技术负责人:注:示意图应注明中线、测点号、测点水平距、站石、人行道等桩号项目K0+020K0+040横断面测点示意图测量人:记录人:校核人:横坡偏差值(%)-0.200-0.1140.000-0.1710.314实测横坡(%)1.7001.6141.5001.6711.186设计横坡(%)1.5001.5001.5001.5001.500高程偏差值(m)0.0150.0100.0080.011-0.003设计高程(m)327.456327.482327.508327.482327.456实测高程(m)327.441327.472327.500327.471327.459前视读数(m)2.4352.4032.3752.4042.417横坡偏差值(%)0.286-0.5710.000-0.8570.571实测横坡(%)1.2142.0711.5002.3570.929设计横坡(%)1.5001.5001.5001.5001.500高程偏差值(m)-0.0050.0150.0050.020-0.015设计高程(m)327.568327.594327.620327.594327.568实测高程(m)327.573327.579327.615327.574327.5831011前视读数(m)2.3032.2962.2602.3012.293测点编号及测量数据123456789记录编号ZQ1施工单位四川旭辉建筑工程有限公司水准点编号及高程(m)ZQ1,329.225仪器高(m)测量日期年月日C5道路高程测量成果记录表工程名称长明科技园局部景观和内部道路工程-内部道路1分项名称路基工程后视读数(m)0.65