xxxxxx太阳能光电建筑示范项目施工组织设计编制:项目经理:审核:审批:编制单位:xxxxx编制日期:二零一二年五月十五日“黑龙江xx能源太阳能光电建筑示范项目”施工方案2目录一编制依据及原则.......................................61.1编制依据.............................................61.2编制原则.............................................61.3执行标准及规范总汇....................................6二工程概述.............................................72.1参建单位.............................................72.2工程简介.............................................7三项目管理.............................................73.1成立项目组织.........................................73.2项目管理目标.........................................8四主要分部、分项工程的施工工艺、方法...................84.1材料与设备的运输......................................84.2支座的安装...........................................94.3铝型材支架的制作及安装................................94.4装饰施工工艺..........................错误!未定义书签。4.5电气施工工艺........................................11五施工部署及平面布置图................................175.1施工准备............................................175.2施工平面布置........................................19“黑龙江xx能源太阳能光电建筑示范项目”施工方案3六施工进度计划及工期保证措施..........................206.1施工计划部署........................................206.2施工进度计划横道图...................................206.3工期保证措施........................................20七主要施工机具、材料、劳动力部署......................247.1施工机具型号、数量的配备及部署.......................247.2主要材料与设备进场时间部署...........................247.3劳动力部署..........................................25八施工重点、难点分析及应对措施.........................268.1基础放线............................................268.2汽车吊装............................................268.3高空作业............................................27九成品及半成品保护措施................................289.1工厂制作成品保护措施................................299.2运输过程中成品保护措施..............................309.3工程材料存储保护....................................309.4施工现场成品保护....................................329.5金属屋面保护措施.....................................32十工程质量标准及质量保证措施..........................3410.1质量标准...........................................34“黑龙江xx能源太阳能光电建筑示范项目”施工方案410.2项目质量管理体系....................................3410.3项目部成员质量职责..................................3410.4质量保证措施及质量控制管理..........................36十一现场安全施工及用电措施............................3811.1安全管理方针和目标..................................3811.2安全管理制度.......................................3911.3安全生产责任制.....................................4011.4安全教育...........................................4011.5安全用电措施.......................................41十二现场文明施工措施..................................4212.1文明施工目标.......................................4212.2文明施工管理机构....................................4212.3现场管理原则.......................................4212.4建立岗位责任制.....................................4212.5文明施工措施.......................................42十三施工安全应急预案...................................4313.1实施细则...........................................4313.2培训和演练.........................................4413.3应急响应级别.......................................4413.4应急响应...........................................4513.5应急恢复...........................................46“黑龙江xx能源太阳能光电建筑示范项目”施工方案513.6现场急救措施.......................................4613.7善后工作...........................................4913.8事故报告...........................................4913.9应急救援预案评审与改进..............................5013.10现场重大危险源的确定与预防措施.....................50“黑龙江xx能源太阳能光电建筑示范项目”施工方案6一编制依据及原则1.1编制依据本光伏发电系统施工方案根据专业分包合同、设计图纸、现行施工规范标准、房屋建筑强制性条文、建筑质量管理条例和答疑文件等编制而成。我公司按照施工承包合同的要求,将根据有关部门资料,以本方案为依据,制定更加完善、详尽的光伏发电系统施工方案。1.2编制原则适用、经济、安全、合理。1.3执行标准及规范总汇《工程测量规范》GB50026-2007《钢结构设计规范》GB50017-2002《屋面工程质量验收规范》GB50207-2002《施工现场临时用电安全技术规范》JGJ46-2005《钢结构工程施工质量验收规范》GB50205-2001《建筑施工高处作业安全技术规范》JGJ80-91《建筑机械使用安全技术规范》JGJ33-2001《建筑施工安全检查标准》JGJ59-2011《建筑安装工程质量检验评定统一标准》GB50300-2001《电气装置工程及验收标准》GB50303-2002《建筑装饰装修工程质量验收规范》GB50210—2001《太阳光伏电源系统安装工程施工及验收技术规范》CECS85-96《铝合金建筑型材》GB/T5237-2000《碳素结构钢》GBT700-2006《建筑用硅酮结构密封胶》GB16776-2005“黑龙江xx能源太阳能光电建筑示范项目”施工方案7二工程概述2.1参建单位业主单位:xxxxxxxxxx能源开发有限公司总承包单位:xxxxxxxxxx2.2工程简介为落实国务院节能减排战略部署,加快太阳能光电技术的推广应用。xxxxxxxxxx能源开发有限公司投资建设光电建筑示范项目,该项目为交钥匙项目。xxxxxxxxxx能源太阳能1.5MW光电建筑示范项目,安装在沈煤鸡西隆丰矿山机械制造有限公司的六个屋顶上:南区南厂房291.87KW,南区北厂房304.56KW,北区东一号厂房366.6KW,北区东二号厂房296.1KW,北区西厂房北车间43.2KW,北区西厂房南车间198.72KW。xxxxxxxxxx负责该项目的设计(初步设计、施工图设计)、设备及材料采购、运输、施工、安装、调试、人员培训及技术服务。三项目管理合同签定后至最终验收前,按下图(图1)所示流程进行。图1:工程建设业务流程图3.1成立项目组织为保障该项目的顺利实施,项目立项后,xxxxxxxxxx将成立高效的项目组织机构(见表1),建立顺畅的协调机制,项目组织机构具有项目管理、技术支持、成立项目组织工程策划桥架安装电气设备安装电气连接调试试运行工程质量检查放线、支座安装支架安装开工到货工前准备订货深化设计工程勘测电池组件安装专项验收“黑龙江xx能源太阳能光电建筑示范项目”施工方案8质量控制、协调指挥等职责。项目组织由项目领导小组的统一指挥。项目组织机构施工单位职务负责人职称主要职责xxxxxxxxxx项目经理工程师项目的整体控制现场负责人工程师负责项目的进度、质量、计划技术负责人工程师负责整个项目的技术工作施工员助工负责现场施工安全员助工负责项目安全质检员助工负责项目质量预算员助工负责项目预算,工程量申报材料员助工负责材料的进场、保管、发放表1:xxxxxxxxxx能源太阳能光电建筑示范项目组织机构3.2项目管理目标通过项目组织机构所有成员的共同努力,保质量、保安全、保工期地把xxxxxxxxxx能源太阳能光电建筑示范项目建设成精品工程,成为黑龙江省太阳能发电项目的典范。四主要分部、分项工程的施工工艺、方法4.1材料与设备的运输该工程是一个小型太阳能并网发电系统工程,考虑到我们总包单位的办公地点在济南,离工程地点鸡西十分遥远,十分不利于整个工程项目的材料运输。为了便于工程施工,节约工程成本、缩短发货时间,本工程的材料、设备的运输主要通过物流公司运输,即主要工程材料、设备直接让生产厂家通过物流公司发货至南宁,而太阳能电池组件的运输,由于数量较多、且产品较为贵重,考虑