留白1工程质量技术标准3:装修工程施工工艺和质量标准目录一、编制说明.......................................................................3二、装修工程施工工艺和质量标准.....................................................41.吊顶工程...........................................................41.1轻钢龙骨吊顶工程........................................................41.2窗帘盒安装..............................................................51.3石膏线安装...............................................................52.轻钢龙骨隔墙工程...................................................62.1施工工艺流程:...........................................................62.2施工要点:...............................................................62.3质量标准:...............................................................73.涂饰(乳胶漆)工程.................................................73.1施工工艺流程:...........................................................73.2施工要点:...............................................................73.3质量标准:...............................................................84.墙面铺装工程.......................................................84.1石材墙面湿铺贴..........................................................84.2饰面砖墙面铺贴..........................................................94.3木饰面墙面.............................................................104.4软包墙面...............................................................114.5裱糊墙面...............................................................125.地面铺装工程......................................................135.1地面砖、石材铺贴........................................................135.2实木、竹地板铺装........................................................136.窗台石、门槛石铺贴................................................156.1窗台石铺贴.............................................................156.2门槛石铺贴.............................................................167.现代家居安装工程..................................................167.1户内门安装..............................................................167.2强化复合木地板安装......................................................187.3橱柜安装................................................................197.4浴室柜安装..............................................................207.5浴室镜柜安装............................................................218.淋浴隔断安装......................................................228.1施工工艺流程:..........................................................228.2施工要点:..............................................................228.3质量标准:..............................................................229.龙头、花洒、卫浴五金安装..........................................229.1施工工艺流程:..........................................................229.2施工要点:..............................................................229.3质量标准:..............................................................2310.卫生器具及管道安装工程...........................................23留白210.1施工工艺流程:.........................................................2310.2施工要点:.............................................................2310.3质量标准:.............................................................2411.室内装修电气安装.................................................2511.1施工工艺流程:.........................................................2511.2施工要点:.............................................................2511.3质量标准:.............................................................26留白3一、编制说明由集团工程管理中心工程管理部编制的《碧桂园集团住宅装修工程施工工艺和质量标准》,是根据:1.《建筑装饰装修工程质量验收规范》GB50210-2001;2.《住宅装饰装修工程施工规范》GB50327-2001;3.《建筑地面工程施工质量验收规范》GB50209-2010;4.《建筑装饰装修工程施工质量标准》ZJQ00-SG-021-2006;5.《建筑涂料工程施工及验收规程》JGJ/T29-2003;结合碧桂园集团装修工程实际情况综合编制而成。本标准为试行版,各区域、项目在执行过程中如有疑问,请与集团工程管理中心工程管理部联系(联系人:朱湖广13929939488)。试行期间,工程管理中心收集、整理各方意见,调整成熟后出正式版。留白4二、装修工程施工工艺和质量标准1.吊顶工程1.1轻钢龙骨吊顶工程1.1.1施工工艺流程:1.1.2施工要点:1.天花吊顶主、次龙骨的规格、型号、封板厚度均符合设计要求;2.天花造型部分(包括跌级、灯槽、弧面、拱型)采用阻燃木骨架、阻燃夹板;3.金属预埋件,钢筋吊杆、型钢吊杆应进行防锈处理,木吊杆、木龙骨、木饰面必须进行防潮、防腐、防蛀、防火处理;4.安装龙骨前,应按设计要求对房间净高、洞口标高和吊顶内管道、设备及其支架的标高进行交接检验;5.根据吊顶的设计标高在四周墙上弹线,并进行龙骨排版弹线,位置准确清晰;6.主龙骨间距:小于1.2m,主龙骨与墙体间距不得大于300mm,主龙骨连接处应增设吊杆加强;7.主龙骨吊点间距应小于1.2m,吊杆应通直,距主龙骨端部距离不得超过300mm,当吊杆与设备相遇时,应调整吊点构造或增设吊杆;8.次龙骨间距不得大于600mm,在潮湿地区和场所,间距宜为300—400mm,相邻的次龙骨应错开连接;9.吊顶应按房间短向跨度的1‰—3‰起拱;10.吊杆应通直,当吊杆长度大于1.5m时,应设置反支撑;11.重型灯具、电扇及其他重型设备严禁安装在吊顶工程的龙骨上;12.饰面板安装前必须进行隐蔽工程验收,完成吊顶内管道和设备的调试和验收;13.安装双层面板时,上下层板的接通应错开,不得再同一根龙骨上接缝。相邻两块板之间应横撑龙骨安装隐蔽工程验收螺钉防锈处理补板缝贴防裂带刮第一边腻子、打磨刮第二边腻子、打磨刷乳胶漆底漆饰面板安装打磨处理定标高、龙骨排版弹线吊筋安装主龙骨安装次龙骨安装刷第一遍面漆刷第二遍面漆卫生清理分项验收分项验收留白5错缝拼接安装;14.螺钉与板边距离不得小于15mm,螺钉间宜为150~170mm,螺钉应进行防锈处理;15.饰面板缝需进行防裂处理,板缝顺直、宽窄一致、两板间缝隙为均匀的3-5mm;16.不同材质交接处或板材间交接处采取防开裂措施。1.1.3质量标准:1.龙骨、吊筋、饰面板安装符合设计及规范要求,安装必须牢固,整体完好;2.饰面板表面平整洁净、色泽一致,吊顶无开裂、破损、翘曲、污垢等情况;3.饰面板上的灯具、烟感器、喷淋头、风口篦子等设备,位置合理、美观,套割尺寸准确、边缘整齐,与饰面板的交接应吻合、严密;4.金属吊杆、龙骨的接缝均匀一致,角缝吻合,表面平整,无翘曲、锤印。木质吊杆、龙骨顺直,无劈裂、变形;5.允许偏差:吊顶表面平整度3mm,接缝直线度3mm,接缝高低差1mm。1.2窗帘盒安装1.2.1施工工艺流程:1.2.2施工要点:1.窗帘盒宽度应符合设计要求,当设计无需求时,窗帘盒宜伸出窗口两侧200-300mm,窗帘盒中线应对准窗口中线并使两端伸出窗口长度相同,窗帘盒下沿与窗口上沿应平齐或略低;2.当采用木双包夹板工艺制作窗帘盒时,遮挡板外立面不得有明榫、露钉帽,底边应做封边处理;3.窗帘盒底板可采用后置埋木楔或膨胀螺栓固定,遮挡板与顶棚交接处宜用角线收口,窗帘盒靠墙部分应与墙面紧贴;4.窗帘轨道安装应平直,窗帘轨固定点必须在底板的龙骨上,连接必须用木螺钉,严禁用圆钉固定。采用电动窗帘轨时,应按产品说明书进行安装调试。1.2.3质量标准:1.窗帘