南平联络线A3标夜间施工方案(最终)

整理文档很辛苦,赏杯茶钱您下走!

免费阅读已结束,点击下载阅读编辑剩下 ...

阅读已结束,您可以下载文档离线阅读编辑

资源描述

南平联络线高速公路A3合同段夜间施工方案1目录一、工程概况..........................................................................................................................................1二、夜间施工措施..................................................................................................................................1三、路基夜间施工措施..........................................................................................................................2四、桥涵夜间施工措施..........................................................................................................................3五、隧道夜间施工措施..........................................................................................................................4六、夜间施工临电安全措施..................................................................................................................51、接地与接零保护措施...................................................................................................................52、配电箱、开关箱...........................................................................................................................53、现场照明.......................................................................................................................................54、配电线路.......................................................................................................................................5七、夜间施工质量安全保证措施..........................................................................................................51、施工措施.......................................................................................................................................52、基本原则.......................................................................................................................................63、加强夜间施工安全防护...............................................................................................................74、安全保证措施...............................................................................................................................7八、噪声控制措施..................................................................................................................................71、土石方阶段噪声控制措施...........................................................................................................72、桩基阶段噪声控制措施...............................................................................................................83、结构阶段噪声控制措施...............................................................................................................84、总体降噪措施...............................................................................................................................9九、应急预案..........................................................................................................................................91、坍塌应急预案...............................................................................................................................92、机械伤害应急预案.....................................................................................................................103、电气伤害应急预案.....................................................................................................................12南平联络线高速公路A3合同段夜间施工方案1南平联络线高速公路A3标项目经理部夜间施工方案一、工程概况南平联络线高速公路项目起于南平市延平区西芹镇下马石村,设西芹互通与国高网长深线及海西网南平至顺昌高速公路相连,经夏道、南山、赤门、终于洋后镇中洋村,与国高京台线建瓯至闽侯高速公路中洋枢纽互通相连接,路线全长46.34公里。本合同段施工桩号YK8+300~K13+370,线路全长5.07km。本标段共有大桥408米/1座,隧道2516米/1座,为左右线分离式隧道;涵洞通道297.19米/7道。路基土石方挖方68.57万方,填方74.49万方,弃方12.1万方。本标段合同竣工工期为2015年11月14日。为了保证节点工期,顺利完成本标段的全部施工任务,保证施工的连续性,保证施工安全和施工质量,合理有效的组织夜间施工已经成为我们和时间赛跑追必要途径。因此,我标段制定了夜间施工方案。二、夜间施工措施1、施工组织准备项目部成立夜间施工领导小组,组成如下:组长:赵延军(项目经理)副组长:翁伟凡(项目常务副经理)王海涛(项目总工)程平(项目副经理)徐伟(安质部长)成员:赵凌春、王震宇、贾玲玲、陈谊、陈良腾、罗刚、金犬良、林各云、专职安全员、值班工班长2、对需要夜间施工区段内照明设施进行安装及逐一检查。做到施工时照明设施能够正常工作、无照明死角,并准备备用电源。3、搞好“三宝”的利用和“四口”的防护,洞口临边、结构上四周临时周边,包括基坑内临时降水坑等、必须设置安全防护措施。夜间施工因为光线不足、个别南平联络线高速公路A3合同段夜间施工方案2工人对现场不熟悉、工人困乏。所以对“三宝”“四口”的使用防护意义重大。4、施工现场材料堆放应尽量远离夜间施工区段,对拆模出的模板、对拉螺杆、钢管以及钢筋不得乱抛乱丢,不得摆放在临时通道附近。5、临电按施工组织设计的要求架设,符合安全技术操作规程的规定,手持照明灯具和潮湿场所的照明要用低压电源。线路走向要提前进行梳理,不得私拉乱接。防止夜间施工的安全隐患。6、在夜间施工前,排好夜间施工、安全管理人员名单和材料接收人员。防止施工时无人管理的现象。7、项目经理部各部门建立夜间施工领导值班和交接班制度,加强夜间施工管理与调度。在项目经理部设置夜间值班室;在施工现场安排现场值班室。8、加强夜间噪音、光源处理。9、施工现场设置明显的交通标志、安全标牌、警戒灯等标志,标志牌具备夜间荧光功能。保证施工机械和施工人员的施工安全。10、施工现场设置明显的交通标志、安全标牌、警戒灯等标志,标志牌具备夜间荧光功能。保证施工机械和施工人员的施工安全。11、在人员安排上,夜间施工人员白天必须保证睡眠,不得连续作业。三、路基夜间施工措施路基施工原则是不安排夜间施工。若无法避免有特殊情况,必须做好夜间施工安排,有专人对设备进行指挥,在临边设置安全反光标示。振动碾压不得安排在夜间施工。路基夜间施工注意事项:①夜间挖土石方要有充足的照明;②人工挖土方时应由上至下,逐层挖掘,前后操作人员间距不应小于2~3M;③机械挖土,操作中进铲不应过深,提升不要过猛;④机械挖土,不要在输电线下工作,配合拉铲的工人不准在机械回转半径下作业。⑤作业范围内拉警戒线和设置反光标志,无关人员严禁进入现场,车辆应按规定速度行使,有专人指挥。⑥沿开挖线路每30m设一有防护罩的碘钨灯供场区照明;机械开挖时挖掘作业总照明以挖掘机自带灯为主,局部辅以手持式电筒照明。在挖掘机作业时回旋范围南平联络线高速公路A3合同段夜间施工方案3内禁止人员进入,挖掘机作业时应有专人指挥。需进入回旋范围查明地下有关情况时,挖掘机应处于停止作业状态,必要时应熄火。四、桥涵夜间施工措施本桥为高墩桥梁,墩柱施工从安全角度不考虑夜间施工。若浇筑混凝土等不得已超过夜间22:00,首先要做好减少噪音扰民,桩基施工若无法避免夜间施工,在施工前要与当地居民告知,取得村民同意后方可进行施工。并做好以下措施:1、夜间施工时,做到晚交班早点名制度,应根据作业内容,制订周密的安全措施,进行针对性的安全技术交底,落实到人;2、所有参加夜间施工的作业人员必须认真贯彻夜间作业安全措施,安检人员进行监督、检查落实;尽量避免同一作业范围内安排交叉施工的工序同时在夜间进行,如确需交叉施工时,

1 / 15
下载文档,编辑使用

©2015-2020 m.777doc.com 三七文档.

备案号:鲁ICP备2024069028号-1 客服联系 QQ:2149211541

×
保存成功