)沉降评估....................................45四、综合评估....................................................................................47附件一:线下工程沉降变形观测及评估流程图............................48附件二:资料传递程序....................................................................50附件三:各单位责任人名单............................................................52附件四:附表....................................................................................53附表1工程沉降变形观测准备工作检查记录表.........53附表2工程沉降变形观测结果评估验收记录表.........54附表3沉降水准测量记录表.........................55附表4路基沉降观测记录表(沉降观测桩)...........59附表5路基观测桩沉降量记录汇总表.................60附表6路基沉降观测记录表(沉降板)...............61附表7路基沉降板观测记录汇总表(沉降板).........62附表8路基沉降板观测记录表(剖面管).............63附表9路基分层沉降观测记录表.....................64附表10路基分层沉降观测记录汇总表................65附表11路基边桩位移观测记录表....................66附表12路基边桩位移观测记录汇总表................67附表13过渡段沉降量记录汇总表....................68附表14桥梁墩台沉降观测汇总表....................69附表15桥梁墩(台)沉降量记录表..................70附表16桥梁墩(台)沉降量记录汇总表..............71附表17涵洞沉降量记录表..........................72附表18涵洞沉降量记录汇总表......................73附表19隧道沉降量记录表..........................74附表20隧道沉降量记录汇总表......................75附表21横剖面沉降测试记录表......................761第一章总则为指导××客专(××至××段)对路基(含过渡段)、桥梁、涵洞、隧道等线下工程的沉降变形观测、无碴轨道铺设条件的评估工作,制定本方案。无碴轨道铺设条件评估的重点应是线下工程的沉降变形,评估应综合考虑沿线路方向各种结构物间的沉降变形关系,以标段为单位实施。设计单位按照本指导方案,以标段为单位制定沉降观测设计方案。无碴轨道铺设条件的评估数据必须采用先进、成熟、科学的检测手段取得,且必须真实可靠,全面反映工程实际状况。沉降变形观测、评估过程是确定铺设无碴轨道的关键时间节点和关键工序的主要依据之一,必需加强初始值的过程控制。一、适用范围本方案适用于××客运专线路基(含过渡段)、桥梁、涵洞、隧道工程施工过程中的沉降变形观测及评估。二、技术依据1、《高速铁路工程测量规范》(TB10601-2009);2、《客运专线铁路无碴轨道铺设条件评估技术指南》(铁建设[2006]158号);3、《精密工程测量规范》(GB/T15314-94);4、《地面沉降水准测量规范》(DZ/T0154-95);5、《地面沉降监测技术要求》(DD2006-02);6、《国家一、二等水准测量规范》(GB/T12897-2006);27、《建筑变形测量规程》(JGJ/T8-99);8、《关于进一步规范铁路工程测量控制网管理工作的通知》(铁建设[2009]20号)9、《关于进一步加强客运专线建设质量管理的指导意见》(铁建设[2008]246号)10、铁道部和××客运专线公司的其他相关规定3第二章组织管理一、职责分工××客专(××至××段)线下工程沉降变形观测及其评估工作,是一项系统工程,需要参建各方各负其责、密切配合,确保观测数据及评估结果的真实、可靠。(一)建设单位建设单位负责沉降变形观测及其评估工作的领导和协调,并对过程进行监督检查。1.××公司负责全线线下工程的沉降变形观测及其评估工作的领导和协调工作,对沉降变形观测及其评估过程进行监督检查。2.各指挥部负责各自管段内线下工程的沉降变形观测及其评估的组织工作,对沉降变形观测及其评估过程进行监督检查。3.必要时组织专家对评估报告进行评审。(二)施工单位施工单位是沉降变形观测的实施责任主体,必须严格按有关规范、设计文件及总指要求做好各项工程施工过程的沉降变形观测,对观测数据的真实性负责。1.负责沉降变形监测网的建立及其保护工作。2.负责各种监测设备、仪器、管线的购置与埋设,及其观测设施的保护工作。3.配置专业人员,按规定监测项目和频率进行全过程监测和记录,并4按规定格式和内容提交观测数据,确保其真实性、可靠性和全面性。4.负责观测数据库的数据录入工作。5.参与沉降变形观测及评估方案的制定工作。6.参与和配合建设单位或评估单位组织的沉降变形观测评估工作。(三)监理单位监理单位对沉降变形观测过程进行全部监理,并派专业人员